My WebLink
|
Help
|
About
|
Sign Out
Home
2005 02-28 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2000 - 2009
>
2005
>
2005 02-28 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2026 8:23:21 AM
Creation date
7/20/2026 8:21:13 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CC PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
Show annotations
View images
View plain text
Date: February 1, 2005 <br />To: Paul Emeott <br />From: Jim Lindner <br />Re: Gem Lake Planning Commission meeting, 2-1-05 <br />++++++.... F i ....... H ++++-f ......... +�-F+-I ....++++++. <br />The Gem Lake Planning Commission met on Tuesday, February 1, 2005 in the first floor <br />meeting room of Tousley Ford. Members Jim Lindner, Kathy Robins, and Derek <br />Wippich were present. In the absence of chairman Hoeschler, Mr. Lindner served as <br />acting chair. Also present was John Lovelette, Mr. and Mrs. Kahl, Gretchen Artig- <br />Swomley, and Randy Ostebo. Gloria Tessier arrived later. <br />Before the Commission tonight were two scheduled public hearings. The first involved a <br />request for a 3 foot variance from the 25' maximum building height in the R3 zoning <br />district as stated in Ordinance 43 section 9.4 (1). Mr. and Mrs. Turnbull were unable to <br />attend tonight's meeting but they were represented by John Lovelette, division president <br />for Wayne Homes. <br />Mr. Lovelette explained how the finish grade of the proposed house was three feet over <br />l the 25' height limit. From the curb to the garage floor is two feet and the floor joists <br />J range between 12-14 inches brining the total to three feet. A 6:12 roof pitch is planned <br />for the house. <br />The primary conflict facing the Turnbulls is having a four bedroom house without <br />jeopardizing the 6:12 roof pitch makes the house three feet too high. A similar house in a <br />rambler style would run face issues due to the shape of the lot (which is on the radii of a <br />cul de sac. The total intended finished square footage is 2695 sq. ft. Mr. Lovelette <br />explained the two story house of this size is in the $80-85/sq. ft. range while a similar <br />size rambler is about $105/sq. ft. His company builds this same house in other cities and <br />variances are often necessary. <br />Pioneer Engineering addressed the ordinary high water level of the adjacent wetland and <br />assured the builder the house, if properly placed, would be at minimum two feet higher <br />than the water level. <br />The meeting was then opened to the public for comment. Mrs. Kahl acknowledged that <br />modern houses have steeper roof pitches and she wants this house built next to hers. <br />Gretchen Artig-Swomley recommended changing the zoning to allow for higher house <br />heights rather than grant a variance. Mr. Kahl asked if we could both grant a variance <br />and change the zoning to which we said we could indeed do so. Most agreed that this <br />shape lot demands this style of house. <br />
The URL can be used to link to this page
Your browser does not support the video tag.