My WebLink
|
Help
|
About
|
Sign Out
Home
2022 03-15 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2022
>
2022 03-15 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 7:53:50 AM
Creation date
1/8/2026 7:49:53 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
Show annotations
View images
View plain text
Review Process <br />I. Submit 15 copies of application and all. supportin$.information to the City Zoning Administrator(minimum of four (4) weeks prior to the Planning <br />Commission Meeting. <br />2. Planning Commission: T" Tuesdday of the. montli at 7.00 p.m. at Fleritage.Hall, 4200 Utter Lakc Road, The.2uning Administrator schedules public hearing <br />dates and provides information to the White Bear Press for tlie.dinc and place of the hearing: <br />Platining Commission Meeting Date: <br />3. City Council: 30 Tuesday of the month: at 7:00 p,m: at .Heritage Hall, 4200 Otter Lake Road. <br />City Council Meeting Date: <br />Standards <br />The.City Council Will approve a.Conditiorial Use Permit onlyifthe followintfSctgate.established. <br />• There will be no detraction from the: appearance of adjacent properties •or Clly as a whole. <br />• There will not be aesthetic incompatibility <br />• There will. not be ituial incompatibility (noise) <br />• There will not be damage to vegetation <br />• Traffic patterns wiII not be ncgativelyaffected <br />• There is no unnecessary loss. of ex isti ng. natural features <br />• Will not cause soil erosion <br />• Will not increase flood potential <br />• 'Me proposal is consistent wwith Comprehertgive Plan and:complics with other Ordinances <br />It is the policy:of the City of Gem Lake that -all identifiable costs: associated with Conditional.Use Permits within the..Cityshall.be the sole responsibility of the owner of <br />said property.11te. cost shall include, but are not limited to the following: <br />• City planning review costs (reports, meetings, silereview) <br />• Engineering review costs <br />• Legal costs (preparation.ofhearing notices, legal research; certification costs) <br />■ Publication costs (notice of hearing) <br />■ Reapportionment of assessmenis (engineers report) <br />Mailings and Ownership. Reports (ownershiplencumbraric6) <br />['rior to the final hearing or determination by the City Council, all City expenses shall be paid by the owner. Subsequent expenses not paid at the time of final hearing or <br />de termill at i on by the City (duc to billings by consultants, etc.) shall be paid within 30.days. upon receipt.ofa billing from the City. The application will be considered <br />incomplete until.all.costs are.paid to the City: <br />Office Use Only <br />Date Request Received! <br />Date.Application Cbmplete: <br />Conditional Usc,Permit paid: El Cash © .Check <br />Check No.. <br />Approval based of the .01owing conditions <br />Date Permit Granted: <br />Date Pcrmit Denied: <br />Receipt.No. . <br />of Gem Lake Conditional Use Permit- Page.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.