Laserfiche WebLink
(4). The Iicensed installer shall be responsible for.nctifying the department a minimum of <br />twenty four (24) hours before the time the work is ready for inspection or reinspection. <br />(5) When, upon inspection, any part of the system is determined not to be in compliance <br />with this division,. written notice shall be provided by the Department indicating the deficiency <br />and. the required corrections. <br />(6) Noted deficiencies shall he properly corrected and reinspected before any other work <br />on the project is continued. <br />(7) SSTS found not to be in. compliance with Minnesota Rules, Chapter 7080,1500, Subd. <br />4A or Chapter. 7081,00.8 0, Subd. 3. must be repaired or.replaced within ten (10) months. <br />(8) No system shall be placed or. replaced in service until final.. inspection and :approval of <br />the installation. <br />(9) The contractor, upon completion of the installation, shall file with the department as -- <br />built drawings indicating the location :of system components dimensioned from a permanent <br />reference point: <br />(10) A minimum of three construction inspections are required for mounds in accordance <br />with the following:. <br />a. When the original soil under the mound has been roughened, but prior to placement of <br />the sand fill. Enough of the proposed sand fill must be present to be viewed. <br />b.. After placement of rock and piping.but prior. to cover. <br />c. Final inspection, when the job is completed. <br />(11) SSTS that are determined to have operation or monitoring deficiencies must <br />immediately be maintained, monitored or otherwise managed according. to the operating permit. <br />