Laserfiche WebLink
<br />FEASIBILITY STUDY GEMLK 186534 <br />Page 5 <br />4 Right of Way and Easements <br />The construction of the proposed improvements in this report are anticipated to fall within existing <br />right of way of the project roads. If the system is extended and looped in the future to the Villas <br />Development, the City would have to acquire easements to those connections. <br />5 Permits and Approvals <br />The following permits and approvals will need to be obtained for this project. <br /> Minnesota Department of Health (water main extension). <br /> Minnesota Pollution Control Agency (turf disturbance if greater than 1 acre) – NPDES. <br /> Coordination with the City of Vadnais Heights on connection to and use of water. <br /> Coordination with Ramsey County, Vadnais Heights on use of right-of-way for water main <br />placement. <br />6 Cost Recovery <br />6.1 Benefits and Assessments <br />The City intends to levy special assessments to the benefiting properties in accordance with <br />Minnesota Statute 429. This state law allows the City to assess adjacent properties for the costs <br />associated with the project improvements. <br />In addition to special assessments, the City will be utilizing a Grant to fund the remainder of the <br />project. <br />Following the 429 Statute, once the feasibility report is received by the City Council, a Public <br />Improvement Hearing will need to be ordered and held. Within six months of the Public <br />Improvement Hearing, a Council vote to adopt a resolution ordering the improvement will need to <br />be taken or another hearing will need to be held. “Ordering” the improvement means authorizing <br />the preparation of the plans and specifications and moving ahead towards bidding and <br />construction. <br />6.2 Special Benefit Analysis <br />An independent appraiser was hired to determine the benefit amount for the properties to have <br />access to City supplied water. The report is attached and determined that the maximum <br />accessible amount per parcel, per dwelling for single family is $14,250. For the planned industrial <br />property along Labore Road, the benefit was determined to be 10% of the appraised property <br />value or $122,750. <br />