Laserfiche WebLink
Preliminary Cost I=stimate <br />Geni Laker Minnesota <br />Scheunemen Road Reconstruction and Utility Extension <br />SEH No. GEMLK 143869 <br />NO. <br />Scheuneman Road. Reconstruction <br />1 MOBILIZATION <br />2. REMOVE CONCRETE CURB & GUTTER <br />3 REMOVE CONCRETE SIDEWALK <br />4 REMOVE BITUMINOUS PAVEMENT <br />5 PLACE. SALVAGED AGGREGATE BASE (CV) <br />6 AGGREGATE BASE (CV).CLASS 5 <br />7 BITUMINOUS PAVEMENT <br />8: CONCRETE CURB &.GUTTER; B518 <br />9:..GONCRETE APRONS. <br />10 BITUMIN.OUS PATCHING <br />11 COMMON EXCAVATION (P) <br />12: S.AWCUT PAVEMENT <br />13 PAVEMENT MARKING <br />14 SIGNING <br />15 STORM SEWER. IMPROVEMENTS <br />18 RESTORATIONIEROSiON <br />17 TRAFFIG CONTROL. <br />UNIT <br />LS <br />LF <br />SF <br />TON <br />LF <br />SF <br />TON <br />CY <br />LF <br />LS <br />LS <br />LS <br />LS <br />I. <br />300 <br />500 <br />7WO <br />1260 <br />500 <br />2200.. <br />3000 <br />2000 <br />250 <br />3800 <br />2000 <br />TOTAL C <br />$3.00 <br />$1.,500X0 <br />$2.00. <br />$15j260.00 <br />$15;00 <br />$18;900.00 <br />$25.001 <br />$12.500.00 <br />$60.00 <br />W2,000.00 <br />$15,60 <br />$45,000:00 <br />$7.00 <br />$14,OOO:OO <br />;100,00 <br />$25,0.00.00 <br />W.1001 <br />$70,060.00 <br />11 $5,000.Oa $5 <br />1 $5,000.00. 5 <br />1 $75,000.00 $75 <br />1 $1.0.000.00 $10 <br />LEGAL, ADMIN., & ENO. (20016) <br />STREET RECONSTRUCTION COST <br />TOTAL PROJECT ESTIMATED COSTS <br />$94,960 <br />$611,240 <br />$850,070 <br />