Laserfiche WebLink
Luther Cadillac. Project Staff Report April 19, 2M <br />Gem Lake City Council Page 9 <br />Section 17.4.2(B) notes that when reviewing variances, .that the city shall also consider`the following; <br />• Adjacent Uses <br />Development nearby is characterized by auto=centric parking lots. The use, while primarily in <br />Vadnais Heights, will have some parking within Gem Lake. The normally required setback. <br />from the property line would impact the ability to use the parcel for the proposed use <br />(parking), and would create a layout that could stand -out from adjacent developments. <br />Air and Water Quality <br />The proposed..development should not impact air or water quality. The .site would have to <br />.adhere to applicable requirements -for drainage from the city and watershed district. <br />• Traffic Generation <br />The proposed use would generate traffic, though most traffic would not be located within the <br />Gem Lake portion of the: site. The site would have access to Highway 61 through a. new <br />frontage road that would run south through Vadnais Heights. if the adjacent lots to this site in <br />Gem Lake are redeveloped, the frontage road could be extended north. <br />• Public Safety and Health <br />The proposed project should not have impacts on the safety or health of the public, provided. <br />the development is built to code and adheres to any conditions placed on this .variance. <br />• Area Aesthetics <br />The. site is unique in that a majority of the site is not within the city limits; there are no <br />buildings or structures within the. Gem Lake side that would add or subtract from the <br />aesthetics of the area. Since the site is within the gateway zone, the commission could <br />request additional landscaping or screening if there is concerns with the aesthetics of the <br />parking lat: <br />Economic Impact on the Entire Area <br />bevelopment.of.a currently vacant.site would result in new tax base for the city.. Development <br />of the site could potentially spur additional development within the gateway area. <br />Consistency with the Comprehensive .Plan <br />The Comprehensive Plan identifies the gateway zone as perrnitting a wide variety of uses, <br />most of which are: more mixed -use in nature. Provided that zoning requirements and other <br />municipal ordinances are met, the proposed project would be consistent with the <br />Comprehensive Plan, as the proposed use of the. site by the applicant would not prevent <br />adjacent sites from being developed in accordance with the Comprehensive Plan and the <br />Consolidated Land lase Ordinance. <br />Minor Subdivision <br />Plat <br />The applicant has submitted a final plat for review and approval by the city,.and is meeting <br />requirements for approval. if approved, the plat can be recorded with the Register of Deeds. <br />Parkland Dedication <br />The city's Consolidated Land. Use Ordinance requires a land dedication for parks, or cash in <br />lieu, as part of subdivision requests. Given the .use:of the.site; a cash payment in lieu of land <br />is recommended. <br />■® <br />