Laserfiche WebLink
6ern l:akr ['�ip.['�xiiiicil A7cetilif; <br />PaW 2 of, 6 <br />SwomJey also suggested a story reviewing the .proposed Vadnais Heights <br />Campreherisive Flan. <br />OLD BUSINESS <br />Tower Ord.€hanbe: There has been a Public Hearing on this ordir3arre anei the <br />Planniiitt .Cotrsrrlission forwarded this fd the City Council Councilmember Artig- <br />5womlay stated. that riot al€ tgwers are high voltage and feels that a high voltage <br />sign is not required an cash lower,. Wants. the wordage on the. ordinance.to state <br />io say that "high voltage" sign is required only for high -voltage towers.. In addition, <br />the question was brought up as to why it newels to beconhected to the electric. <br />company. Co.uncilmember Bosak recommended striking this section .of the <br />ordinance. Councilmember Rasmussen asked about the smaller low voltage that <br />you could .buy at Menards's- Some residenf s Ma.y want to power Their homes <br />and not. Connect with :the :powl;r Company. Cily Attorney Trevor Oliver was <br />present at the Meeting and +,vent through the wordage of ffle ordinance .witlt ttie City Council. Mayor Uzpen recommended to the: City Council to let Attorney <br />Oliver Work on the. ordinance further. <br />conditional use Permit: for S.G.S. Holdings: the PlannIng Commission had a <br />Public Hearing regarding this perrriit, and recommended to move forward with this, axle forwarded to the City Council: Mayor Uzpen asked if the City Council <br />had arty questions or concerns regarii.ing this prmit. The owners i'siori <br />Gochilashvili and his wife :Sail . Ackerman p Y Presented the requirad paperwork <br />The question was raised regarding the buried. tanks. It had been re(;bmmended <br />to remove the oil from the soil. (NCF'A) carve out to view the. property and closed <br />the tile. as there .is sume, coMarnination; but .not enough for any b ncernx at -thislime. They would need to go down 50 feet to check soil orl existing tanks. The <br />holding tanks were put in 1!�98 and areunderground tanks. Trey are per c.>asle <br />and the well is In place and tested okay. The bank has not sent. the report to the <br />City Council Stating this information. The. City C.ounctl is requesting the NpCA <br />reporl.so the council ..can review it, At this point, the owners want::to.renova to: the <br />car wash building for the car showrpom with ar3 office arid.space. to repair cors..in <br />the back of thra building. They ere also r)i.anling spac;; ,i pianls tr,at l,uor,:lp.� <br />. if lpr, environment, If they decide. to add ar <br />tile underground tanks and test the . gas stetityn at a Tatr oala?, they will e <br />soil around. and Beneath the. tanks at that. <br />time. The State of Minnesota requires that gas Stations have len years in <br />remove the underground tanks.. Novua Engineering was at the property and <br />determined if a food store were built at a later date, (hen thee. would be a lot of <br />testing before a food license .would be issued. .At this .palnt, a Conditional Use <br />Perrnit.is for. the .sa.le of cars.. The standards are: <br />1. the Conditional Use Permit will autbmalically renew unless.. the City <br />Council deterTnlnes that S.G.S. is in violation of the conditions of this <br />permit, <br />i i=oA for us y11 ll;c World Widc 1�o µt t rulaktnu.,,t,r� <br />