My WebLink
|
Help
|
About
|
Sign Out
Home
2016 09-20 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2010 - 2019
>
2016
>
2016 09-20 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 2:38:39 PM
Creation date
1/20/2026 12:36:51 PM
Metadata
Fields
Template:
Administration
Code
ADM 0500
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
Show annotations
View images
View plain text
Administrative capability <br />o have an administrator who has taken th.e required training (at a minimum the web -based training of 13 <br />Videos that. is provided on MPCA's webs ite at the.fol€owing location): <br />httwww: ca-statia,mn.as index. h water .water-t es -and- ro rains subsurface -sewn e-treatment- <br />system-ssts ssts-administrative-trainin .html <br />keep required records <br />* provide the MPCA with the required .annuaI report by February V of each year <br />provide the MPCA with a complete list of:SSTS tanks installed each year by installers and homeowner <br />installed systems by February:1" of each year <br />e include technical requirements for systems less than 5,000 gallons per day (chapter 7080) and for systems <br />greater than 5,000 gallons per day (chapter 7081) <br />Local units of government can contract for design review and construction <br />inspection services <br />Care must be taken to avoid conflicts of interest <br />State rules prohibit a contracted des€gner or inspector from designing a system and thenapproving.the design: <br />Rules.also prohibit a contracted inspector from installing a system and then approving the installation (assuming <br />the inspector holds a€1.appropriate litenses). <br />The state rule allows the fallowing: <br />Sequential step Activity Documentation Who does the work <br />g p SSTS licensed designer <br />Step .l Design system' Design re ort <br />Step.2V Review and approve design Constructlon permit Contract 55T5 inspector <br />Step 3 Install system* As=bulitdrawing: <br />SSTS licensed. installer <br />Step 4 inspect. system Certificate of CcmpIII ance or.Notice of Contract 55T5 Inspector <br />Noncompliance. <br />Step 5 Administer program Ensure notices of non-compliance are Township representative <br />upgraded; review data submitted for {town clerk) <br />operating permits, oversee program <br />*A business that designs a system can.he the some business that installs the system. <br />To prevent conflicts of interest <br />a the same person/business cannot approvea system they design <br />the same person/business cannot conduct a construction inspectlon for compliance on, a. system they <br />installed <br />Page 2:of 2. ❑c ber 2614 1 wq-wuriist2-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.