My WebLink
|
Help
|
About
|
Sign Out
Home
2019 05-07 PC PACKET
GemLake
>
PLANNING
>
PACKETS
>
2010 - 2019
>
2019
>
2019 05-07 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 3:23:02 PM
Creation date
1/5/2026 9:01:48 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
PC MEETING
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
Show annotations
View images
View plain text
2. PlanningCommission: (15t:Tuesday of the month at 7:00 p.m. at Heritage Hall. Zoning. Administrator <br />schedules public hearing date :and provides information to the: White Bear Press for time and place of <br />hearing). <br />(Date of Planning Commission meeting) <br />3. City Council: {3,d Tuesday ofthe nionth at 7:00 p.m., Heritage Hau, 4200,Otter Lake Road. <br />(Date of the City Council meeting) <br />Standards: <br />The. City Council will approve a .Conditional Use Permit oniy.if the following facts are established: <br />L There will be no detraction from the appearance: of adjacent properties, or. Town as a whole. <br />2. These will not be aesthetic incompatibility. <br />3. There willnot be aural incompatibility {noise}. <br />.4: There will not:be damage fo vegetation. <br />5. Traffic patterns will not be negatively affected. <br />&. 'There is no unnecessary loss of existing natural features. <br />7. Will not cause soil erosion. <br />8. Will not increase flood potential. <br />9.: The. proposal is: consistent with Comprehensive Plan and complies with other Ordinances. <br />It. is the policy of the City of Gein Lake that ail identifiable costs associated with :Conditional Use Permits <br />within the City shall be the sole responsibility of the owner of said property. The costs shalt include, but are <br />not limited to the following: <br />Y City planning review costs (reports; meetings) site review}; <br />0 Engineering review costs; <br />a Legal costs (preparation of hearing notices, .legal. research, certification costs); <br />■ Publication costs. {notice of. hearing}; <br />Reapportionment of. assessments (engineers report) <br />■ Ma.ilings and 0wnership.Ieportw; <br />s (Ownership/encumbrance). brance). <br />Prior to the final hearing or determination by the CityCouncil, all City expenses shall be paid by the owner. <br />Subserluent expenses not paid at the ..time. of final hearing or determination by the City (due to billings. by <br />consultants; etc.Yshall be paid within.30..days. upon receipt of a billing from the City. The application will be <br />considered incomplete until all costs are paid to the City. <br />•_ <br />Signature of Applicant (s) <br />;w <br />Date <br />o he completed by the City: <br />r.:.f <br />Date. request received: <br />Conditional Use permit (other than a PUD $75.00 plus $200 escrow for review) paid; <br />Date Application Complete: r <br />11MIS conditional use.permit <br />
The URL can be used to link to this page
Your browser does not support the video tag.