Laserfiche WebLink
CITY OF GEM. LAKE <br />2006 FEE SCHEDULE <br />CONSTRUCTION PERMITS, LICENSES & INSPECTIONS (Onitinged) <br />'Mechanical Permits <br />Includes Inspections-Lism <br />MechFees06 <br />Electrical :Permits <br />Includes Iftoectioris Listed <br />ElecFees06 <br />Grading & Filling Permits <br />Includes Inspections Listed: <br />GradFeesOb <br />(May Require NPDES ,rill Evaluation or Assay) <br />Burning:Permits. <br />Per Appl ication, 1 Per. Parcel. Per Date <br />No Charge <br />Fire Inspections <br />Required Annually -Ordinance No. 77 <br />FireFees06 <br />Sio -Permits <br />Temporary Signs (30 Day Limit) <br />No Charge <br />Permanent Sign : Replacement <br />S. 50.00 per application <br />Wail.M.Qunt Signs - New <br />$100.00 per Application <br />.Sttucturai & Free Standing. Sign New <br />$ 50.00 + Bldg & Plan Review <br />All Electrical & Lighted -Signs <br />Abo'vo + ElecFees06 <br />LONtNG, SUBDIVISION & LAND USE MATTERS <br />Requestfor Rezoning <br />Pbr-Request & parcel <br />$ 2,060.00 <br />Variance hom.Oity Ordinances <br />PeT Variance <br />250.00 <br />Subdivision of. Lands <br />Minimum Fee <br />Minor Subdivisions (2 v Lots) <br />Major Subdivision (4+ Lots) <br />$ 500:00.per application <br />S.50.0.00 per subdivision <br />$250.00 per iovcieated <br />Special Use Pert -nit <br />Per Application, I Per.Parcel <br />$ 250Ab each <br />interim Use Permit <br />Per Application, I Per Parcel <br />$ 250.00 each <br />T T6pographical Maps <br />Per Map (6 Total. for City) <br />CD-ROM Version <br />$ 250:00 .per map <br />S 150.00 pet Cl) <br />Aerial .Photos (Laminated) <br />1946, 1953, 1974, 1985,.2003 <br />$150.00 per photo <br />C I'I'Y .SEWER. & RELATED. CHARGES <br />Residential Sewer User Charges <br />Annually, Per [licit <br />$ 130 {}0 <br />COmmercial Sevver.User Charge <br />Annually,.Pbr Unit <br />$ 130A0* <br />Industrial Sewer User Charge <br />Annually; Per Unit <br />S 130.OQ' <br />Metered Sanitary Sewer Charge <br />S 1:30 per 1,000.gallons. <br />Industrial Strong User.Charge <br />Per MCLS Sclieduie <br />Sewer Availability Charges <br />]Mletropolitan Cduncil*Conneetion Charge <br />-City of Gem Lake Connection Charge <br />$ 1,550.00 <br />S:650.00 <br />Seiver Connection Permit <br />Sever Changeover Permit <br />New Construction Only <br />Changeover Front Septie <br />(Septic Pump Record; :Disconnect, Seal Included) <br />$ 200.00 per permit <br />S 1.50.00 per permit <br />Sewer Reinspection Fee <br />Reinspection & Call Backs. <br />