Laserfiche WebLink
Section 4 <br />Plumbing -Permits <br />Hot Water Boiler Permit: <br />$100.00 <br />Open Cut of Road to Ta Main: <br />$50.00 <br />Plumbing Permit: <br />$25.00/18t fixture <br />$10.00. each additional fixture <br />$100.00 City Water Permit <br />Septic System: <br />$100,00 <br />Sewer Changeover Permit From Se�vtic <br />.$250 00/system converted <br />Sewer Connection Permit - New Construction:. <br />$200.00 plus SAC unit <br />Sewer Line Repair Permit: <br />$22.00 <br />Sewer Re -Inspection Fee: <br />$80.00jhocir (1 hour minimum) <br />Sewer Ta. <br />$60,00 <br />E* <br />