Laserfiche WebLink
..�-.----... 'YJVVl/VVJ <br />LUNDWAR'TIN CONSTRUCTION, INC. (Phone) 612-782-2250 <br />3023 Randolph Street NE, Minneapolis, MN 55418 (Fax) 612-782-2261 <br />COST ISSUE / PROPOSAL QUOTATION NO. 026 <br />PROJECT: Heritage Hall - WBT & Gem Lake <br />' PROJECT NO.: 27164 <br />QUOTE NO.: 026 DATED.: <br />RE: PR 010 <br />ARCH. PROJECT NO,: <br />DAYS ALLOWED <br />TO: Ed Durand <br />FOR APPROVAL: <br />Rafferty Rafferty Tollefson Architects <br />278 East 7th Street <br />EXPIRATION DATE: <br />St Paul, MN 55101 <br />REQUESTED EXTENSION <br />(Phone) 651-224-4831 #3026 (Fax) 651-228-0264 OF TIME IN DAYS: <br />DESCRIPTION: <br />This issue was an alternate that was accepted in the bidding process, change spray polyurethane to a 'blown -in insulation'. <br />Once the subcontractor and Lund Martin looked at the building in place it was determined that a batt insulation or a <br />blown -in insulation at the roof line in Room 101, 102, 103, 104, and 106 could not achieve a vapor barrier seal because of <br />the framing members at the trusses, roof line- gussets, etc., the need to switch back to the spray polyurethane was <br />decided. This cost issue is to add back in the spray polyurethane at the roof line as per original scope of work in the <br />contract documents. It was also determined during this process that there was not a hard surface or another'containment' <br />product in place to allow the blown -in insulation above the ceiling grid/tile portions of the interior. The second item is to <br />provide netting to support this blown -in insulation to stay in place. <br />SUBCONTRACTORS/VENDORS <br />SUB I VENDOR WORK DESCRIPTION <br />Nordic Insulation Inc ^Spray Polyurethane vs blown -in <br />Nordic Insulation Inc Netting to hold blown -in insul in place <br />APPROVAL <br />ARCH: <br />DATE: <br />OWNER: <br />DATE: <br />DISTRIBUTION <br />SELF PERFORMED WORK <br />SUBTOTAL: <br />FEE PERCENT: I 109/6 <br />INSUR. & BOND: 1 <br />TOTAL REQUEST AMOUNT: <br />AMOUNT: <br />$10,650 <br />$385 <br />$0 <br />$11,035 <br />$1,104 <br />$12,139 <br />$121 <br />$12,260 <br />�— LUND-MARTIN CONSTRUCTION, INC. ^T <br />Signed By-, <br />Date: <br />Greg Chaffin, Vice IlPffisident of Operations <br />