My WebLink
|
Help
|
About
|
Sign Out
Home
2022 06-21 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2022
>
2022 06-21 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 8:08:07 AM
Creation date
1/8/2026 8:06:06 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
Show annotations
View images
View plain text
Mayor and Council, <br />See street evaluation from Dale Reed at WBT. Please see my comments below in RED <br />Justin M. Gese, PE <br />From: Dale Reed <br />To: Justin Gese <br />Cc: Tom Kelly; Pat Christopherson <br />Subject: Street Evaluation <br />Justin, <br />I rated the City of Gem Lake's street system yesterday using the Town's rating system. Below are my <br />recommendations based upon the condition ratings. (Rating is 3.2 using a scale or 1-5, with 1 being the worst <br />condition) <br />1. Haven Lane— I recommend cracksealing and sealcoat in 2023. Some of the transverse cracks are alligator, <br />so will require some milling and patching in those prior to Sealcoating. - AGREED <br />2. Tessier Road (2.03) — I recommend that the street be considered for full depth reclamation or reconstruction <br />with concrete curbing. The cul-de-sac is a 3.5. I recommend cracksealing and sealcoating the cul-de-sac in <br />2023. - In the past the Council has been reluctant to install concrete curl) , „,, al streets in order to keep <br />the small town rustic feel, thus have not been used. This road may need more discussion or just stick with <br />the crackseal & seal coat on all of in 2023. <br />3. Little Fox Road (3.36) — I recommend that the street be considered for crackseal and sealcoating in 2023. <br />There are a few alligator transverse cracks close to Labore Road that will need to be milled a patched. 1 also <br />noticed snow plow/wing damage on the surface. - AGRE'ED <br />4. Big Fox Road (3.78) — I recommend that the street be considered for crackseal and sealcoating in 2023. <br />Snow plow/wing damage to the surface. There was in interesting find in the cul-de-sac, a Pickle Ball Court. <br />Will you need to replace the court after sealcoating? Or do the players even want the cul-de-sac sealcoated? <br />- AGREED - not sure what to say about the pickle ball court, could Melissa reach out to them and ask'' <br />5. Summit Farm Lane (4.75) —1 recommend that the street be considered for crackseal and sealcoating in <br />2023 even though the road was constructed in 2020. If not in 2023 then use the 5 year plan of 2024. The <br />sooner you can get a treatment on the surface the longer the projected life is until a mill and overlay is <br />required. AGREED in 2023 <br />6. Hoffman Road West (4.95) — I recommend that the street be considered for crackseal and sealcoating in <br />2023. Road was constructed in 2018. Aligns with a 5 year sealcoat plan. — This was paved in 2020, so I <br />would hold off in this one <br />7. Scheuneman Road South (4.7) —1 recommend that the street be considered for crackseal and sealcoating in <br />2023. Aligns with a 5 year sealcoat plan. - AGREED <br />8. Scheumeman Road North (4.1) — I recommend that the street be considered for crackseal and sealcoating in <br />2023. It has been 8 years since the last sealcoat. Transverse cracks were overlayed/filled with asphalt fines, <br />not actually sealed in 2015. - AGREED <br />Call me with any questions. <br />Dale <br />
The URL can be used to link to this page
Your browser does not support the video tag.