Laserfiche WebLink
an assessable cost, to be determined by the City Engineer, upon the same basis as any <br />assessment previously levied against other properties for said sanitary sewer construction. <br />If no such assessment has been levied, the assessable cost will be determined upon the <br />basis of the uniform charge which may have been or which would be charged for similar <br />construction of such a sewer main, determined on the basis of total assessable cost of <br />such main allocated using one of the following basis or combination thereof as <br />determined by the City Council: <br />a) Front Footage basis whereby the total cost of the project is divided by the total <br />front footage of the project (each side of the street for frontage) to yield a per <br />front foot charge which is then multiplied by the front footage of each benefitted <br />property to determine the benefitted real property owner's share of the cost; or <br />b) Acreage basis whereby the total cost of the project is divided by the total <br />acreage served to yield a per acre charge which is then multiplied by the acreage <br />of each benefitted property to determine the benefited property owner's share of <br />the cost; or <br />c) Benefitted Property basis where the total cost of the project is divided by the <br />total number of benefited properties times their sewer unit basis from Section <br />4.10(3), Table I to determine the benefitted property owner's share of the cost. <br />Section 5.5 Restrictions On Connection Permits <br />Section 5.5.1 Connection permits shall be issued only to property owners or to such <br />persons, who are duly licensed by the City of Gem Lake, to engage in the business as <br />Sewer Contractors and who have filed bonds and insurance as required by section 9.4 of <br />this Ordinance. <br />Section 5.6 Expiration Of Connection Permits <br />Section 5.6.1 All connection permits shall expire ninety (90) days after the date of <br />issuance, and any and all fees forfeited, unless the work planned and authorized is in <br />actual progress. <br />Section 5.7 Supervision And Inspections Of Connections <br />Section 5.7.1 The Senior Building Official or Plumbing Inspector shall supervise all <br />connections made to the Municipal Sanitary Sewer System. The Plumbing Inspector shall <br />approve all plans, specifications and materials and be responsible for checking all <br />excavations made for the purpose of installing or repairing these connections. <br />Section 5.7.2 The inspection of all sewer connections will be done by the Plumbing <br />Inspector. <br />