My WebLink
|
Help
|
About
|
Sign Out
Home
2018 09-04 PC PACKET
GemLake
>
PLANNING
>
PACKETS
>
2010 - 2019
>
2018
>
2018 09-04 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 8:22:25 AM
Creation date
1/8/2026 8:17:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
Show annotations
View images
View plain text
2, Planning Commission: (151 Tuesday of the month at TOO p.m. at Heritage Hall. Zoning Adinihistrator <br />schedules public Bearing date and providesInformation to the White Bear Press. for. time and .place of <br />liearirig}. <br />(Date of.Planning Commission meeting) <br />3. City Council:.(3*d Tuesday of the month. at 7.0.0 p.rri., Heritage Hall,.4200 Otter Lake Road. <br />(Date of the City Council meeting) <br />Standards• <br />The City Council will. approve a. Conditional Use Permit only if the following facts. are established: <br />I., There will be no -detraction from the appearance of. adjacent properties; or Town :as a whole, <br />2. There will not be aesthetic incompatibility. <br />3. There will riot be aural incompatibility (noise): <br />4. There will not be..darnage to vegetation. <br />5. Traffic patterns will notce negatively affected. <br />6. There is: no unnecessary loss of existing natural features.. <br />7. Will not cause soil erosion. <br />8. Will not increase flood potential. <br />9.. The. proposal is consistent with Comprehensive Plan and complies with other Ordinances. <br />It. is the policy of the .City of Gem Lake thatall identifiable costs associated with Conditional Use Permits <br />within the City shall be the sale responsibility of the owner of said .property. The costs shall include, but are <br />not limited to the following: <br />• City. planning review costs (reports; meetings, site reVIew}; <br />Engineering review costs; <br />• Legal costs. (.preparation of :hearing notices, legal: research, certification costs); <br />• Publication costs (notice of hearing); <br />Reapportionment of assessments. (engineers report); <br />Mailings and Ownership Deports (ownership/encumbrance), <br />Prior to the final hearing or determination: by the City Council,,all City. expenses shall be paid by the owner. <br />Subsequent expenses not paid. at: thetime of final hearing or determination by the City (due to billings by <br />consultants, etc.) shall be paid within:30 days upon receipt of a billing from the City. The application will be <br />considered incomp uunftnl all cg s are paid to the City, <br />Signature of Applicarit .(s) <br />Date <br />To be eaxripletecl by the. City:. ► 3sGjr.� <br />Date .request received <br />: <br />Conditional Use Permit (othe than: PUD $75.00 plus V06 escrow for review) paid: <br />Date Application Complete: Y2017cond1Honaluse permit <br />
The URL can be used to link to this page
Your browser does not support the video tag.