Laserfiche WebLink
1 <br /> <br />Section 1 - Building Permits and Inspections <br /> Building Permit Fees: Building permit fees are either flat fee or based on current state valuation costs, <br />plus Minnesota state surcharge. Permit fees not listed in the flat fee chart are based on valuation. See <br />fee charts below. <br />Building Permit Fees Based on Valuation - Minnesota Statute 326B.153 Building Permit <br />Fees <br />$1.00 to $500 $29.50 <br />$501 to $2000 $28.00 for the first $500.00 plus $3.70 for each additional $100.00 or <br />fraction thereof, to and including $2,000.00 <br />$2,001 to $25,000 $83.50 for the first $2,000.00 plus $16.55 for each additional $1,000.00 <br />or fraction thereof, to and including $25,000.00 <br />$25,001 to $50,000 $464.15 for the first $25,000.00 plus $12.00 for each additional $1,000.00 or <br />fraction thereof, to and including $50,000.00 <br />$50,001 to $100,000 $764.15 for the first $50,000.00 plus $8.45 for each additional $1,000.00 or <br />fraction thereof, to and including $100,000.00 <br />$100,001 to $500,000 $1,186.65 for the first $100,000.00 plus $6.75 for each additional $1,000.00 <br />or fraction thereof, to and including $500,000.00 <br />$500,001 to $1,000,000 <br /> <br />$3,886.65 for the first $500,000.00 plus $5.50 for each additional $1,000.00 <br />or fraction thereof, to and including $1,000,000.00 <br />$1,000,001 to $5,000000 $6,636.65 for the first $1,000,000.00 plus $4.50 for each additional <br />$1,000.00 or fraction thereof, to and including $5,000,000.00 <br />$5,000,001 and up $9,436.65 for the first $5,000,000.00 plus $3.70 for each additional <br />$1,000.00 or fraction thereof <br /> <br />Plan Review Fee 65% of the Building Permit Fee (Multiply 65% (0.65) × the Building Permit <br />Fee (listed above) <br />Building Permit Surcharge Based on Valuation - Minnesota Statute 326B.148 Surcharge <br />State Building Permit Surcharge Based on Valuation <br />$1.00 to $1,000,000 equivalent to one-half mill (.0005) of the value <br />$1,000,001 to $2,000,000 $500 plus two-fifths mill (.0004) of the value <br />$2,000,001 to $3,000,000 $900 plus three-tenths mill (.0003) of the value <br />$3,000,001 to $4,000,000 $1,200 plus one-fifth mill (.0002) of the value <br />$4,000,001 to $5,000,000 $1,400 plus one-tenth mill (.0001) of the value <br />$5,000,001 and up $1,500 plus one-twentieth mill (.00005) of the value <br /> <br />Total Fee = Building Permit Fee + Plan Review Fee + Building Permit State Surcharge *** <br /> <br />Other Inspections and Fees <br />Inspections outside of normal business hours $100.00 per hour (minimum charge 2 hrs.) * <br />Re-Inspection Fees $100.00 per hour (minimum charge 2 hrs.) * <br />Inspections for which no fee is specifically <br />indicated <br />$100.00 per hour (minimum charge 2 hrs.) * <br />Additional plan review required by changes, <br />additions or revisions to plans <br />$100.00 per hour (minimum charge 2 hrs.) * <br />For use of outside consultants for plan checking <br />and inspections, or both <br />Actual Costs **