Laserfiche WebLink
Section.'2 <br />Electrical Permits <br />Homeowners and Electrical Contractors: <br />Complete an electrical permit form available fibm the Building.jpspectionsDiAsion. Add $L00for State surebarge.to the <br />total cost of each permit. ..The fee is the total, of the listed fees or the total number of inspection*trips x-.$45.00; whichever <br />is.greater. <br />Residential panei.replacemenf-is �10.00, sub panel- $45.00 <br />New-seryice.or-power supply is:. <br />0 to.300 Amp <br />$55.00 <br />400 Airip <br />$71.00 <br />500. Amp <br />$87.00 <br />*600 Amp <br />$.10i6o <br />$00 Amp <br />$1350d <br />1000 Amp <br />$167.00 <br />Add S10,00 for each additional 100 Amps <br />Minimum Fee., <br />Minimum permit fee is $45.00. plus $:1.00 <br />State surcharge. This is for -one inspection <br />only. Minimum fee for rough -in and final. <br />inspection is $90:00 plus.$.1.00 State <br />surcharge <br />Circuits: and Feeders: <br />0 to 100 Amp <br />.$9,00 <br />101 to 200 Amp <br />$1.50 <br />201 to,300 Arne <br />$21.00 <br />301 to 400.Amp <br />$27:00 <br />401 to Sb0 Amp <br />$33.00 <br />501 to 600,Amp <br />$3.9:00 <br />Add. $&00* for each additional 100 Amps <br />Maximum Fee: <br />Maximum fee for a single family dwelling or townMouse. <br />not over.200.amps (No max. if service is over.200 amps) <br />is $190.00 plus $1.00 State surcharge. Maximum of 2 <br />rough -rift's and 1 final inspection. (Failed inspections are <br />an additional $45.00 each) <br />Apartment Buildings <br />Fee per.unit of an apartment or-cortdomimum complex is $8.0.00. This -does-not coverservice, unit feeders or house` <br />panels. <br />Swimming Pools. and Hot Tabs: <br />Additions, Remodels. orBasement Finishes: <br />Residential. Accessory Structure: <br />Traffic Signals: <br />Street and Parking Lot. Lights: <br />Transforifters and Generators: <br />up to t0.kva $5.00. <br />75 kva to 299 kva $60.00 <br />Retrofit Lighting: <br />Sign Transformer of Driver: <br />Low voltage fire alarm, low voltage 46atiingAod <br />air conditioning control miring: <br />Re -Inspection Fee: in addition to, all other fees; <br />Hourly rate for. carnivals: <br />Solar Foes: <br />0 kw to 5 kw $90.00. <br />10.1 kw to:20 kw $225,00 <br />30.1 kw to 4.0 kw $3*75:00 <br />$96,00 plus circuits at $9.00 each.. Includes 2:inspections <br />.$90.00 includes up to 10'circuits.and 2 inspec4ons <br />The greater of $55.00 for panel: plus $9.00 per -circuit or $90.00 <br />for 2 inspections <br />$8.00 per each standard <br />$5:00.per each standard <br />11 kva to 74 kva $40.00'. <br />Over 299 kva $.1-65.00 <br />$0.85 per device <br />$9.00 per transformer- <br />$0.0-per device <br />$45.00 <br />$90.00 <br />5,1. kw id-14 kw $1:50.00 <br />.20.1 kw to 30 kw $300.00 <br />40.1 kw and larger $375.00 plus $25.00 each additional 10 kw <br />Electronic insaection.fee: for these items only;, <br />Furnace, air conditioning;. bath fall; fireplace or receptacle for water heater vebtis $40.00 <br />Refunds must be.requested:in writing:.No refunds unless more than the minimum fee. Refunds are minus'the cities <br />20%handling fee. <br />THE PERMIT FEE IS*DOUBLED IF THE WORK -STARTS BEFQRE THE PERMIT IS ISSUED. <br />Updalcd 0 1/0 112022 6' <br />