My WebLink
|
Help
|
About
|
Sign Out
Home
2019 01-15 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2010 - 2019
>
2019
>
2019 01-15 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 8:44:57 AM
Creation date
2/26/2026 8:40:42 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
Show annotations
View images
View plain text
City of White Bear Lake <br />4701 Highway 61 • White Bear Lake,- MinnMta 55110 <br />Phone (65.1) 429.8526 • Fax (651) 429-8500 <br />www;whitieb earlake.org <br />ber'18, 2a18 <br />Gem lake <br />ATTN: Tom Kelly <br />1281 Hammond Road <br />White Bear Lake, MN <br />Dear Tom. <br />55110 <br />S�%Sa <br />TDW Q W ITF BF -AR <br />Enclosed are two copies of the 2019 Fire Service contract addendum. The addendum is <br />consistent with our long-standing agreement. Budget detail regarding the 2019 budget <br />to support the budget calculations is attached for your information. <br />The 2019 addendum represents a significant change from previous years' service level <br />and resulting service level costs. The City conducted a comprehensive fire and <br />ambulance operational review during 2018. This review resulted in a departmental <br />reorganization, which implementation occurring during the. last four to five months of <br />2018. The reorganization addressed changing resident service level expectations and <br />utilization. During the fire operational review, it became evident that the City's reliance <br />on a "paid on call" fire and ambulance service membership was not feasible. for <br />providing quality future service levels. it is no longer feasible to expect fire service <br />membership to be available to address the increasing service level demands on a <br />strictly "paici-won-calf" basis. <br />Due, to service level, reorganizational operating costs are. adjusted accordingly. Gem <br />Lake's tax capacity valuation along with operating costs including fire inspections results <br />in Gem Lake's share of. the 2019 fire .and. inspection contract amount being set at <br />$21,$80. <br />Please sign both eopies of the addendum: and return one of them to me. The second <br />copy is for your records. <br />Please call me at 429-8517 if you have any questions. <br />Sincerely, <br />Don Rambow <br />Finance Director <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.