Laserfiche WebLink
assess the cost of connection against the property owner. The. <br />notice shall be mailed by xegistered.mailto the property address.` <br />(2) The cost of the improvement shall include all costs incurred by <br />the City in order to connect the property to the main sewer line <br />and shall include City permit. and connection charges which must <br />be submitted to the Metropolitan Council Environmental <br />Services. <br />(B) New Structures. All buildings hereafter constructed within. the City on <br />property adjacent to a sewer main or in a platted block through which <br />the Municipal Sanitary Sewer System extends, shall be "provided with a <br />connection to the sewer system. for disposal of all human waste before <br />occupancy of the building shall be allowed or a certificate of <br />occupancy issued. <br />(C) Sewer Not Available. Where sewer is not available to a building, the <br />building shall be connected to and deliver waste to: an individual <br />sewage treatment system. <br />Munici ai Sanita Sewer S stem Charge . A portion of the cost of constructing.and <br />maintaining the municipal sanitary sewer system shall be recovered by the <br />impositia11 of special assessments pursuant to Minnesota Statute 429, a <br />connection charge, and a sewer availability charge (SAC). on. behalf of the <br />Metropolitan Council. <br />(A) Connection Char e. A connection charge, as determined from time to <br />time by City Council ordinance; shall be callected when housing units <br />are.connected to the Municipal. Sanitary Sewer System. In addition; <br />before a connection permit will. be issued, the City shall deternvne that <br />one of the following conditions. exist: <br />(l) The lot or tract of land to be served by such connection has been <br />assessed for the cost of construction of the sanitary sewer main <br />with which the. connection is made; or <br />(2) If no special assessment has been. levied for such construction <br />cost, the proceedings.for levying the special assessments have <br />been or will be commenced and completed in due course; or <br />(3) If no special assessment has been levied, and no .special <br />assessment proceedings will. be completed in due course,. a sum <br />equal to the.portion of the cost of construction of the sanitary <br />