My WebLink
|
Help
|
About
|
Sign Out
Home
2006 11-20 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2000 - 2009
>
2006
>
2006 11-20 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2026 8:45:26 AM
Creation date
7/20/2026 8:43:25 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CC PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
Show annotations
View images
View plain text
3) State objectives and policies, including management principles, alternatives and <br />modifications, water quality, and protection of natural characteristics; <br />4) Set forth a management plan, including the hydrologic and water quality conditions that <br />will be sought and significant opportunities for improvement; <br />5) Describe the effect of the plan on existing drainage systems; <br />6) Describe conflicts, if any, between the watershed plan and existing plans of governmental <br />units; <br />7) Establish a procedure providing for citizen and technical advisory committees or other <br />means of public participation; <br />8) Set forth an implementation program consistent with the management plan, which includes <br />a capital improvement program and standards and schedules for amending the <br />comprehensive plans and officials controls of governmental units in the watershed to bring <br />about conformance with the watershed plans; and <br />9) Set out a procedure for amending the water plan. <br />The Plan shall be subject to the appropriate governmental unit review as required by the Act. <br />Subdivision 6. Local Water Management Plan. After the adoption of a new or revised <br />watershed management plan, each Member and any other local government unit within the Area <br />shall review its local water management plan for changes needed for it to be consistent with the <br />new or revised Watershed Management Plan. Each local water management plan shall include: <br />1) a description of the existing and proposed land uses; <br />2) a definition of drainage areas, including the volumes, rates and paths of stormwater runoff; <br />3) identification of areas and elevations for stormwater storage; <br />4) a description of water quality efforts which may be needed to implement the plan; and <br />5) an implementation program including official land use and developmental controls and a <br />capital improvement program if needed. <br />After consideration, but before adoption of a new or revised local water management plan by the <br />governmental unit, each Member or any other governmental units in the Area shall submit its <br />water management plan to the Board. The Board shall within sixty (60) days approve or <br />disapprove the plan or parts thereof. If the Board fails to complete its review within the prescribed <br />period, and unless an extension is agreed to by the Member or other local governmental unit, the <br />local plan shall be deemed approved consistent with applicable state laws. <br />Subdivision 7. Dispute Resolution for Water Plan Improvements Initiated. Appeals of <br />Wetland Conservation Act decisions shall follow the procedure outline in MN Rules Chapter <br />8420.0250. <br />Subdivision 8. Appeals of Decisions and Recommendations of the Commission. Members <br />shall comply with Commission's detenninations as to the force and effect of the Watershed <br />Management Plan, the Local Water Management Plans and any cost allocations for improvements <br />initiated pursuant to these plans. <br />Any governmental unit which disputes a determination of the Commission as to force and effect of <br />the Watershed Management Plan, any Local Water Management Plan, or the cost allocations for <br />improvements, initiated pursuant to these plans, may appeal the recommendation or decision to the <br />Board within thirty (30) days of receipt of such written notice of such determination. <br />Should the appeal not be completed to the satisfaction of all parties, a party may submit the <br />Jdispute to arbitration. Arbitration shall be conducted in the following manner: <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.