Laserfiche WebLink
of filed En thereof <br />Burning- Permit: <br />No charge (limit one per address). <br />City Eu�eer Fee: <br />Actual cost <br />Commercial Resurfacina Fees; <br />Contractor License Fee: <br />$10Q.00 <br />Plan Review Fee: <br />.2% of -project valuation <br />Soil erosion inspection: <br />$200.00 fee if over an acre <br />Tfaver one.acre: <br />NPDS permit from the Minnesota.Pollution Control Agency <br />Actual cost. <br />Demolition Permits <br />Residential: <br />$250.00 <br />Commerciai:: <br />$700.00 <br />Driveway Permit: <br />$50.00 <br />Fence.Permit; <br />$50.00 <br />Fire Inspections: <br />.$10.0.00 per unit (includes follow-up) <br />Grading and Filling Permits: <br />The fees for each review shall be based on Table 2-A, Permit fees shall be based <br />on Table 2-2-B, <br />TABLE 2-A -- GRADING PLAN REVIEW FEES <br />50 cubic yands 38.2 m3).or less <br />$ 50.00 <br />51 to 100 cubic yards 40 m3 to 76,5 m5 <br />$ 75.00 <br />1.01 to 1,000 cubic yards (77.2 m3 to 764.6 m3 <br />$100.00 <br />1001 to 10,000 cubic yards 765.3 ml to 7645.5 rri : <br />$ 200.00 <br />�3 <br />