My WebLink
|
Help
|
About
|
Sign Out
Home
2026 03-17 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2026
>
2026 03-17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2026 11:07:24 AM
Creation date
3/18/2026 11:05:00 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKETS
Destruction
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
Show annotations
View images
View plain text
<br />FEASIBILITY STUDY GEMLK 186534 <br />Page 7 <br />8 Conclusions and Recommendations <br />8.1 Conclusion <br />From the results of our study, we conclude that: <br /> The proposed improvements are necessary to provide the City with potable water and <br />flows capable of fire protection for the neighborhoods. <br /> Given the City’s desire to connect to Vadnais Heights’ water system and the location of <br />the properties requesting municipal water. The proposed improvements are feasible and <br />cost effective compared to other options. <br /> The City should consider a second connection to the Vadnais Heights System in the near <br />future to limit the time this portion of the City would be on a dead-end-main. <br /> The project cost of $122,750 would be assessable. <br />8.2 Recommendation <br /> The City Council accepts this report and schedules the improvement hearing to receive <br />public comment on the project should the Council decide to proceed with the <br />improvements. <br /> The improvements proceed as outlined in this report. <br /> A portion of the costs for these improvements will be recovered from benefiting properties <br />through special assessments, City contribution, and Grant funding. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.