Laserfiche WebLink
Bill To <br />CITY of GEM LAKE <br />INVOICE <br />LANDSCAPE ARCHITECTURE LAND PLANNING RESIDENTIAL DESIGN GRAPHIC DESIGN ARCHITECTURAL ILLUSTRATION <br />502 Second St., Ste. 301 Invoice #: 00004745 <br />fl� Hudson, WI 54016 Invoice Period: <br />�._ <br />Date: 10/31/07 <br />Paul Emeott, Mayor Page: 2 <br />City of Gem Lake SUMMARY: <br />4707 Hwy 61 #253 Contracted Items 2, 4 & 7 <br />White Bear Lake, MN 55110 <br />DATE <br />UNITS <br />DESCRIPTION <br />AMOUNT <br />8/6/07 <br />2.67 <br />DESIGN PROFESSIONAL: Review the Water and Sewer data with MP. Adjust layout and and print a 40x54 on bond <br />$264.10 <br />of the data. Scale the aerial image will all property data on it and print on a 40x54. <br />CONTRACT ITEM 4: SKETCH PLAN; APPLICATION OF GUIDELINES subtotal: <br />$6,500.00 <br />NOTE: Time value expended on the project reached the contracted hourly limit of $6500 on 8/6/7. <br />CONTRACT ITEM 7: CITY COUNCIL WORKSHOPS & OPENHOUSE <br />Preparation Fee: Hourly up to $3600 (up to $900/Meeting) <br />Meeting Fee: Hourly up to $3600 (4 Meetings x up to $900/Meeting) <br />6/21/07 <br />7/5/07 <br />2 <br />0.75 <br />PRINCIPAL: Gem Lake Site Visit <br />Phone Call with Patrick Kelly / Paul E re: Gem Lake base data and information. <br />$310.00 <br />$116.25 <br />7/9/07 <br />2.08 <br />PRINCIPAL: Prep for Gem Lake Workshop. Review base data, Drive, Set up. <br />$323.00 <br />$232.50 <br />7/9/07 <br />8/1/07 <br />1.5 <br />3.25 <br />PRINCIPAL: Attend, facilitate Gem Lake city meeting. Return. (48 mi rt.) <br />TECH 11: Replace 100 scale image of full site plan so more southern border is showing. Scan GL alternative concept <br />$243.75 <br />land planning from Westwood and the Hartford, for overlay flaps. Print zoning ordinance from online (108 pgs)bind. <br />8/ l/07 <br />0.67 <br />DESIGN PROFESSIONAL: Resize the site southeast of Tousley Ford and the overall site to fit on a 40x54. Print 1 40x54 <br />$70.35 <br />8/ 1/07 <br />2.5 <br />on bond. <br />DESIGN PROFESSIONAL: Discuss additional overlays with MP and KV. Scale the overlays in AutoCAD and save as <br />$262.50 <br />8/2/07 <br />4.75 <br />pdfs. Print a 40x54 on bond. <br />TECH II: Mount (7) (42x60) boards of enlarged 1 "=30' and 1=100, Sp for MP meeting. Arrange pies taken by MP on <br />$356.25 <br />40x,% paper, semi gloss print & mount. Print 2 pages adapt streetscape ... <br />$38.75 <br />8/2/07 <br />8/2/07 <br />0.5 <br />4.5 <br />PRINCIPAL: Drive to White Bear Township Town Hall for working meeting. <br />PRINCIPAL: Meeting with Mayor, Gretchen, Bill Short re: masterplans for Gem Lake; discuss roundabout on E, Ford <br />$697.50 <br />8/2/07 <br />0.5 <br />dealer/best use, trasitions. <br />PRINCIPAL: Return trip from workshop/meeting. <br />$38.75 <br />8/3/07 <br />2.25 <br />TECH 11: Scan concept sketch drawn form MP bumbwad, (hanson property and north of tousley city park concept) <br />$168.75 <br />shown at workshop yesterday. Create (3) 1=30 site plan with overlay. Print (40x56 bond). <br />8/6/07 <br />8/6/07 <br />2 <br />1 <br />PRINCIPAL: Prepartion of Site Plans for evening workshop. <br />SR. DESIGN ASSOC.: Illustrate and render refined site plans for Hanson Properties, Park parcel and Hoffman <br />$ .00 <br />$145.00 <br />45 <br />8/6/07 <br />1.5 <br />Comers for City Workshop. <br />TECH 11: Mount (3) boards with prints from Fri (8.3.07), of MP concept (bumbwad) Sketches. Also, mount (3) flaps <br />$112.50 <br />onto Hanson properties and Southeast comer with revised concept drawn by MP & RT. <br />8/6/07 <br />1.67 <br />DESIGN PROFESSIONAL: Mount two 40x60 boads. Get easels and other things ready for the meeting. <br />$ 35 <br />8/6/07 <br />5 <br />PRINCIPAL: Workshop 3; Introduce the discussion of what is conventional planning vs new' TND princiiples, follow <br />$775.75.00 <br />agenda of meeting and respond to observations on each of the study areas. <br />$480.90 <br />8/6/07 <br />4.58 <br />DESIGN PROFESSIONAL: Attend the Gem Lake Workshop meeting. <br />$37.50 <br />8/ 17/07 <br />0.5 <br />TECH II: Scan RT drawings for duplicates to be placed on overall site plan as flaps. <br />10/1/07 <br />1.25 <br />PRINCIPAL/DESIGNER: Prepare Keynote presentation from 4 Sections of DQG Manual. Revise pg. 7, re -save, add 3 <br />$150.00 <br />site plans, get presentation running on MP hard drive and firelite. <br />$1,522.50 <br />10/1/07 <br />10.5 <br />SR. DESIGN .ASSOC.: Prepare and print draft guideline for meeting. <br />40x60 a 40x60 foam core. Assist RT in binding and coiling the <br />$157.50 <br />10/1/07 <br />1.5 <br />DESIGN PROFESSINNAL: Trim and mount a sheet on <br />10/1/07 <br />3.5 <br />DQC books. <br />SR. DESIGN ASSOC.: Drive to Gem Lake, participate in meeting and return to Stillwater. <br />$507.50 <br />10/1/07 <br />4 <br />PRINCIPAL: Drive, set up and present workshop 4, return <br />$620.00 <br />$7,852.10 <br />Preparation, Workshops, Meetings Subtotal <br />($1,852.10 <br />10/31/07 <br />Contract was to hold meeting preparation and meetings to $6000 total <br />.Actual time vaule spent $7,852.10 less $6000 = $1,852.10 Loss adjustment <br />REIMBURSABLE EXPENSES NOT TO EXCEED $3000 <br />$3,000.00 <br />10/31/07 <br />Reimbursabale expenses from 7/6/7 through 10/31/7 available per request <br />Retainer payment applied <br />«10W'00 <br />Payment Due Date 11/30/07 <br />AppliedCredits$0.00 <br />Balance Due $16,000.00 <br />COMM U N I T I E S, N E I G H B O R 14LID O D� S B U I L D I N G S, PARKS & S P A C E, S: <br />STRATEGIES, PLANNING, DESIGN, CRITIQUES, IDENTITIES, AMENITIES; MARKETING FACILITIES/TOOLS <br />s <br />METRO OFFICE: SurrE301 TULGREN SQUARE, 502 SECOND STREET, f'tuDSoN, W1 • (715) 381-8291 • FAx (715) 381-6829 <br />STUDIO: 724 RIVERSIDE DRIVE, HUD SON, WI • E-MAIL: INFOOPUTMANPLANNINGANDOESIGN.COM • WEBSITE: WWW. PUT M ANPLANN INGANDDESIG N.COM <br />