My WebLink
|
Help
|
About
|
Sign Out
Home
2014 06-17 CCP
GemLake
>
CITY COUNCIL
>
PACKETS
>
2010 - 2019
>
2014
>
2014 06-17 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2026 8:36:40 AM
Creation date
7/20/2026 8:33:48 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CC PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
Show annotations
View images
View plain text
not resolved prior to final action. <br />F) All applicants seeking a Zoning Compliance Permit must submit a development plan <br />with their application. <br />G) Conditional Uses. All elements of a development plan which require conditional use <br />permit approval may be combined into a single conditional use permit application for the <br />proposal, with a single applicable CUP fee for review and processing in addition to other <br />required application fees. Portions of proposed buildings which may be used for permitted <br />or conditional uses need not apply for conditional use approval as part of the development <br />application, unless the tenant, occupant or owner of the space is known at the time of <br />application and will need a conditional use permit. All applications for conditional use <br />permit approval shall otherwise be processed in the same manner as other applications for <br />conditional use permit approval, using the procedures and criteria stated in Section 17.5 of <br />the Zoning Ordinance. <br />H) Any variances requested in connection with a Gateway District development proposal <br />shall be processed in the same manner as variances from other Sections of the Zoning <br />Ordinance, using the procedures and criteria stated in Section 17.4 of the Zoning Ordinance <br />I) Any applicant aggrieved by a decision, mandate or other action of the Zoning <br />Administrator may appeal the matter in the manner provided by Section 17.7 of the Zoning <br />Ordinance. <br />9.2.3 Existing Uses and Structures at Adoption of Chapter. The standards generally applicable <br />under Section 16.3 of the Zoning Ordinance shall apply to existing structures and uses located within <br />the Gateway District upon the adoption of this Section, or existing on land later added to the <br />Gateway District by re -mapping on the date a new zoning map becomes effective. An applicant <br />seeking a building permit to materially alter or expand a legally nonconforming structure within the <br />Gateway District shall submit a partial development plan, containing information as requested by the <br />Zoning Administrator to allow review of the alteration or expansion's compliance with Design <br />Review requirements set forth at 9.10 and the Connectivity Requirements set forth at 9.7.3(C). <br />9.2.4 Incentives. The City Council may establish incentives which apply to encourage certain types <br />of land use or preservation activity within the Gateway District. The Council may set the incentives <br />by adopting a separate ordinance which identifies clearly the item or items the Council seeks to <br />encourage, the allowance or allowances which the Council is willing to offer applicants, and sufficient <br />criteria to allow the Zoning Administrator and City consultants to evaluate and score applications <br />seeking to apply the incentives and allowances. The following text is an examp�l only: <br />The Cq of Gem Lake seeks to improve transit options within the Cily. Proposals which <br />incorporating public transit options into an overall development plan will receive enhanced civic space <br />credit for the space dedicated to the public transit option. Space bonuses will apply as follows: <br />Bus wailing area, uncovered. 2% bonus <br />Bus rvuitirrg area, covered: 4% <br />Bus awaiting area, integrated aw/ building: 8% <br />Bus rapid Transit access: 10% <br />Rail access or access to station: 10% <br />Rail transit station: 30% <br />Intermodal transit center- 30% <br />Proposed spaces must meet the criteria for public transit facilities established by the Metropolitan <br />Council in order to quay for space bonuses. The City Council shall approve all requests for <br />J transit incentive bonuses. The Zoning Administrator shall consult with the City Engineer to review <br />and make recommendations on the request for incentive treatment within an application. <br />The ability to alter or change incentives may not be used to allow a variance from the standards of <br />this Section or the Zoning Ordinance overall. An ordinance establishing or modifying available <br />incentives shall not take effect until 45 days after adoption and publication, and shall not apply to any <br />
The URL can be used to link to this page
Your browser does not support the video tag.