Laserfiche WebLink
Gradine and Filling Permits: <br />The. fees for each.review shall be based on Table 2-A. Permit fees shall be based on Table 2-B.. <br />TabW2-A - Grading Plan Review Fees <br />50.cubic yards.(3.8.2.m3) or less <br />$50.00 <br />51-to 100 cubic. yards (38.9 m3to.76.5 m') <br />$75.0.0 <br />101 to 1,000 cubic yards 77.2:m3 to 764.6 nil) <br />$1.00M <br />1,001 to 10,000 cubic yards 765:3 m' to 7645.5 rn' <br />$200.00 <br />$200.0.0 for the ftrst..10,000 cubic.yards (7,645.3 m'), <br />l0,OQ1 to..100,000 cubic yards (7,646.3 W. -to 76,455.5 m3). <br />plus $100.00 *foir each additional 10,000 yards <br />76,455.5 m3) or fraction thereof. <br />$500.00 for the first 100;000 cubic yards <br />100,001 to 200,000. cubic yards-(76,456.3 nP to:152,91 I m') <br />(76,455.5 m3}, <br />plus $100.00 for -each additional 10,06.0 cubic yards <br />7,645..5 m3 or fraction thereof. <br />$750.00 for the first 200,000 cubic yards <br />200,061 cubic yards (152,9,I1- . rri'),or more <br />(152,91 l 0), <br />plus $1.00.00.for each additional 10,000 cubist yards <br />7;645.5 m .or fraction thereof <br />Other Fees:. Additional plan review required by changes., <br />additions or revisions to approved plans <br />minimum char a -`one-half hour <br />$100:00/hour <br />Table 2-B - Grading Permit Fees"- <br />50 cubicyards (38:2 nt') or less <br />$75.00 <br />51 to 100 cubicyards . 38.9.tn'to 76.5 m') <br />V00,00 <br />$200.00 for the -first 106 cubic yards <br />10.1 to 1.,000.cubic yards (77.2-m� to 764.6 rr?). <br />(7.6.5 m'), <br />plus.$17.50 for each additional 100 cubic yards. <br />76.5 m' or fraction thereof. <br />$200..00 fgr the first 4,000 cubic.yards <br />1;001 to 10,000 cubic yards (765.3 rn'to 7645.5 tn') <br />(76.4.6 m3),. <br />pltiss'$=00 for =6 additional 1,0.00 cubic yards <br />764.6 m3. or fraction thereof. <br />$500.00 for the first 10,000 cubic yards <br />10;001 to 100,000 pubic yards (7,646.3 m31616;455.5 W.) <br />(7i545. to , <br />plus..$100.00 for each additional 10,000 cubic yards <br />7645.5 m3 .or fraction thereof. <br />$1,250.00 for the first 100,000.cubic;yards <br />1.00,p01 to:200;000 cubic yards (76,456.3 ril3 tt5.152,911 m') <br />(76,455.5 m3), <br />plus $100,00 for each. additional 10,000 cubic yards <br />'1045.5 e) or fraction thereof <br />Other Inspections and Fees: <br />1, Inspectiotis-outside of normal business hours <br />$200.00/hour <br />(minimum charge - two (2) hours) <br />2. Re -inspection fees assessed <br />$200.00/hour <br />3. Inspections for which no fee is specifically indicated <br />$200.00/hour. <br />(minimum charge - two 2 hours <br />The fee for a grading permit aritho#zing additiMW work to that under a valid petmit:shaU be the difference behypen the' fee paid for the. original <br />permit and the fee shown for the.eutfre project.. <br />.All grading and filling permits that will 'dis4ub greafer'tltaq one (lpaae ofland will also be charged. for A. Soil Erosion.permit.. <br />Updated 0.1/01/2022 t�, i <br />