My WebLink
|
Help
|
About
|
Sign Out
Home
2022 01-18 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2022
>
2022 01-18 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 7:49:53 AM
Creation date
1/8/2026 7:42:49 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
Show annotations
View images
View plain text
A. <br />SEH <br />BL.11tling .� <br />nAll 0' <br />January 13, 2022 <br />Gretchen Artig-Swomley, Mayor <br />City of Gem Lake <br />4200 Otter Lake Road <br />Gem Lake, MN 55110 <br />Dear Mayor Artig-Swomley. <br />RE: Gem Lake Municipal Water Supply <br />Feasibility Report <br />City of Gem Lake, MN <br />SEH No. GEMLK 163931 <br />We are pleased to present you with an updated Municipal Water Supply Feasibility Report for the City of Gem <br />Lake. Like the 2006 Municipal Water Supply Feasibility Study, this water supply feasibility study evaluates the <br />potential for a centralized water distribution system within Gem Lake to provide a safe and reliable source of <br />water to all residents and businesses within Gem Lake. <br />Since Gem Lake does not intend on having their own water supply source, the City must rely on the surrounding <br />communities to provide water to the Gem Lake water distribution system. Accordingly, the purpose of this study <br />was to evaluate Gem Lake water demand, and water quality and availability of neighboring community water <br />distribution systems to provide high quality water to meet the needs of Gem Lake. Hydraulic modeling was <br />performed to determine feasibility of neighboring systems providing the necessary water and to determine the <br />conceptual sizing of necessary water mains and other water distribution system infrastructure. This report <br />presents the results of our analysis. <br />It is our pleasure to assist the city of Gem Lake with this project, and we look forward to discussing this report and <br />potential next steps with you. If you have any questions about this report, please contact me at 651.368.3460. <br />Sincerely, <br />Richard Parr, PE <br />Project Manager <br />(Lic. IL, MN, VA) <br />RJP <br />x1f11g1gemlx116393114-prelim-dsgn-rptsVeponlgem lake municipal water supply feasibility report_20220112_draft.docx <br />Engineers I Architects I Planners I Scientists <br />Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St Paul, MN 55110-3507 <br />651.490.2000 1 800.325.2055 1 888.908.8166 fax I sehinc.com <br />SEI1 is 100 % employee -owned I Affirmative Action -Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.