Laserfiche WebLink
Section 4 <br />Plumbing Permits <br />Open Cut of Road to Tap Malin: <br />$60.00 <br />Plumbing Permit: <br />$25.00/1 st fixture <br />� I0.6b each additional fixture <br />SiOU6 City Water Permit <br />Septic System:. <br />$250.00 <br />Sewer Changeover Permit From Septic: <br />$250.00/system converted <br />Sewer Connection Permit - New Construction: <br />$200.00 plus SAC unit <br />Sewer Line.Repair Permit: <br />.$60.00 <br />Sewer Re-Inspec&n.Fee: <br />$80.00/hour (I hour minimum) <br />Sewer Taps <br />-$60.00 <br />Water Heater• <br />$SQ.00 <br />Water.Softener: <br />$50:00 <br />Updated 01/01 f2022 $. <br />