My WebLink
|
Help
|
About
|
Sign Out
Home
2017 04-04 PC PACKET_2
GemLake
>
PLANNING
>
PACKETS
>
2010 - 2019
>
2017
>
2017 04-04 PC PACKET_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 10:03:26 AM
Creation date
1/8/2026 9:52:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
Show annotations
View images
View plain text
1. A list of the responsible party(s) (Cityandfacility owner/manager); <br />2..Contact information; <br />3. A formalized maintenance schedule, with scheduled activities; <br />4. A " aiiure to Per provision. laying out xemedsal..actions if the responsible party does not <br />perform as expected; <br />S. Maintenance debxis handling plans; and <br />G. Emergency response (eAvironmental, spill, safety). <br />1] Maintenance is. required for. an stormwater practices constructed in compliance with these Policies. The City <br />will conduct periodic inspection of stormwater:practices: A=ir .: i.A .»m of 20% of all.stormwater facilities shall <br />be inspected annually by rhe.. City. The City shall.provide tv<tik e. VLAWM0 annual inspection reports detailing <br />inspection activities: and proof of: maintenance w ere;requited <br />When land. used by storrnwater roam <br />thus .section will not be required, and a <br />Iieu of the recorded maintenance agreea <br />tes. is.public land?or public right-of-way, easements undei <br />nent between the ,City and applicant maybe executedin <br />Updaled March 14, 2017 <br />Gem Lake Consolidated Laird Use Ordinance — Page 134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.