Laserfiche WebLink
Section 4 <br />Plumbing Permits <br />Hot Water Boiler Permit: <br />$100.00 <br />Open Cut of Road to Tag Main: <br />$60.00. <br />Plumbing Permit: <br />$25.00J1.st. fixture <br />$10.00 each additional fixture <br />$100.00 City Water Permit <br />Septic. -System: <br />$250.00 <br />Sewer Changeover Permit From Septic: <br />$250.00Jsystem converted <br />.Sewer Connection Permit - New Construction: <br />$200.00 plus SAC unit <br />Sewer Line Repair Permit:. <br />$60.00 <br />Sewer Re -Inspection Fee: <br />$80.00/hour (1 hour minimum) <br />Sewer Taw• <br />$60,00 <br />