My WebLink
|
Help
|
About
|
Sign Out
Home
2006 10-16 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2000 - 2009
>
2006
>
2006 10-16 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2026 8:43:25 AM
Creation date
7/20/2026 8:41:14 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CC PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
Show annotations
View images
View plain text
most of the costs refer to the new building, however there will be other costs relating to the relocation and restoration <br />of the Town Hall. <br />Short stated that agreements are needed. He explained that the Town acquired the site and is prepared to go forward <br />immediately. He noted that discussion began with how the Township's part of the project would occur, and it was <br />initially contemplated that the Town's contribution would be to acquire the site, extend sewer and water to it, and to <br />do some improvements to the land. He reported that the Town Engineer has been directed by the Town Board to <br />prepare a feasibility report to provide sewer and water to the site. Short also explained that the Town has had a Phase <br />1 and Phase 2 Environment Study done on the property and has performed some site corrections, including removal of <br />contaminated soils and abandonment of a septic tank. He stated that the Township's total costs are estimated at <br />approximately $300,000. He noted that the cost to create the building is estimated at approximately $700,000, or a <br />two-thirds / one-third ratio, which he noted appears to be acceptable to the Town Board. At this point in the meeting, <br />the Gem Lake City Council members also indicated their agreement to this ratio. <br />Magnuson explained that part of the plan is to give the City of Gem Lake more visibility and viability and to go forward <br />in the future. He stated that it is hoped that the building will bean asset to both communities. He stated that there will <br />be a need of acceptance or at least acknowledgment of the Township costs of between $300,000 - $330,000. He stated <br />there is also a need to adjust it to make sure that the costs are fairly distributed, if the building is under budget, so there <br />is consideration if the Township has overpaid. <br />Short noted that if the building is substantially higherthat budgeted, i.e., if the cost of providing office space to the White <br />Bear Lake Conservation District would significantly increase the budget, it would have to be determined what they would <br />pay in rent. <br />Short emphasized that the visibility of a Sheriffs Department substation at this location would be an asset to both <br />communities. <br />Magnuson stated that he reviewed the draft lease agreement and that he has found problematic areas. He noted that one <br />concern is that as the agreement is currently drafted, the lease does not create an asset. He suggested that an agreement <br />should be drafted in a manner that creates an asset for both communities. Magnuson also noted a second concern in <br />that certain city council actions must be performed within the city limits. He stated that the city will have an option to <br />J go back to Tousley Ford to hold public meetings. He stated that the project for Heritage Hall will show their citizens <br />that the City is viable, has a house and lives here. He pointed out that another option would be to redraw the political <br />lines, which can be problematic, and he stated that Gem Lake does not want the Township to lose any property. He <br />stated that the goal is to work together to create a viable asset for both communities, and that they want to see an asset <br />based project. He suggested the possibility of a second Joint Powers Agreement for the ongoing operation and <br />maintenance of the facility. <br />Kelly stated that he understands the need for each community to share equity in the building, and that a JPA can address <br />that. He noted that a lease term of 99 years can be made subject to a renewable term of 99 years. He stated that <br />bonding requirements may require ownership, which will need to be investigated. He stated that an agreement can show <br />that there is real value for each community. He noted that it is clear that it must be done right to protect the tax payers <br />of both communities. He stated that one option to the boundary issue might be to seek special legislation that would <br />allow Gem Lake to have bonding hearings at the new building because they have ownership in it and because it is <br />accessible to their citizens. <br />In response to a question if voting would be an issue, Magnuson stated that he has checked with Ramsey County and that <br />this facility would work because voting can occur within 300 yards of the political boundaries. He noted that the City <br />of Gem Lake could actually have used the Town Hall for voting. Magnuson concluded that elections are not an issue. <br />A question was asked if there would be any benefit to splitting the land and trading off some open space in Gem Lake <br />with the Township to simplify the lease. Short explained that has been discussed and would be conceivable, however <br />the current proposal appears to be the best solution at this time. <br />Magnuson stated that the adjacent property to the south has as much land and its value is roughly equivalent to what the <br />Town paid for this parcel. He stated that the adjacent property is 1.6 acres, as compared to the Township property <br />J which is 1.2 acres, and that it might be simple to run the line at that point, with no net loss. He stated that he did not <br />know if net loss is an issue that needs to be addressed. He stated that giving up land is tentative for any political <br />subdivision. He noted that the project needs to be politically correct if it is to be done at all. Noting the time line, <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.