My WebLink
|
Help
|
About
|
Sign Out
Home
2022 05-17 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2022
>
2022 05-17 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 8:06:06 AM
Creation date
1/8/2026 7:57:55 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
Show annotations
View images
View plain text
Acknowledging White Bear Lake's Feedback. <br />• Concern over the number of weekday BRT bus trips per day (8.9) <br />Concern over the size of BRT buses (60 ft articulated vehicles) <br />o Concerns over the disruption of station and dedicated lane <br />infrastructure on existing roadways and adjacent businesses <br />-- Conversion of two --way street segments to one: way, removal of on -street <br />parking, modification of business accesses <br />_J <br />Potential BRT Route Modifications <br />• Truncate the BRT Tine somewhere along County Road E between <br />Highway 61 and Interstate 35E, and add a "Purple Line <br />Connector" between Maplewood Mall and downtown White Bear <br />Lake. <br />DOO <br />• Truncate the BRT .line at Maplewood Mall Transit Center, and add <br />a "Purple Line Connector" between Maplewood Mall and <br />downtown White Bear Lake <br />
The URL can be used to link to this page
Your browser does not support the video tag.