My WebLink
|
Help
|
About
|
Sign Out
Home
2018 09-04 PC PACKET
GemLake
>
PLANNING
>
PACKETS
>
2010 - 2019
>
2018
>
2018 09-04 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 8:22:25 AM
Creation date
1/8/2026 8:17:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
Show annotations
View images
View plain text
2.. Planning Commission: (lit Tuesday of the rilonth at 7 40 p.m. at Heritage Hall. Zoning Administrator <br />schedules.public .hearing .date. and provides.inforrnation to the White Bear Press .for (trite and place of <br />hearing).. <br />(Date. of. Planning Cornrnission meeting) <br />3. City Council: (3'd Tuesday of the month at 7:00 p:rn., Heritage H6111:4200 Otter make Road; <br />(Date of the: City Council meeting). <br />Standards. <br />The City Council will approve a Conditional Use Permit only if the following: facts are. established: <br />1. There will be no detraction fromthe appearance of adjacent properties, or Town as a whole. <br />I There will not be aesthetic .incornpatibility. <br />3, There will not be aural incompatibility (noise)'. <br />4: There will not.be damage to vegetation. <br />5. Traffic.pattems will.not.be negatively affected. <br />6. There is no unnecessary loss of existing natural features. <br />7. Will xhot cause soil erosion. <br />s. Will riot increase flood potential. <br />rit.with Corripreliensive flan and complies with.other Ordinances. <br />9. The proposal is consiste <br />lt.is the policy of the City. of Gem Lake that all.identifiable costs associated with Conditional Use Permits <br />within: the City shall be the sole responsibility of the owner of said property. The costs shall include, but are <br />not limited to the following'. <br />• City planning review costs. (reports; meetings, site revietiv}; <br />ip Erigineering review costs; <br />•. Legal costs (preparation of hearing notices, legal research, certification costs); <br />Publication costs (notice. of hearing); <br />■ Reapportionment of assessments (engineers report); <br />■ Mailings and ownership.Reports.(ownershiplencurnbrance); <br />Pxibnto..the. final hearing or de termination by the: City C0unCil, all City expenses shall be paid by. -the owner.Subsequent expenses not paid at the time of final hearing or determination by the.City (due to billings by. <br />consultants, etc.} aII be paid. within 30 clays -upon receipt of a. billing from the City. The application will be <br />considered incQ tplete. t i �1>costs: are -paid q the City. <br />Signatur .o . Applicant.( <br />`711 <br />Date <br />be completed by the Cit*(oher <br />Date request received:. <br />Conditional Use Permit t an a PUD $75,00 p1us.$204. escrow for review) paid: ; . <br />_Olt eunditinnal use permit <br />Date Application Complete: <br />
The URL can be used to link to this page
Your browser does not support the video tag.