Laserfiche WebLink
Paul Emeott, Mayor <br />-1 May 11, 2007 <br />Page 3 <br />D. Technical Memorandum of Study Results <br />A memorandum will be presented, which summarizes the results of the model. The memorandum will <br />discuss each proposed development, the alternatives investigated, the results of our investigation, and <br />conclusions. Recommendations will be made for implementation of water system connections, along <br />with cost estimates for design and construction. <br />Tasks — Sanitary Sewer <br />A. Existing Sewer System Information <br />Gather information on the existing systems for both Vadnais Heights and Gem Lake. Review this <br />information to determine the available capacities of the systems. <br />B. Determine required capacities <br />Coordinate with the Comprehensive Plan as to what the proposed land use will be. This will determine <br />the proposed flow from each of the three parcels. This will require meeting with the City's Planning <br />Department to make sure our proposed system coincides with the Comprehensive Plan Update. <br />C. Develop two alternatives for Sewer Service <br />There are different options on how to provide service to these three parcels. This will narrow it down <br />to two for each parcel. Will need to determine if elevations will work for each particular system option. <br />D. Study Results <br />A report will be presented, which summarizes the results of the analysis. The memorandum will <br />discuss each proposed development, the alternatives investigated, the results of our investigation, and <br />conclusions. Recommendations will be made for implementation of sewer system connections, along <br />with cost estimates for design and construction. <br />Tasks — Overall Report <br />Funding Options <br />The final report will provide discussion addressing costs, including developer -paid, joint -municipality - <br />paid, and County -paid funding options. <br />Operation and Maintenance Impacts <br />The final report will outline the affect of each option on your operational and maintenance budget <br />and services to provide the City with a longer -term view of "real" costs. <br />Fee for Services <br />SEH proposes an hourly -not -to -exceed -fee of $18,004.00 for this project based on the services outlined <br />above. We have attached a supplemental spreadsheet demonstrating hours and rates for each parcel. <br />Please note that this fee does not include cost for the Vadnais Heights City Engineer's involvement. <br />SEH can include him on an hourly basis or he can bill the City of Vadnais Heights, who would then <br />bill the City of Gem Lake separately. <br />Additional Services <br />Public meetings are not included in our proposed scope and fee for this project, but SEH can provide <br />you a variety of public meeting and outreach support services for an additional, negotiated fee. <br />