Laserfiche WebLink
Section 4 <br />Plumbin Permits <br />Hof Water Boiler Permit: <br />$100.00 <br />O en Cut of Road to Tag Ma rr <br />$60.00 <br />Plumbing Permit: <br />$25:00/V' fixture <br />$10.00 each additional fixture <br />$100.00 City Water Permit <br />Septic System: <br />$100,00 <br />Sewer Changeover. Permit From Setic: <br />$250.00jsystem converted <br />Sewer Connection Permit New ConsWIcti.orr <br />$200.00 plus SAC unit <br />Sewer Line Re air.Permit: <br />$22.00 <br />Sewer Re -Inspection Fee:. <br />$80.00Jhour (I how- minimttrn.) <br />Sewer T <br />$60 00 <br />9 <br />