My WebLink
|
Help
|
About
|
Sign Out
Home
2016 10-18 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2010 - 2019
>
2016
>
2016 10-18 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 2:36:53 PM
Creation date
1/20/2026 1:01:18 PM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
Show annotations
View images
View plain text
(3) .An .owner of a SST -S must retain a licensed installation business to abandon all <br />components of the treatment .system within sixty (60) calendar days of discontinued. use. <br />Abandonment.shall.bc completed in accordance with Minnesota Rules, Chapter 7080.2500. No <br />prior notification to the Department. of an owner's intent to abandon a system is necessary. <br />(4) A report ofabandonment certified by the licensed installation business shall be <br />submitted to the. Department: .The report.shall include:. <br />a. Owner's name, mailing address, telephone nurnber, and e-mail address, <br />b. Property address <br />c: System construction permit and operating permit. <br />d. The reason(s). for abandonment <br />e. A brief description of the abandonment .methods used, description of the System <br />components remo.Ved:or abandoncd.in.place,. and .disposition of any mated als:or residuals. <br />(c) Abandonment Certificate <br />Upon.reeeipt of an abandonment .report and its determination that. the SSTS has been: <br />6bandoned according to the requirements of this Ordinance, the Department shall issue.: an <br />abandonment wrtificate. If the abandonmentis not completed according the requireincnts of this <br />Ordinance the City shall :notify the owner of the SSTS of the defieicncies,. which shallbe <br />corrected Within thirty (3:0) calendar days Of the notice: <br />Sec. 25 MANAGEMENT PLANS <br />(a) PURPOSE <br />The purpose. of management plans is tp describe how. a particular SSTS is intended to. be <br />operated and maintained to sustain the performance required. The plan is to be provided by the <br />certified designer to the.systern owner when the:ireatment system is commissioned. <br />Formatted: Font: (Retault) Times New korw upt <br />�5......_...._.. •-------------•--•-••-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.