Document G701TM - 2001 <br />0 <br />Change Order <br />PROJECT (Name and address): <br />Heritage Hall <br />4200 Otter Lake Road <br />White Bear Township, MN 55110 <br />TO CONTRACTOR (Name and address): <br />Lund Martin Construciton <br />3023 Randolph Street NE <br />Minneapolis, MN 55418 <br />CHANGE ORDER NUMBER: 001 <br />DATE: August 08, 2007 <br />ARCHITECT'S PROJECT NUMBER: 0625.01 <br />CONTRACT DATE: 22 May 2007 <br />CONTRACT FOR: General Construction <br />OWNER: <br />ARCHITECT: ❑ <br />CONTRACTOR: ❑ <br />FIELD: ❑ <br />:❑ <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br />1. Modification 1, 2 & 3 / L 4 CI 007 <br />a. Change all windows to commercial aluminum windows. (Value Engineering) <br />b. Revise all operating windows to casement. <br />c. Delete two windows and revise size of restroom windows. Deduct $22,313.00 <br />2. Modification 8 / LM CI 010 <br />a. Delete motorized shades at dormer windows. (Value Engineering) <br />3. Modification 9 / LM Cl 011 <br />a. Delete flagpole. (Value Engineering) <br />4. Modificaiton 10 / LM Cl 012 <br />a. Delete signage allowance. (Value Engineering) <br />TOTAL <br />The original Contract Sum was <br />The net change by previously authorized Change Orders <br />The Contract Sum prior to this Change Order was <br />The Contract Sum will be decreased by this Change Order in the amount of <br />The new Contract Sum including this Change Order will be <br />The Contract Time will be increased by Zero ( 0 ) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is November 1, 2007. <br />Deduct $3,973.00 <br />Dedut $2,295.00 <br />Deduct $6,000.00 <br />Deduct $34,581.00 <br />801,700.00 <br />0.00 <br />801.700.00 <br />(34,581.00) <br />767.119.00 <br />NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br />have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br />Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />AIA Document G701 TM11 — 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® <br />Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any <br />portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document <br />was produced by AIA software at 09:11:34 on 08/13/2007 under Order No.1000283406_1 which expires on 1/31/2008, and is not for resale. <br />User Notes: <br />(1864885586) <br />