My WebLink
|
Help
|
About
|
Sign Out
Home
2006 12-21 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2000 - 2009
>
2006
>
2006 12-21 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2026 8:47:16 AM
Creation date
7/20/2026 8:45:26 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CC PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
Show annotations
View images
View plain text
WHY ARE TAXES GOING UP? <br />�l 1. HOME VALUATIONS CHANGE. <br />While the Gem Lake Tax Levy (Property Tax) does not increase due to a change in <br />the valuation of your home, your individual portion of the overall Gem Lake Tax Levy is <br />adjusted to reflect your increased our decreased share based on property values which are <br />established by Ramsey County. <br />EXAMPLE: Assume no change in Gem Lake's Property Tax Levy. If your home and <br />my home are both worth $100 in 2006 and my value is adjusted upward while your value <br />stays the same, my portion of the property tax will increase while your's will not. Thus, <br />my taxes can increase even though the Gem Lake Property Tax Levy did not change. <br />2. CONTRACTED SERVICES (+ $10,000) <br />Typically, all Gem Lake's services are provided by outside contractors or adjacent <br />municipalities. 2007 increases for these services total almost $10,000 which includes <br />police (Ramsey County Sheriff @ 5%), fire/paramedic (White Bear Lake @ 4%), Road <br />Maintenance (Private Contractor @ 50%), Insurance (private and public carriers @ 50%), <br />etc. Increases in road maintenance are actually about 5% but we have added more miles <br />of streets to maintain. <br />3. COMPREHENSIVE MUNICIPAL PLAN (+ $30,000) <br />As required by state law (Metropolitan Council), we are obligated to update our <br />Comprehensive Municipal Plan (CMP) by September 12, 2008. As a city, we started <br />working on this plan last summer. Elements of the CMP include a plan for City Water, a <br />plan for City Sewer, a Housing Development Plan, a Business Development Plan, a Mass <br />Transit Plan and several other aspects. Updating this plan is required by the State through <br />the Metropolitan Council but receives no funding (this is known as an a Unfunded <br />Mandate@). As we will need to utilize the resources of outside consultants (urban <br />planners and engineers), we have budgeted $30,000 in 2007 to complete the work <br />required. Nearly 100% of this amount will go to outside consultants. <br />4. LEGAL FEES FOR ANNEXATION MATTERS (+ $30,000) <br />The City of Gem Lake is currently engaged in 4 different legal actions in which land <br />owners are seeking concurrent detachment and annexation to Vadnais Heights. These <br />actions are currently in the Mediation Phase which means we are actively discussing the <br />issues that concern these land owners and seeking solutions. Based upon the concerns of <br />the land owners, we can avoid court and litigation expenses if we are able to satisfy their <br />concerns and have the proceedings dismissed. Last year, we were engaged in an <br />annexation trial which the City won. However, the cost to the City to defend itself was <br />over $250,000. Moving forward, we cannot afford to go down this road again. The <br />$30,000 we have budgeted this year for 2007 is to help us avoid going to court on any of <br />the 4 matters currently considered. <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.