Laserfiche WebLink
1/18/2022. <br />J�ity.of Gem Lake, <br />Water Supply Feasibility Study Update <br />Presentation of Draft Report 1 Initial Findings <br />January 18, 2022 <br />A <br />SEH <br />1 <br />Background <br />• 20.06 Municipal Water Supply Feasibility. Study <br />— Evaluated potential for constructing an independent water system,. as <br />well as a ..city-wide water distribution system with.source water <br />provided by one :of the neighboring communities. <br />Existing Conditions <br />- Majority of residents on private wells <br />— Connection with Vadnais Heights that serves the. Villas of Gem take <br />— Vadnais Heights also provkles.water•to Tous.ley Ford and White Bear <br />Montessori School <br />— Connection with Whits Bear Lake serving commercial district <br />Recent Water Quality Concerns <br />— Recent MPCA and MPH .sampling for 1,4-dioxane, a likely human <br />carcinogen, in private wells. <br />-- 1,4-dioxane levels above the MOH health -based gu[danipe value in <br />some private wells in Gem Lake <br />A <br />S E H BW10#9 a Botwm Abdd Jor Ali a•us, <br />2 <br />I <br />