Laserfiche WebLink
Section 2 <br />Electrical Permits <br />Homeowners and Electrical Contractors: <br />Complete. an electrical permit: form available from Building Inspections..Division. Add $1.60 for State surcharge to the <br />total cost ofe ioh permit: The fee is the total of thb listed -fees or the total number of inspection trips x $45.00, whichever <br />is greater. <br />Residential panel replacement is $110.00, sub panel - $45.00 <br />New service or power supply is: <br />Circuits and Feeders: <br />036.300 Amp <br />$55.00 0 to 100 Amp $9.00 <br />400 Amp <br />$71.0.0 101 to �00.Amp <br />500 Amp. <br />$87.60 201 to.300 Amp :$21.00 <br />600 Amp <br />$103:00 301 to 400 Amp $27.00 <br />800 Amp <br />$135.00 401 to 500rAnip $33:00 <br />1000 Amp <br />$16.7.00 501 to 600 Amp $39:00 <br />Add $16.00 for each. additional. 100 Amps <br />Add $6.OQ.for each additional 100 Amps <br />Minimum Fee: <br />Maximum Fee: <br />Minimum permit fee. is 345.00 -plus $1.00 <br />Maximum fee for a -single fatnily dwelling.or t&Mh6usb <br />State surcharge. This is for ane inspection% <br />not over 200 amps (No max if service is over 200 amps) <br />only. Minimum fee for -rough -in and final <br />is:$190.00 plus $1.00 State surcharge. Maximum of 2 <br />inspection is $9.0.00 plus.$1.00 State <br />mugh4ls and I final inspection. (Failed inspections are <br />surcharge: <br />arr addidonal*$45 00 each) <br />.Apartment Buildings <br />Fee.per uiiit of an apattment of condominium complex is $$0.00..This does not cover sefwce, unit feeders:or.hpuse <br />panels. <br />Swimming Pools and Hot Tubs: <br />Additibas, Remodels or Basement Finishes: <br />Residential Accessory Structure: <br />Traffic Signals: <br />Street and Parking Lot Lights: <br />Transformers and. Generators: <br />Up to 1.0 kva <br />$5.00 <br />75 kva to 299 kva <br />$60.00 <br />Retrofit'. Lighting:. <br />Sign Transformer or Driver: <br />Low voltage fire: alarm, low voltage.. heating and. <br />air couditioning control wiring: <br />Re -Inspection Fee in addition to <br />all other Peek <br />Hourly rate. for carnivals: <br />Solar Fees- <br />0 kw to 5 kw <br />$90.00 <br />I o.:1 kw to 2Q kw <br />$225:00 <br />.30.1 kw to 40..kw <br />$37' 5.00 <br />$00.09 plus circuits at $9.06. each -Includes 2 inspections <br />$00.00 includes up to 10-circuits and 2 inspections <br />The greater of $55.00 for panel plus $9.00 percircuitor $90.00 <br />for.2 inspections <br />$8.00 per eacb:standard <br />$5,00 per each standard. <br />11 kva to 74 kva $.40.00 <br />Over 299 kva. $16&00 <br />$0.85 per device <br />'$9.0.0: per ftAmfdrrner <br />*$0.$5 per device. <br />$45.00 <br />$90:00 <br />S:l kw to 10-k-w $15Q.00 <br />20.1. kw to 30 kw $300:00 <br />40.1 kw and largor $375:00 plus $25.00 each additional 10 kw <br />Electronic inspection he for these items only: <br />Furnace, air gonditioning„ bath fan, fireplace or receptacle for water heater ventis.$40.00 <br />Refunds must -be requested in writing. No refunds unless.more than the minimum fee.. Refunds: are minus tbe:cities <br />20%handling fee. <br />THE PERMIT FEE 19 DOUBLED IF THE WORK STARTS BEFORE.THE.PERMIT IS ISSUED. <br />vpda«a.0.Ero10022 s <br />