Laserfiche WebLink
Section 4 <br />Plumbing Permits <br />Hot Water Boiler Permit: <br />$100.00 <br />_Open Cut of Road to Tan Maim. <br />$60.00 <br />Phubbing Peraidt: <br />.$25.001PI-fixture <br />$10.00 each.additional fixture <br />$100.00 City Water Permit <br />Septic System: <br />$100.00 <br />Server Changeover Permit From Septic: <br />$250.00/system converted. <br />Sewer Connection Permit - New Construction: <br />$200.00 plus SAC, unit <br />Sewer Line Repair Permit: <br />$22.00 <br />Sewer Re -Inspection Fee: <br />. $80.00/hour 0 hour minimum) <br />Sewer Tan' <br />$60.00 <br />City Water Fee: <br />Meter - Actual Cost Plumber to obtain from White Bear Lake <br />Connection to the main line - $500.00 to White.Bear Lake <br />$250.00 to Gem Lake <br />Total. -$750.a0 plus:meter <br />0 <br />