My WebLink
|
Help
|
About
|
Sign Out
Home
2022 05-17 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2022
>
2022 05-17 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 8:06:06 AM
Creation date
1/8/2026 7:57:55 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
Show annotations
View images
View plain text
WATER GREMLIN PUBLIC HEALTH ASSESSMENT: PUBLIC COMMENT DRAFT <br />In March. 2021, Water Gremlin submitted a proposed workplan that includes dredgiing the eastern <br />stormwater.pond to rem ove.lead-impacted sediment and red uce..additiopal lead that.could ultimately <br />affect. Lambert Creek.(Stantec, 2021). This work has not been completed as. of April 2022. <br />Water.Gremlin operations have contributed to lead concentrations.! n sediments; particularly in samples <br />nearest the facility to the east and southeast. There is expected to be little to no trespassing that would <br />result in human exposure to the lead in these sediments. <br />F. Surface Water <br />As mentioned above, the Water. Gremlin. property contaIns.a portion of Lambert .Creek, three <br />stormwater retention ponds, and wetlands. The east and.west retention ponds flow.into Lambert Creek.. <br />SaMpies from these surface waters were tested for VOCs, lead, and 1,4=dioxane, Figure.10 shows the <br />locations of the lead samples. <br />In June 201% six surface water samples were collected from Lambert Creek and analyzed for VOCs and <br />lead (Wenck, 2D19). No VOCs were .detected, but lead was found in three samples (up to.12.5 ppb); two <br />of the samples exceeded..MPCA's Tier I. Surface Water Screening Criteria (SW Criteria) of 6.7 ppb. <br />Accordingto the MPCA Surface. Water Pathway Evaluation User's Guide (MPCA, 2006) Tier 1 surface <br />water risk. evaluation "...requires. the least level.of effort and the most conservative standards, <br />guidelines and criteria. It is used to screen.out sites that are not of concern." If the:Tier,1 investigation <br />identifies contaminants at levels above those standards, guidelines or criteria, additional investigation <br />may be required depending on the magnitude and extent of the contamination. <br />MPCA staff conducted surface water sampiing.for lead testing in water bodies located in the.communify <br />and well outside Water Gremlin property bouridaries in September 2019. Lead was detected, but below <br />Tier I.Stand.ards in Birch Lake; Columbia Park Pond, Goose Lake, Lambert Creek, and Rice Lake. Lead was <br />not detected in White Bear Lake. <br />In Octo4er2019, 14 additional surface water samples were collected and analyzed for lead .on the Water <br />Gremlin property (Wenck, 2020). Eight samples were. fro m the.north bank of Lambert Creek;.six were <br />from .tributaries to and wetlands that drain into Lambert Creek or discharge`from stormwater ponds. <br />lead was detected. 1n every sample. Ten samples were below SW Criteria, ranging from 0.12 -1 ppb, and <br />four exceeded the. criteria. Three of the samples that exceeded SW criteria -were collected from the <br />stormwater discharge from the Water Gremlin facility, and lead ranged in concentration from 26.4 - 88.1 <br />ppb. The fourth sample that. .was.above the SW 'Criteria, at 640 ppb, is. the easternmost (upstream) <br />sample on the property and.was collected from a southern inlet to Lambert Creek, However, this. <br />sample may not have been filtered to remove suspended. sediment, which is standard practice for <br />surface water samples. Suspended sediments in wetland samples ca.n increase measured <br />concentrations of metals, which.may account. for the very high.level of lead observed in this sample. <br />The other,sample collected from this tributary, at a location downstream less: than 250 feet away, had <br />only 0.68 ppb lead, which.casts. further doubt on the results for the potentially unfiltered sample <br />collected from this location. <br />M..PCA req u ested. testing for lead from the Water Gremlin facility roof stormwater runoff, to see if the <br />runoff was a.sou rce'of lead contamination in the east .stormwater pond. Two downspout samples were. <br />ca..]lected-du ring..a rain event in October 20i9.. The two results were 1.6 and 2.7 ppb lead.:Whiie these <br />results show that small amounts of Iead.are coming off the:facility roof, they are expected amounts and <br />illustrate the purpose.of a.stormwater collection system. <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.