Loading...
HomeMy WebLinkAbout2025 09-16 CC PacketCITY OF GEM LAKE Heritage Hall 4200 Otter Lake Road | Gem Lake, MN 55110 651-747-2790/92 | 651-747-2795 (fax) E-mail city@gemlakemn.org City Council Meeting – September 16, 2025 Call to Order of City Council Meeting By Mayor Artig-Swomley at 7:_____ p.m. Call of Roll Artig-Swomley Cacioppo Patrick Johnson Lindner Approve Agenda and Minutes •Accept the Agenda for the September 16, 2025, City Council Meeting •Approve the Minutes of August 19, 2025, City Council Meeting Special Presentations/Public Hearings •2024 Audit Presentation – LB Carlson and Malloy, Montague, Karnowski, Radosevich, and Co., P.A. – Jim Eichten, CPA •2026 Preliminary Budget Presentation / Public Hearing – White Bear Township Finance Officer, Tom Kelly Consent Agenda •Resolution #2025-025; Adopting the Preliminary Amount to be Raised by Property Taxation for the Year 2026 •Resolution #2025-026; Resolution Authorizing the City Treasurer to Distribute a Portion of the Charitable Gambling Funds to the White Bear Lake Area Food Shelf •Monthly Financial Report(s) •Claims Committee Reports •Planning Commission Old Business •Newsletter Updates / Topics / Suggestions •Future Water System Planning •Gem Lake Trail Policy Update New Business •2026 White Bear Lake Police and Fire Contract Discussion •Scheduling of Date and Time of Truth in Taxation Hearing •Heritage Hall Room Rental Coverage o Thursday, October 30, 2025 – Otter Lake Technology – AV Equipment Needed – 6 p.m. – 8 p.m. o Tuesday, October 28, 2025 – White Bear Preserve Condo Association – 6:30 p.m. – 8:30 p.m. • Archery Deer Hunting Applications o 5 Daniels Farm Road o 7 & 11 Daniels Farm Road o 1270 Goose Lake Road • Future Charitable Gambling Donations o White Bear Lake Emergency Food Shelf Community Outreach to Other Cities and Government Bodies Presentations from the Public, 2 minutes maximum Open Items for Council Members to Bring Up Future Council Meetings • Next City Council Meeting, Tuesday, October 21, 2025 o Attendance Inquiry • Next City Council Workshop, Monday, October 13, 2025 – CANCELED Adjournment – The meeting adjourned at ________ City of Gem Lake City Council Meeting Minutes August 19, 2025 1 City of Gem Lake City Council Meeting – August 19, 2025 Meeting Minutes Mayor Gretchen Artig-Swomley called the meeting to order at 7:00 p.m. Councilmembers Jim Lindner, Len Cacioppo, Ben Johnson, and Joshua Patrick were present. Also present: City Attorney Martin Norder, City Treasurer Tom Kelly, Acting City Clerk Melissa Lawrence, Gem Lake business owner Max Vannelli, The Lakes Dispensary, and residents Daniel Epelboim, Tom Bolfing, and Jim Wilson. August 19, 2025, Agenda A motion was introduced by Councilmember Linder to accept the agenda, seconded by Councilmember Cacioppo. Motion carried 5-0. Minutes A motion was introduced by Councilmember Lindner, seconded by Councilmember Cacioppo to approve the July 15, 2025, City Council Meeting minutes. Motion carried 5-0. A motion was introduced by Councilmember Lindner, seconded by Councilmember Cacioppo to approve the August 7, 2025, Special City Council Meeting minutes. Motion carried 5-0. A motion was introduced by Councilmember Lindner, seconded by Councilmember Cacioppo to accept the August 12, 2025, Planning Commission Meeting Minutes. Motion carried 5-0. Special Presentations/Public Hearings None Consent Agenda Resolution #2025-021 August 2025 Donation to White Bear Lake Area Food Shelf Resolution #2025-022 August 2025 Donation to Willow Lane Elementary Monthly Financial Report(s) Claims All items on the consent agenda were reviewed by the Council. Councilmember Lindner introduced a motion to approve all the items listed on the consent agenda, seconded by Councilmember Cacioppo. Motion carried 5-0. Committee Reports Planning Commission Chair Don Cummings was unable to attend the meeting but sent the mayor a summary of what happened at the planning commission meeting. The Planning Commission is recommending an update to the Consolidated Land Use Ordinance No. 131 and Appendix A. The updates are the result of excellent staff work by TKDA, led by CJ Sycks, and thorough, successive discussions over spring and summer Planning Commission meetings and a Public Hearing. The Commission will be addressing the "Gateway District" portion of the Land Use Ordinance separately in meetings ahead and in conjunction with beginning work on the next round of Comprehensive Plan work. The Planning Commission would also like to strongly endorse the appointment of Daniel Epelboim to the Gem Lake Planning Commission. Mr. Epelboim brings a strong interest in our city's future, a thoughtful style of engagement, and executive level experience in large organizations. He has attended many City Council meetings and most recently Planning Commission meetings related to the Land Use Ordinance. Chair Cummings also wanted to make sure that the city was addressing the recent attempted fraud incident that happened after the last Planning Commission meeting. Old Business Newsletter Updates / Topics / Suggestions The August edition of the Newsletter has been printed and mailed. Acting City Clerk Melissa Lawrence has been working on putting stories into the next edition of the Newsletter to get it started. City of Gem Lake City Council Meeting Minutes August 19, 2025 2 Code Enforcement Issues Discussion All code enforcement issues have been resolved at the moment for the one property located along Scheuneman Road. Potential Water System Planning along Labore Road/Goose Lake Road At the July City Council meeting the Council approved SEH to begin the planning phase of the project. Obtaining soil borings is the first step that SEH is taking. The more shovel ready the city is with the project the better opportunity the city has at receiving funding and start the next phase of planning and public hearing. New Business 1599 County Road E East – Conditional Use Permit for a Wall Mounted Illuminated Sign The applicant is requesting a conditional use permit (CUP) for 1599 County Road E East to erect an illuminated sign on the wall of The Lakes Dispensary. Roger Vannelli is the applicant and owner of the business. The sign is proposed to be 24 feet long by 5 feet tall with the text “The Lakes Dispensary” and a logo on the left-hand side of the text. The lighting is to be illuminated internally by LED tubing. Signage is regulated by Ordinance 131, Consolidated Land Use Ordinance Section 19. Sign permits are required and are typically issued administratively. Section 19.5.2.4 outlines the standards for Illuminated signs and states, “Application for approval of lighting or electronic features shall be made in the manner of a conditional use permit, using the procedure stated at Section 17.5 of this Ordinance.” Section 17.5 outlines the procedures for Conditional Use Permits. Conditional use permits are reviewed by staff, reviewed by the Planning commission at a Public Hearing, and forwarded to the City Council with a recommendation for action. 1599 County Road E East is located in the Neighborhood Center Sub-Zone of the Gateway District. The property is located at the intersection of Scheuneman Road and County Road E East. The building also includes Al’s Gun Shop. Ryan Podewils Properties LLC owns the property. The parcel is 0.52 acres in size and addressed 1601 County Road E East County GIS, however the southern building is considered 1599 Country Road E East. The Planning Commission reviewed the request during a public hearing on 8/12/25. The Commission discussed the impact of “soft, low lumen, LED lamps" on the surrounding areas and evaluated the criteria. The Planning Commission recommends approval of the requested Conditional Use Permit Amendment for 1599 County Road E East, with the following conditions: 1. The Applicant is permitted to install an illuminated sign in the size and to the dimensions proposed, consistent with the plans received by the City on July 22, 2025, and reviewed with this request. 2. The Applicant shall obtain all necessary local permits prior to construction, including but not limited to building, electrical, and sign. 3. The Applicant shall adhere to all other applicable local, state, and federal requirements. 4. The Applicant shall pay all fees and escrows associated with this request. Resolution #2025-023 Approving CUP for The Lakes Dispensary Councilmember Lindner introduced a motion to approve the resolution #2025-023 with the conditions listed above, seconded by Councilmember Cacioppo. Motion carried 5-0. Ordinance No. 131 – Sections 5-10, 16 Amendments and Appendix A Definitions Update The Planning Commission and City Planner reviewed the City’s zoning ordinance, referred to as the Consolidated Land Use Ordinance No. 131. Updating Ordinance No. 131 will increase zoning and permitting clarity among residents of Gem Lake. Amending the existing language and formatting will enhance the ease of use of the ordinance. City of Gem Lake City Council Meeting Minutes August 19, 2025 3 The Commission began discussing proposed updates and providing staff guidance on further improvements to the Ordinance and its appendix of definitions in June 2025. At a public hearing on August 12, 2025, the Planning Commission discussed the Ordinance updates for a third time and recommend adoption of the proposed Ordinance. Ordinance No. 131 was enacted in 2017, replacing Ordinance No. 43K (Zoning Ordinance). There are 30 Sections within Ord. No. 131. The definitions are found in Appendix A. The first four sections of Ordinance No. 131 provide a background to the purpose of the document and the related rules. Maps are provided to visualize each zoning district. Each zoning district is described in individual sections (section 5 through section 10), including the district purpose, permitted uses, and lot regulations. Concerns with the current ordinance include inconsistent formatting, combining conditional and interim uses, frequent back referencing, and unclearness. Amendments were made to provide clarity on permitting within each zoning district. This includes updated formatting, language, and division of sections, as well as the minor changes of writing conventions. To better understand the progress of these revisions since June 2025, please review the Planning Commission meeting minutes and packets. The restructuring of Sections 5, 6, 7, and 8 and clarification on Conditional vs Interim Uses was addressed. The changes can be found in the City Council Packet located on the city’s website or at Heritage Hall upon request. Appendix A included some additions to relevant definitions. This proposed update to Ordinance No. 131 focuses on enhancing clarity surrounding the permitted, accessory, conditional, and interim uses in each residential district. Additional changes proposed go hand- in-hand with this focus, such as structure setbacks. Staff recommends that additional desired Ordinance No. 131 updates be done concurrently with the upcoming Imagine 2050 Comprehensive Planning process. Updating the Comprehensive Plan and Ordinance 131 at the same time will ensure consistency between the two documents and ensure the City’s mission and goals are being accurately and effectively carried out. If additional and substantial changes to Ordinance 131 are desired, Staff will begin making note of those sections. The Metropolitan Council adopted the Imagine 2050 regional development guide. The City of Gem Lake will need to begin their comprehensive planning process at the start of the new year. A comprehensive plan update often requires updating the zoning ordinance to reflect any changes in future land use designations, allowable uses, etc. Councilmember Lindner introduced a motion to approve the amendments to Ordinance No. 131 and Appendix A updates, seconded by Councilmember Cacioppo. Motion carried 5-0. VLAWMO Joint Powers Agreement (JPA) for City Council Consideration A memo from VLAWMO Administrator, Phil Belfiori, summarized how VLAWMO is working to update its Joint Powers Agreement (JPA) in conjunction with its work to develop the 2027-2036 Watershed Management Plan. The current JPA was adopted in 2016 and will expire on December 31, 2026. While the current JPA will not expire until next year, VLAWMO determined the concurrent review and update of the JPA, and the Watershed Management Plan is the most efficient and will help ensure the documents are properly aligned. VLAWMO staff would respectfully request City Council consideration and action on the JPA by Friday, September 26, 2025, if possible. This timing would allow for best “fit” and alignment with the anticipated timing with the upcoming VLAWMO Board consideration of the next version of the VLAWMO Watershed Management Plan later this Fall /Early Winter. City of Gem Lake City Council Meeting Minutes August 19, 2025 4 Resolution #2025-024 Approving a Joint Powers Agreement (JPA) for the Continued Operation of the Vadnais Lakes Area Water Management Organization (VLAWMO) Councilmember Lindner introduced a motion to approve resolution #2025-024, seconded by Councilmember Cacioppo. Motion carried 5-0. City Clerk Position Mayor Artig-Swomley shared with the Council and those in attendance an overview of the hiring process for the new City Clerk. There were 18 applicants, with 4 withdrawing their application for various reasons. 9 of those applicants were given a Microsoft Teams interview by the mayor and current Acting City Clerk, and of those 9 applicants, 4 moved on to the in-person interviews conducted by the mayor, current Acting City Clerk, and City Treasurer, Tom Kelly. The mayor discussed with each Councilmember individually before the meeting on who to offer the position to. Councilmember Lindner introduced a motion to hire the applicant suggested by Mayor Artig-Swomley, seconded by Councilmember Cacioppo. Motion carried 5-0. Gem Lake Trail Policy The purpose of the Gem Lake Trail policy is to establish consistent guidelines for the use and maintenance of the public trail. The guidelines were established by City Staff and White Bear Township Public Works recommendations. The policy and procedures related to such use and maintenance are contained in the following statement: The City of Gem Lake intends to create an inviting environment for all Gem Lake residents and non- residents that come to use the public trail. The city has a responsibility to maintain the trail as it sees fit to encourage use and maintain public health and safety. Councilmember Lindner introduced a motion to adopt the Gem Lake Trail Policy, seconded by Councilmember Cacioppo. Motion carried 5-0. Cancellation of September Planning Commission Meeting Mayor Artig-Swomley shared that the planning commission would like to cancel their September meeting and pick back up in October on the first Tuesday of each month. Mayor Artig-Swomley agreed that it would be ok to cancel the September meeting if nothing comes up. Application for Planning Commission and Approval of Alternate Mayor Artig-Swomley again summarized the planning commissions endorsement of Daniel Epelboim to the Planning Commission. This applicant will replace the member that was appointed at the February City Council meeting but failed to make an appearance at all the meetings that took place in 2025. Councilmember Lindner introduced a motion to appoint the addition of Daniel Epelboim to the Planning Commission beginning with the October 7, 2025, meeting, seconded by Councilmember Cacioppo. Motion carried 5-0. Future Charitable Gambling Donations White Bear Lake Emergency Food Shelf Mayor Artig-Swomley suggested that the Council make a donation in September in the amount of $1,500.00 to the White Bear Lake Emergency Food Shelf. Councilmember Lindner introduced a motion to request a donation in the amount of $1500.00 for the White Bear Lake Emergency Food Shelf, seconded by Councilmember Cacioppo. Motion carried 5-0. Community Outreach to Other Cities and Government Bodies Mayor Artig-Swomley shared that the recent meeting with the City of Vadnais Heights went well. A compromise is being worked out regarding the rate at the Villas of Gem Lake and the new unit being built along Labore Road is a chance to work with Vadnais Heights and bring water down Labore Road. More information will be forthcoming. City of Gem Lake City Council Meeting Minutes August 19, 2025 5 Presentations from the Public, 2 Minutes Maximum Resident Tom Bolfing brought up the recent power outages in Gem Lake and the correlation between the trees along the easements that need to be trimmed to help prevent future power outages. Open Items for Council Members to Bring Up None Future Council Meetings City Council, Tuesday, September 16, 2025. City Council Workshop, Monday, September 8, 2025, is CANCELED. Attendance Inquiry At this time, Councilmember Lindner is the only one that will not be in attendance at the September meeting. Adjournment Being there no further business, following a motion from Councilmember Lindner, seconded by Councilmember Cacioppo, the meeting adjourned at 7:34 p.m. Respectfully submitted, Melissa Lawrence City of Gem Lake, Minnesota Audit Report for Year Ended December 31, 2024 Presented by:James H. Eichten, CPA Principal 952-224-1628jeichten@lbcarlson.com AUDITOR’S ROLE •Financial Statements are Fairly Presented in Accordance with Accounting Principles Generally Accepted in the United States of America Opinion on Financial Statements •Financial Statement Audit •MN Legal Compliance AuditInternal Controls and Compliance AUDIT RESULTS •Unmodified Opinion on Basic Financial StatementsFinancial Statements •Two Deficiencies in Internal Control over Financial Reporting Inadequate Segregation of Duties Software Conversion and Error Correction •No Instances of Noncompliance Internal Control and Compliance – Financial Audit AUDIT RESULTS •No Instances of Noncompliance with Minnesota Laws and Regulations MN Legal Compliance TOTAL MARKET VALUE TAX RATES GOVERNMENTAL FUNDSCHANGEINFUNDBALANCE GENERAL FUND FINANCIAL POSITION GENERAL FUND REVENUE BY SOURCE GENERAL FUND EXPENDITURES BY FUNCTION ENTERPRISE FUNDSSUMMARYOFCHANGES IN NET POSITION WATER FUND SEWER FUND SUMMARY STATEMENT OF NET POSITION MANAGEMENT REPORT •Implementation of GASB Standards on Accounting Changes and Compensated AbsencesAccounting and Auditing Updates SUMMARY •Clean Opinion on Financial Statements •Two Findings Reported •Improving General Fund Financial Condition •Solid General Fund Balance •Stable Net Position of Enterprise Funds •Implemented New Accounting Standards •Commitment to Audit Process and Results 2026 PRELIMINARY BUDGET •2026 BUDGET HIGHLIGHTS/CHANGES •COMMENTS/QUESTIONS •APPROVAL OF RESOLUTION BUDGET HIGHLIGHTS/CHANGES •DEBT LEVY BASED ON BOND SCHEDULE PROPOSED AT $85,778 •BUDGET FOR CONTINGENCY PROPOSED AT $15,000 •CLERK/GENERAL GOVERNMANTINCLUDEDS$74,033 FOR WAGES AND BENEFITS •POLICE AND FIRE BUDGET INCREASED 4.16% AND 1.22% RESPECTFULLY •INCLUDES $23,258 FOR DEBT PAYMENTS ON NEW PUBLIC SAFETY FACILITY BUDGET HIGHLIGHTS/CHANGES •ROAD MAINTENANCE BUDGET INCLUDES $20,000 SWEEPING & MAINTENANCE •$8,000 FOR TREE TRIMMING •SNOW REMOVAL BUDGET INCREASED $1,500 TO $25,000. •$16,000 FOR PARK MAINTENANCE •TRANSFER OF $20,000 FOR FUTURE IMPROVEMENTS BUDGET HIGHLIGHTS/CHANGES •HERITAGE HALL BUDGET INCLUDES $20,000 FOR BUILDING IMPROVEMENTS AND $10,000 FOR OTHER IMPROVEMENTS •OTHER LINE ITEMS ADJUSTED BASED ON CURRENT AND PAST ACTUAL NUMBERS BUDGET HIGHLIGHTS/CHANGES CITY OF GEM LAKE PROPERTY TAX CHANGES 2023 2023 2024 2024 2025 2025 2026 2026 Preliminary Final Preliminary Final Preliminary Final Preliminary Proposed Preliminary Proposed Levy Levy Levy Levy Levy Levy Levy Levy To Preliminary To Final GENRAL LEVY 584,697 568,897 636,188 615,527 650,021 635,000 682,227 0 4.955% 7.437% DEBT LEVY: GENERAL DEBT LEVY 00000000 CAPITAL IMPROV. PLAN BONDS 77,873 75,940 76,269 76,269 79,711 79,711 77,763 0 -2.444% -2.444% 2015 IMPROVEMENT BONDS 00000000 2018 IMPROVEMENT BONDS 6,545 6,384 5,285 5,285 4,025 4,025 8,015 0 99.130% 99.130% TOTAL DEBT LEVY 84,418 82,324 81,554 81,554 83,736 83,736 85,778 0 TOTAL PROPERTY TAX LEVY 669,115 651,221 717,742 697,081 733,757 718,736 768,005 0 4.667% 6.855% LESS: FISCAL DISPARITIES 17,894 17,894 19,581 23,290 23,290 23,290 21,025 0 -9.725% -9.725% NET PROPERTY TAXES 651,221 633,327 698,161 673,791 710,467 695,446 746,980 0 5.139% 7.410% BUDGET HIGHLIGHTS/CHANGES TAX CAPACITY 1,601,998 1,601,998 1,601,998 1,761,615 1,799,843 1,809,157 1,884,274 1,884,274 4.691% 4.152% TAX RATE 40.651% 39.534% 43.581% 38.248% 39.474% 38.440% 39.643% 0.000% MEDIAN VALUE HOME 395,800 395,800 429,600 429,600 443,750 443,750 460,750 460,750 3.831% 3.831% TAXABLE MEDIAN VALUE HOME 367,018 367,018 397,776 397,776 437,138 437,138 455,668 455,668 4.239% 4.239% TAXABLE TAX CAPACITY 3,670 3,670 3,978 3,978 4,371 4,371 4,557 4,557 CITY TAXES $1,491.95 $1,450.95 $1,733.53 $1,521.43 $1,725.55 $1,680.37 $1,806.40 $0.00 4.685% 7.500% BUDGET COMMENTS/QUESTIONS APPROVE RESOLUTION 2025-025 CITY OF GEM LAKE Heritage Hall 4200 Otter Lake Road | Gem Lake, MN 55110 651-747-2790/92 | 651-747-2795 (fax) E-mail city@gemlakemn.org September 16, 2025 RE: 2026 Preliminary Property Tax Levy. State Statutes require Cities to certify their preliminary property tax levies by September 30th this year. Once the preliminary property tax levy is approved and certified to the County Auditor, the City can lower the levy during the remaining budget process but cannot exceed the certified preliminary levy. For this reason, most Cities certify a preliminary levy using worst-case budget scenarios, which is the case with the City’s 2026 preliminary property levy and budget. The 2026 preliminary property tax levy is proposed at $768,005, which is a 4.667% increase from the 2025 certified preliminary property tax levy. The 2026 preliminary property tax levy consists of a debt levy of $85,778 (an increase from 2025 preliminary debt levy of $2,042) and the general operating levy of $682,227 (an increase of 4.955% from the 2025 preliminary tax levy). The following changes were made from the 2025 adopted budget as a basis for the 2026 proposed preliminary property tax levy: 1. Based on the 2015 Refunding Bond schedule the debt levy for 2026 is set for $77,763. In addition, in 2018, the City issued bonds for the improvements on Scheuneman Road and the 2026 debt levy for this issue is $8,015. These two debt levies make up the City’s 2026 debt levy of $85,778. 2. City Council contingency was increased to $15,000 (was $9,000). 3. Clerk/General Government budget includes $55,000.00 for wages and $9,900 for health insurance coverage. 4. Planning & Zoning budget increased $15,000.00 based on past expenditures. 5. Police budget increased 4.16% to $153,537 based on the City of White Bear Lake budget provided to us and includes $139,470 for police services and $14,067 for debt payments on the new public facilities building. 6. The cost of fire services increased 1.22% to $53,474.00. It includes $35,196 for fire services, $9,087 for fire marshal services, and $9,191 for depreciation on the new public facilities building. a. Overall, the City of White Bear Lake would like you to pay $23,258 for the next 20 years for their new facility. 7. Road Maintenance budget includes $20,000 for road maintenance/repair and $8,000 for trimming boulevard trees. 8. Salt/sand increased $1,500 to $25,000 and snow plowing and sanding based on past expenditures. 9. Heritage Hall budget includes $20,000 for building improvements and $10,000 for other equipment/improvements. 10. Included a park maintenance budget of $10,000 for maintaining the park area of the Villas of Gem Lake. 11. The 2025 budget includes $20,000.00 for future improvements. 12. Other revenue and other expenditure line items adjusted based on past history. These changes result in the city proposed preliminary tax levy of $768,005 for 2026. This compares to 2025 preliminary levy of $733,757 and 2025 final levy of $718,736. Using a 2026 property tax levy of $768,005 and the City’s 2026 estimated tax capacity ($1,884,274) and median valued home ($460,750) for Gem Lake, that median valued home, would pay City property taxes of $1,806.40 in 2026 compared to 2025 preliminary levy of $1,725.55 (an increase of $80.85) and the 2025 final levy amount of $1,680.37 (an increase of $126.03). Again, as the City prepares its final 2026 budget the property tax levy can be lowered from the preliminary levy but not increased above the preliminary levy. The action requested tonight is for the City Council to adopt the resolution adopting the 2026 preliminary property tax levy of $768,005. Tom Kelly Gem Lake City Treasurer City of Gem Lake County of Ramsey State of Minnesota Resolution No. 2025-025 A RESOLUTION ADOPTING THE PRELIMINARY AMOUNT TO BE RAISED BY PROPERTY TAXATION FOR THE YEAR 2026 WHEREAS, the City Treasurer has presented a (Proposed) General Fund Budget of $755,032.00 which includes a (Proposed) General Tax Levy of $682,227.00 and a Debt Tax Levy of $85,778.00 for fiscal and calendar year 2026 based upon best estimates of costs for running the City of Gem Lake in 2026; and NOW, THEREFORE BE IT RESOLVED, that the City Council of the City of Gem Lake does formally adopt the 2026 Preliminary Tax Levy as follows General Property Tax Levy $682,227.00 Debt Levy 85,778.00 Total Levy $768,005.00 ; and BE IT FURTHER RESOLVED that the City Clerk is charged with Certifying said Tax and Debt Levy to Ramsey County Property Taxation and other government bodies for whom this information is required. The foregoing Resolution was offered by Councilmember __________ and was supported by Councilmember __________ and was declared adopted/not adopted based upon the following vote: NAME ARTIG-SWOMLEY CACIOPPO LINDNER JOHNSON PATRICK Vote Attest I, Barbara Suciu, the duly qualified City Clerk for the City of Gem Lake, County of Ramsey, State of Minnesota, do hereby certify that the foregoing Resolution is a true and accurate representation of action taken by the City Council of the City of Gem Lake on the date first written. 16 September 2025 BARBARA SUCIU, City Clerk Date City of Gem Lake County of Ramsey State of Minnesota Resolution No. 2025-026 A RESOLUTION AUTHORIZING THE CITY TREASURER TO DISTRIBUTE A PORTION OF THE CHARITABLE GAMBLING FUNDS TO THE WHITE BEAR LAKE AREA FOOD SHELF. WHEREAS, the City of Gem Lake participates in the distribution of charitable gambling funds received from the Country Lounge WHEREAS, the City of Gem Lake distributes these funds to local 501(c)(3) tax-exempt organizations WHEREAS, the City of Gem Lake City Council suggested a donation at their August 19, 2025, meeting in support of the White Bear Lake Area Food Shelf. NOW, THEREFORE BE IT RESOLVED, by the City of Gem Lake, Minnesota, the City Treasurer is authorized to send $1,500.00 to support the White Bear Lake Area Food Shelf for the month of September 2025. The motion for adoption of the foregoing Resolution was duly introduced by Councilmember __________ and supported by Councilmember __________, and upon vote being taken thereon, the resolution passed with a vote of _____ in favor and _____ against. ATTEST I, Barbara Suciu, the duly qualified City Clerk of the City of Gem Lake, County of Ramsey, State of Minnesota, do hereby certify that the foregoing Resolution is a true and accurate representation of action taken by the City Council of the City of Gem Lake on the date first written. September 16, 2025 Barbara Suciu, City Clerk Date CITY OF GEM LAKE Claims For Payment Period Ending:9/16/2025 Signatures Approving Claims Date of Approval Gretchen Artig-Swomley, Mayor Ben Johnson, Council Jim Lindner, Council Len Cacioppo, Council Joshua Patrick, Council Tom Kelly, Treasurer Fund Totals $ Amount General Fund 17,303.86 Parks & Playgrounds 2004 Debt Service Fund 2007 Debt Service Fund 2015 Debt Service Fund 2018 Debt Service Fund Improvement Fund Scheuneman Road Improvements Hoffman Road Improvements 602-Sewer Fund 4,300.79 601-Water Fund 18,932.33 Investment Trust Fund Total All Funds 40,536.98 Claims for Payment Check Numbers 12927 through 12952 CHECK REGISTER FOR CITY OF GEM LAKE CHECK DATE 09/16/2025 - 09/16/2025 Check Date Check Vendor Name Amount Bank GEN GENERAL CHECKING 09/16/2025 12927 CINTAS 130.50 09/16/2025 12928 CINTAS 31.95 09/16/2025 12929 City of White Bear Lake 1,340.00 09/16/2025 12930 Core & Main 248.45 09/16/2025 12931 Coverall of the Twin Cities 320.00 09/16/2025 12932 GDO Law 140.00 09/16/2025 12933 Gopher State One Call 18.90 09/16/2025 12934 IIMC 220.00 09/16/2025 12935 Innovative Office Solutions, 150.10 09/16/2025 12936 INVOICE CLOUD INC 565.75 09/16/2025 12937 Kelly & Lemmons, PA 544.00 09/16/2025 12938 Melissa Lawrence 21.63 09/16/2025 12939 METRO-INET 1,160.00 09/16/2025 12940 Metropolitan Council 4,281.89 09/16/2025 12941 Nykanen Inspections LCC 80.00 09/16/2025 12942 Preimier Bank 688.71 09/16/2025 12943 Press Publications 539.00 09/16/2025 12944 RED LILY 217.50 09/16/2025 12945 SEH 22,217.26 09/16/2025 12946 SQUEEGEE MAGIC 194.68 09/16/2025 12947 TKDA 919.68 09/16/2025 12948 TOM DUNN PHOTOGRAPHY, LLC 500.00 09/16/2025 12949 Trade Press Inc 54.00 09/16/2025 12950 White Bear Lake Emergency Foo 1,500.00 09/16/2025 12951 White Bear Township 3,595.25 09/16/2025 12952 Xcel Energy 857.73 GEN TOTALS: Total of 26 Checks:40,536.98 Less 0 Void Checks:0.00 Total of 26 Disbursements:40,536.98 09/16/2025 09:23 AM Page:1/1 CHECK DISBURSEMENT REPORT FOR CITY OF GEM LAKE CHECK DATE 09/16/2025 - 09/16/2025 Check Date Bank Account Check #Payee Description Accoun t Dept Amount Fund: 100 GENERAL 09/16/2025 GEN 12927 CINTAS CINTAS AED 40319 41940 130.50 09/16/2025 GEN 12928 CINTAS CINTAS RUGS 40319 41940 31.95 09/16/2025 GEN 12929 City of White Bear Lake WAC PERMIT FEE 32104 00000 1,340.00 09/16/2025 GEN 12931 Coverall of the Twin Cities CLEANING SVCS 9/1/25-9/30/25 40319 41940 320.00 09/16/2025 GEN 12932 GDO Law PROSECUTION MATTERS 41304 41600 140.00 09/16/2025 GEN 12934 IIMC MEMBERSHIP FOR B. SUCIU 40310 41900 220.00 09/16/2025 GEN 12935#Innovative Office Solutions, LLC MARKER/WATERCOLORS FOR WILLOW LANE ELEME 22001 00000 90.66 MISC. OFFICE SUPPLIES 40200 41400 38.82 MISC. OFFICE SUPPLIES 40200 41400 20.62 Check GEN 12935 Total for Fund 100 GENERAL 150.10 09/16/2025 GEN 12936 INVOICE CLOUD INC INVOICE CLOUD FEES 40309 41500 565.75 09/16/2025 GEN 12937 Kelly & Lemmons, PA GENERAL COUNSEL 40304 41600 544.00 09/16/2025 GEN 12938 Melissa Lawrence MILEAGE REIMBURSEMENT 40331 41900 21.63 09/16/2025 GEN 12939 METRO-INET IT SUPPORT 40309 41900 1,160.00 09/16/2025 GEN 12941 Nykanen Inspections LCC AUGUST 2025 INSPECTIONS 32213 00000 80.00 09/16/2025 GEN 12942#Preimier Bank WALMART- WILLOW LANE DONATION ITEMS 22001 00000 616.25 TARGET- WILLOW LANE DONATION ITEMS 22001 00000 41.68 TARGET- CANDY BOWL 40200 41900 29.78 SEPTEMBER 2025 CC FEE 34133 00000 1.00 Check GEN 12942 Total for Fund 100 GENERAL 688.71 09/16/2025 GEN 12943 Press Publications ORDINANCE 64 40351 41900 176.00 ORDINANCE 129 40351 41900 154.00 ORDINANCE 131 40351 41900 143.00 LEGAL NOTICE PUBLICATION 40351 41900 66.00 Check GEN 12943 Total for Fund 100 GENERAL 539.00 09/16/2025 GEN 12944 RED LILY WEBSITE MAINTENANCE/REDESIGN 40300 41940 217.50 09/16/2025 GEN 12945*#SEH GENERAL ENGINEERING SERVICES 40303 41910 3,533.38 09/16/2025 GEN 12946 SQUEEGEE MAGIC WINDOW CLEANING 40319 41940 194.68 09/16/2025 GEN 12947 TKDA GEM LAKE PLANNING 40308 41910 919.68 09/16/2025 GEN 12948 TOM DUNN PHOTOGRAPHY, LLC GEM LAKE CITY HALL PHOTOS 40300 41940 500.00 09/16/2025 GEN 12949 Trade Press Inc BUSINESS CARDS - B. SUCIU 40200 41900 54.00 09/16/2025 GEN 12950 White Bear Lake Emergency Food She SEPTEMBER 2025 DONATION 22001 00000 1,500.00 09/16/2025 GEN 12951#White Bear Township PUBLIC WORKS 40319 41940 240.00 EQUIPMENT 40319 41900 245.00 TREASURER 40329 41500 356.25 BUILDING INSPECTOR 40313 42401 103.73 POSTAGE 40322 41900 181.30 RAMSEY COUNTY INV# PUBW-021617 40319 41940 2,468.97 09/16/2025 09:24 AM Page:1/2 CHECK DISBURSEMENT REPORT FOR CITY OF GEM LAKE CHECK DATE 09/16/2025 - 09/16/2025 Check Date Bank Account Check #Payee Description Accoun t Dept Amount Fund: 100 GENERAL Check GEN 12951 Total for Fund 100 GENERAL 3,595.25 09/16/2025 GEN 12952#Xcel Energy XCEL ELECTRIC 40381 41940 701.80 XCEL GAS 40383 41940 46.84 XCEL STREET LIGHTS 40386 43122 109.09 Check GEN 12952 Total for Fund 100 GENERAL 857.73 Total For Fund: 100 17,303.86 Fund: 601 WATER UTILITY FUND 09/16/2025 GEN 12930 Core & Main METERS 40227 43200 248.45 09/16/2025 GEN 12945*#SEH WATERMAIN PROJECT 40303 43200 18,683.88 Total For Fund: 601 18,932.33 Fund: 602 SEWER UTILITY FUND 09/16/2025 GEN 12933 Gopher State One Call GOPHER STATE LOCATES 40319 43200 18.90 09/16/2025 GEN 12940 Metropolitan Council WASTE WATER SERVICES OCTOBER 2025 11500 00000 4,281.89 Total For Fund: 602 4,300.79 Report Total:40,536.98 '*'-INDICATES CHECK DISTRIBUTED TO MORE THAN ONE FUND '#'-INDICATES CHECK DISTRIBUTED TO MORE THAN ONE DEPARTMENT 09/16/2025 09:24 AM Page:2/2 Feasibility Study Gem Lake Water Main Extension Ph. 1 City of Gem Lake, MN GEMLK 186534 | August 22, 2025 DR A F T Engineers | Architects | Planners | Scientists Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-3507 651.490.2000 | 800.325.2055 | 888.908.8166 fax | sehinc.com SEH is 100% employee-owned | Affirmative Action–Equal Opportunity Employer August 22, 2025 RE: Gem Lake Water Main Extension Ph. 1 Feasibility Study City of Gem Lake, MN SEH No. GEMLK 186534 4.00 Gretchen Artig-Swomley, Mayor City of Gem Lake 4200 Otter Lake Road Gem Lake, MN 55110 Dear Mayor Artig-Swomley: We are pleased to present the Municipal Water Extension Feasibility Report for the City of Gem Lake. This study evaluates the proposed extension of the water main from the City of Vadnais Heights. Previous feasibility studies, completed in 2006 and 2022, examined the potential for a centralized water distribution system within Gem Lake to provide a safe and reliable water supply for all residents and businesses. In addition to centralized service, the earlier studies explored smaller, localized water supply projects that could be phased in to address areas with known well water quality concerns. These localized systems would connect to the nearest surrounding community’s distribution network, helping to minimize both cost and complexity. This report builds on those efforts by specifically assessing the extension of the Vadnais Heights water main at the Labore Road connection, previously identified as Priority 1, Option 1. Since Gem Lake does not plan to develop its own water source, the City must rely on neighboring communities to supply water to its distribution system. While earlier studies focused on evaluating water demand, quality, and the capacity of nearby community systems, this report is intended to advance the project through potential grant funding and by initiating the 429 process to assess the benefiting properties for the proposed water main. It is our pleasure to assist the city of Gem Lake with this project, and we look forward to discussing this report and potential next steps with you. If you have any questions about this report, please contact me at 612.270.3882. Sincerely, Dustin Cesafsky Project Manager ah/djc x:\fj\g\gemlk\186534\4-prelim-dsgn-rpts\_2025 gem lake municipal water extension feasibility report.docx DR A F T Feasibility Study Gem Lake Water Main Extension Ph. 1 City of Gem Lake, MN SEH No. GEMLK 186534 August 22, 2025 I hereby certify that this report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Greg F. Anderson, PE Date: License No.: 26859 Reviewed By: Dustin Cesafsky Date: Short Elliott Hendrickson Inc. 3535 Vadnais Center Drive St. Paul, MN 55110-3507 651.490.2000 DR A F T FEASIBILITY STUDY GEMLK 186534 ES-1 Executive Summary The City of Gem Lake ordered this feasibility study to evaluate extending municipal water service to properties along Goose Lake Road, Tessier Road, Haven Lane, Big Fox Road, and Little Fox Lane in response to recent well testing that detected 1,4-dioxane, a likely human carcinogen, above health- based guidance levels. (see figure ES-1 below) Most residents currently rely on private wells, with limited municipal service provided through earlier connections to Vadnais Heights and White Bear Lake. This study identifies extending a 12-inch water main from Vadnais Heights along Labore Road, with connections at Little Fox Lane and Goose Lake Road and supporting 6-inch mains to local streets, as the most cost-effective and feasible option. Vadnais Heights has adequate supply capacity and delivers safe, treated water that meets all standards, while looping options to the Gem Lake Villas water main should also be considered to improve system redundancy. The improvements will provide residents with potable water, reliable pressures, and fire protection capacity, with construction anticipated to remain largely within existing rights-of-way. Project costs are proposed to be funded through special assessments to benefiting properties, City contributions, and grant funding, with an independent appraisal confirming assessable benefit values. If approved, the City Council can proceed under Minnesota Statute 429, beginning with an Improvement Hearing in fall 2025, with bidding in early 2026 and construction scheduled for April through July 2026. The study concludes that the improvements are necessary, feasible, and cost-effective, and recommends that the Council accept the report, hold the Improvement Hearing, and move forward with design, bidding, and construction. Figure ES-1 – Current 1,4-dioxane Contamination Testing Results SEH is a registered trademark of Short Elliott Hendrickson Inc. FEASIBILITY STUDY GEMLK 186534 i Contents Letter of Transmittal Certification Page Executive Summary Contents 1 Background ................................................................ 1 2 Existing Conditions ..................................................... 1 3 Proposed Improvements ............................................ 1 3.1 Little Fox Lane Connection ..................................................................... 2 3.2 Goose Lake Road Connection ................................................................ 2 3.3 Connection to the Vadnais Heights System ........................................... 2 3.4 Additional Connection Options\Looping .................................................. 4 4 Right of Way and Easements ..................................... 4 5 Cost Recovery ............................................................ 5 5.1 Benefits and Assessments ..................................................................... 5 5.2 Special Benefit Analysis ......................................................................... 5 6 Proposed Schedule .................................................... 5 7 Conclusions and Recommendations .......................... 6 7.1 Conclusion .............................................................................................. 6 7.2 Recommendation ................................................................................... 6 List of Tables Table 1 – Billing Rates and Connection Charges for Vadnais Heights ....................... 3 List of Figures Figure 1 – Project Overview Figure 2 – Typical Section Figure 3 – Proposed Improvements Figure 4 – Assessment Map Contents (continued) FEASIBILITY STUDY GEMLK 186534 ii List of Appendices Appendix A Detailed Cost Estimate Appendix B Preliminary Assessment Roll GEMLK 186534 Page 1 Feasibility Study Gem Lake Water Main Extension Ph. 1 Prepared for City of Gem Lake, Minnesota 1 Background This feasibility report outlines a plan to provide municipal drinking water to Gem Lake properties located along Goose Lake Road, Tessier Road, Haven Lane, Big Fox Road, and Little Fox Lane. The report was authorized by the City Council at their regular meeting on Tuesday, June 17, 2025. Short Elliott Hendrickson Inc. (SEH®) prepared a Municipal Water Supply Feasibility Study in 2006 and again in 2022 for the City of Gem Lake. That study reviewed options to provide a municipal water supply system throughout the entire city of Gem Lake. Recently the Minnesota Pollution Control Agency (MPCA) and Minnesota Department of Health (MDH) completed sampling for 1,4-dioxane, a likely known human carcinogen, in private wells in Gem Lake. Results of the sampling showed levels above the MDH health-based guidance value for 1,4-dioxane in some of the private wells in Gem lake. The proposed improvements include extending a water system from the City of Vadnais Heights along Labore Road, which was previously described as Priority 1 option 1 in the latest 2022 Feasibility Study. 2 Existing Conditions Currently, most residents and businesses in Gem Lake rely on private wells for their water supply. Exceptions include AutoNation, the White Bear Montessori School, and the Villas off County Rd E which receive water from Vadnais Heights, as well as properties served by the 2016 water main extension along Scheuneman Road, supplied by White Bear Lake. The proposed project area includes Labore Road, a rural county roadway, along with several local rural streets primarily centered within the existing right-of-way. Portions of these streets pass through wooded areas adjacent to the roadway. 3 Proposed Improvements The 2022 study recommended connecting to the City of Vadnais Heights for several reasons. Vadnais Heights is currently working with a developer to extend a 12-inch water main within the ditch along the west side of Labore Road up to Little Fox Lane, providing a convenient connection point for the proposed extension. Installing the water main within the ditch will also help minimize impacts to Labore Road, a county roadway that was resurfaced only a few years ago. FEASIBILITY STUDY GEMLK 186534 Page 2 Vadnais Heights has the capacity to meet Gem Lake’s projected water demands and provides a water supply that meets all applicable State, Federal, and Minnesota Department of Health standards. Water quality data was reviewed using the City’s Consumer Confidence Reports (CCRs), which are annual drinking water quality reports required by the U.S. Environmental Protection Agency. Vadnais Heights draws its water from three deep wells, 470–495 feet, tapping the Prairie Du Chien–Jordan and Jordan aquifers, with an additional well available for emergency use. The water is treated with chlorine for disinfection, fluoride for fluoridation, and polyphosphate to control iron and manganese, helping to maintain taste and appearance. The water is not softened and has a hardness of 12 grains per gallon, which is considered hard. 3.1 Little Fox Lane Connection The proposed Little Fox Lane connection will be installed within the western ditch of Labore Road, consisting of a 12-inch ductile iron water main. From there, an 8-inch main will extend across Labore Road to a water meter and manhole, which will be used to monitor usage. Continuing from the meter and manhole, the main will run along the north side of Little Fox Lane to minimize impacts at the Little Fox Lane/Big Fox Road intersection. It will then cross Little Fox Lane, proceed north along the west side of Big Fox Road, and terminate just north of the existing cul-de-sac. The proposed watermain will be installed at a depth of 7.5’ deep and installed approximately 4’ from the edge of the bituminous pavement to again minimize roadway impacts. 3.2 Goose Lake Road Connection The proposed Goose Lake Road connection will be installed within the southern ditch of Goose Lake Road, the water will extend from the same Labore Road future water main extension from The City of Vadnais Heights. The Goose Lake Road extension will consist of a 12-inch HDPE water main which also will be metered through a water meter and manhole. The 12- inch HDPE will extend to the east approximately 3200’. Several 6” lines will serve isolated streets along the route. The first tee to 6” main will be located at the Tessier Road intersection that will run along the east side of the roadway to its terminus at the end of the cul-de-sac. The second tee will be installed at the Haven Lane intersection and will extend down the east side of haven Lane to the end of the cul-de-sac. To again minimize impacts, the proposed watermain will be installed at a depth of 7.5’ deep and installed approximately 4’ from the edge of the bituminous pavement. 3.3 Connection to the Vadnais Heights System The City of Vadnais Heights has been in contact with the City of Gem Lake regarding both connections along Labore Rd. Based on the preliminary demand projections, they have the supply and storage capacity to serve the Gem Lake water system. With the current connection at the Gem Lake Villas, the City has experience with billing and any maintenance requirements. The hydraulic analysis and computer modeling performed as part of the 2022 report indicated that connection to the Vadnais Heights water system would produce adequate pressures and flow rates in Gem Lake. The lowest household pressure seen was 35 PSI however most of the homes were in the 60 PSI to 70 PSI range. If the pressure is too low in one of the households, a booster pump can be installed when the home decides to connect to the system. This is within the acceptable range for a water distribution system. FEASIBILITY STUDY GEMLK 186534 Page 3 Vadnais Heights billing rates are established in the municipal ordinance related to the water system (Chapter 36, Article II, Division 3) and are shown below from the 2025 Water Fee Schedule. For larger connections, fees are noted in the ordinance to be determined by the City Engineer based on the costs for installing the service. The connection fees noted below are approximate and were calculated with a 2% inflation factor from the 2018 Gem Lake Villas Agreement. Table 1 – Billing Rates and Connection Charges for Vadnais Heights Gem Lake would need to pay Vadnais Heights for water used. As property owners connect to the new Gem Lake Water System they would be responsible for obtaining a plumbing permit along with the costs associated with disconnection or abandoning their well. The resident will also be responsible for connecting their current plumbing to the new municipal main line in the right of way. Water Base Charge; Residential 3/4" Meter 13.89$ 1" Meter 27.95$ Water Usage Charge Per 1,000 gallons 6,000 Gallons of Water 1.82$ 6,001-20,000 Gallons of Water 2.92$ 20,001 - 50,000 Gallons of Water 4.90$ 50,000 Gallons of Water, All irrigation water use 6.35$ Vadanais Heights Connection Charges (Little Fox) Frontage 1080 66$ 71,280$ Area 25.24 265$ 6,689$ Unit 7 380$ 2,660$ Total 80,629$ Vadanais Heights Connection Charges (Goose Lake Road) Frontage 900 66$ 59,400$ Area 107.15 265$ 28,395$ Unit 30 380$ 11,400$ Total 99,195$ Billing: FEASIBILITY STUDY GEMLK 186534 Page 4 3.4 Additional Connection Options\Looping The City’s primary goal in extending the watermain is to provide safe drinking water to residents along the project corridor. However, both proposed extensions would terminate as dead ends, so the City should also evaluate opportunities to loop the system. The previous report identified potential connections to the Gem Lake Villas water main system (Vadnais Heights Service). The water main would extend south from Goose Lake Road, continuing between the parcels to connect midway at the end of the unimproved right-of-way east of Little Fox Lane. From there, the watermain would extend to the northwest corner of the Villas development, creating a looped system. A reference figure is provided below with the suggested loop shown as the pink dashed line. 4 Right of Way and Easements The construction of the proposed improvements in this report are anticipated to fall within existing right of way of the project roads. If the system is extended and looped in the future to the Villas Development, the City would have to acquire easements to those connections. FEASIBILITY STUDY GEMLK 186534 Page 5 5 Cost Recovery 5.1 Benefits and Assessments The City intends to levy special assessments to the benefiting properties in accordance with Minnesota Statute 429. This state law allows the City to assess adjacent properties for the costs associated with the project improvements. In addition to special assessments, the City will be utilizing a Grant to fund the remainder of the project. Following the 429 Statute, once the feasibility report is received by the City Council, a Public Improvement Hearing will need to be ordered and held. Within six months of the Public Improvement Hearing, a Council vote to adopt a resolution ordering the improvement will need to be taken or another hearing will need to be held. “Ordering” the improvement means authorizing the preparation of the plans and specifications and moving ahead towards bidding and construction. 5.2 Special Benefit Analysis An independent appraiser was hired to determine the benefit amount for the properties to have access to City supplied water, the report is attached and determined that the maximum accessible amount is $X,XXX. 6 Proposed Schedule The following schedule lists the steps and schedule the City will need to follow to construct the improvements outlined in this report during 2026: Item Date • Council Authorized Feasibility Report .............................................. June 17, 2025 • Council Receives Feasibility Report ............................................... Sept. 21, 2025 • Council Orders Improvement Hearing ............................................ Sept. 21, 2025 • Public Improvement Hearing ....................................................... October 21, 2025 • Council Authorized Preparation of Plans and Specifications ...... October 21, 2025 • Council Approves Plans and Specifications and Orders Advertisement for Bids ................................................ December 16, 2025 • Open Bids ................................................................................... January 13, 2026 • Award Project .............................................................................. January 20, 2026 • Assessment Hearing ................................................................... January 20, 2026 • Project Construction ..................................................................... April – July 2026 FEASIBILITY STUDY GEMLK 186534 Page 6 7 Conclusions and Recommendations 7.1 Conclusion From the results of our study, we conclude that: • The proposed improvements are necessary to provide the City with potable water and flows capable of fire protection for the neighborhoods. • Given the City’s desire to connect to Vadnais Heights’ water system and the location of the properties requesting municipal water. The proposed improvements are feasible and cost effective compared to other options. • The City should consider a second connection to the Vadnais Heights System with Vadnais Heights in the near future to limit the time this portion of the City would be on a dead-end-main. • The project cost of $XX,XXX would be assessable. 7.2 Recommendation • The City Council accepts this report and schedules the improvement hearing to receive public comment on the project should the Council decide to proceed with the improvements. • The improvements proceed as outlined in this report. • A portion of the costs for these improvements will be recovered from benefiting properties through special assessments, City contribution, and Grant funding. The ability to assess the amounts proposed should be verified. Figures Figure 1 – Project Overview Figure 2 – Typical Section Figure 3 – Proposed Improvements Figure 4 – Assessment Map Location Map :iOOoZ LaNH %oXOHYaUG %iUcK 3 onG 7 U aiO 3 o n G 9i H Z 'UiYH L a E oUH 5 o aG La EoUH 5 o a G 3 K H a V a n t + i O O V ' U i Y H 3on G9iHZ LanH %iUcK 3 onG %oXOH Y a U G 3on G 9 i H Z &oX U t +HUitaJH 'UiYH * o o V H L a N H 5oaG 9a G nai V 'UiY H % a P E i L a n H : K i t H % H aU3a U NZa \ 3UHV H UY H 3 O a c H .UiVtHn &oXUt 9a GnaiV Lan H 3a U N Y iH Z &oXUt 7 K oUn K i O O LanH %iUcK LaNH %oXOHYaUG 6oXtK + a Y H n La n H +oUi]on 6tUHHt (n J OiVK 6 tUHHt (OP 6t UHHt 7H V V i H U 5 o a G 7a O P a J H &i U c O H ,V a a c & o X U t : iO G * o o V H L a n H 3 a U N Z a \ 3o n G V L a n H 1 a t X U H 9 i H Z 7 U a i O )iVKHU L a nH $O p i n H $ Y H n X H (YHUJU HHn 'UiY H &it\ & H n tHU ' U i Y H Lit t OH ) o[ L a n H 9 a G naiV&H n t HU 'UiYH ,n t H U n a t i o n a O ' U i Y H -X G Von 5 oaG +oI I P a n 5oa G (aVt 3aU N 9a O O H \ L a n H 6X P Pit )aUP La nH M on t P oUH nc \ 6 tU H Ht 3aU N U iGJH 'UiYH +oIIPan 5o aG 2 t t H U L a N H 5 o a G %iEHaX 5oaG % i J ) o [ 5oa G 'aniHOV )a U P 5oaG %UiGJHZooG 7HUUacH &oXnt\ 5oaG ) (aVt *UHHnKaYHn 'UiYH $ U c a G H 6 t U H H t 2 a N PHGHLanH 6c KHXn H Pa n 5 oaG +iOOaU\)aUP L a nH &oXnt\ 5oaG ( (aVt &oXnt\ 5oaG ( (aVt +iJ K Z a \ *o oVH L a N H 5 oa G &H n tHUYiOOH5oaG ,n t HUV ta tH ( ,n t H U V t a t H   ( Project: GEMLK 186534 Figure 1Water Main Improvements - Parcel AssessmentsMap by: tschwarz Projection: NAD 1983 HARN Adj MN Ramsey (US Feet) Source: Ramsey County, City of Gem Lake, & SEH Inc. Print Date: 7/29/2025 Gem Lake, MN This map is neither a legally recorded map nor a survey map and is not intended to be used as one. This map is a compilation of records, information, and data gathered from various sources listed on this map and is to be used for reference purposes only. SEH does not warrant that the Geographic Information System (GIS) Data used to prepare this map are error free, and SEH does not represent that the GIS Data can be used for navigational, tracking, or any other purpose requiring exacting measurement of distance or direction or precision in the depiction of geographic features. The user of this map acknowledges that SEH shall not be liable for any damages which arise out of the user's access or use of data provided. Pa t h : X : \ F J \ G \ G E M L K \ 1 8 6 5 3 4 \ 5 - f i n a l - d s g n \ 5 1 - d r a w i n g s \ 9 0 - G I S \ G E M L K1 8 6 5 3 4 _ A s s e s s m e n t M a p \ G E M L K 1 8 6 5 3 4 _ A s s e s s m e n t M a p . a p r x 0 600 1,200 Feet ± Legend Assessment Parcels Gem Lake Municipal Boundary GOOSE LAKE ROAD CL MAX 3:1 MAX 3:1 Sa v e : 8 / 6 / 2 0 2 5 1 2 : 4 1 P M h c u n n i n g h a m P l o t : 8 / 1 8 / 2 0 2 5 1 0 : 2 5 A M X : \ F J \ G \ G E M L K \ 1 8 6 5 3 4 \ 5 - f i n a l - d s g n \ 5 1 - d r a w i n g s \ 1 0 - C i v i l \ c a d \ d w g \ e x h i b i t \ G E M L K 1 8 6 5 3 4 T Y P . d w g FIGURE NO. 2 PROJECT NO. DATE:R 8/18/2025 GEMLK 186534 TYPICAL SECTIONS WATER MAIN EXTENSION PH. 1 GEM LAKE, MN Proposed Improvements                                      Willow Lake Boulevard L a b o r e R o a d La b o r e R o a d Montmorency Street Talmage Lane Ju d s o n R o a d En g l i s h St r e e t In t e r n a t i o n a l Dr i v e H a v e n L a n e Ci t y C e n t e r L a n e Te s s i e r R o a d Ta l m a g e Ci r c l e C i ty Center Drive Little F o x L a n e S u m m it FarmLane Big Fox Road Daniels Farm Road County Road E East In t e r s t a t e 3 5 E Goose Lake R o a d Goos e L a k e R o a d ProMect GEML. 18653 Figu re 3Water Main ImprovementsMap by tschwar] ProMection 1AD 183 HAR1 AdM M1 Ramsey 8S Feet Source Ramsey County City oI Gem Lake SEH Inc Print Date 81805 Gem Lake M1 This map is neither a legally recorded map nor a survey map and is not intended to be used as one This map is a compilation oI records inIormation and data gathered Irom various sources listed on this map and is to be used Ior reIerence purposes only SEH does not warrant that the Geographic InIormation System GIS Data used to prepare this map are error Iree and SEH does not represent that the GIS Data can be used Ior navigational tracking or any other purpose reTuiring exacting measurement oI distance or direction or precision in the depiction oI geographic Ieatures The user oI this map acknowledges that SEH shall not be liable Ior any damages which arise out oI the user s access or use oI data provided Pa t h  ;  ? F J ? G ? G E M L . ? 1 8 6 5 3  ? 5 - I i n a l - d s g n ? 5 1 - d r a w i n g s ?  0 - G I S ? G E M L .1 8 6 5 3  B A s s e s s m e n t M a p ? G E M L . 1 8 6 5 3  B A s s e s s m e n t M a p  a p r x 0 300 600 Feet ± Legend Assessment Parcels Proposed Water Main - By Diameter 6" 8" 10" Existing Main Connection to Vadnais Heights water main, Manhole meter location Connection to Vadnais Heights water main, Manhole meter location Assessment Map                                      Willow Lake Boulevard L a b o r e R o a d La b o r e R o a d Montmorency Street Talmage Lane Ju d s o n R o a d En g l i s h St r e e t In t e r n a t i o n a l Dr i v e H a v e n L a n e Ci t y C e n t e r L a n e Te s s i e r R o a d Ta l m a g e Ci r c l e C i ty Center Drive Little F o x L a n e S u m m it FarmLane Big Fox Road Daniels Farm Road County Road E East In t e r s t a t e 3 5 E Goose Lake R o a d Goos e L a k e R o a d ProMect GEML. 53 Figu re 4Water Main ImSrovementsMaS by tschwar] ProMection 1AD 3 HAR1 AdM M1 Ramsey 8S Feet Source Ramsey County City oI Gem Lake SEH Inc Print Date 5 Gem Lake M1 This maS is neither a legally recorded maS nor a survey maS and is not intended to be used as one This maS is a comSilation oI records inIormation and data gathered Irom various sources listed on this maS and is to be used Ior reIerence SurSoses only SEH does not warrant that the GeograShic InIormation System GIS Data used to SreSare this maS are error Iree and SEH does not reSresent that the GIS Data can be used Ior navigational tracking or any other SurSose reTuiring exacting measurement oI distance or direction or Srecision in the deSiction oI geograShic Ieatures The user oI this maS acknowledges that SEH shall not be liable Ior any damages which arise out oI the user s access or use oI data Srovided Pa t h  ;  ? F J ? G ? G E M L . ?    5 3  ? 5  I i n a l  d s g n ? 5   d r a w i n g s ?    G I S ? G E M L .   5 3  B A s s e s s m e n t M a S ? G E M L .    5 3  B A s s e s s m e n t M a S  a S r x 3 Feet ± Legend Assessment Parcels Appendix A Detailed Cost Estimate ENGINEER'S ESTIMATE GEM LAKE, MINNESOTA 2026 Watermain Extension SEH FILE GEMLK 186534 1 2021.501 MOBILIZATION LS $75,000.00 1.00 $75,000.00 0.20 $15,000.00 0.10 $7,500.00 0.55 $41,250.00 0.08 $6,000.00 0.07 $5,250.00 2 2101.502 CLEARING EACH $250.00 30 $7,500.00 4 $1,000.00 2 $500.00 20 $5,000.00 2 $500.00 2 $500.00 3 2101.502 GRUBBING EACH $250.00 30 $7,500.00 4 $1,000.00 2 $500.00 20 $5,000.00 2 $500.00 2 $500.00 4 2101.610 TREE TRIMMING HR $250.00 10 $2,500.00 2 $500.00 1 $250.00 5 $1,250.00 1 $250.00 1 $250.00 5 2104.502 REMOVE WATER MAIN PIPE LF $30.00 20 $600.00 10 $300.00 10 $300.00 6 2104.502 SALVAGE SIGN EACH $50.00 18 $900.00 2 $100.00 2 $100.00 10 $500.00 2 $100.00 2 $100.00 7 2104.503 SALVAGE FENCE LF $15.00 16 $240.00 2 $30.00 10 $150.00 2 $30.00 2 $30.00 8 2104.503 REMOVE CONCRETE PAVEMENT (DRIVEWAY)SY $35.00 44 $1,540.00 11 $385.00 11 $385.00 11 $385.00 11 $385.00 9 2104.504 REMOVE BITUMINOUS PAVEMENT (DRIVEWAY/PATCHING)SY $15.00 185 $2,775.00 45 $675.00 13 $195.00 101 $1,515.00 13 $195.00 13 $195.00 10 2104.603 REMOVE AND REPLACE BITUMINOUS CURB LF $45.00 370 $16,650.00 70 $3,150.00 100 $4,500.00 100 $4,500.00 100 $4,500.00 11 2104.603 EDGE MILL BITUMINOUS SURFACE (2.0")LF $7.00 330 $2,310.00 22 $154.00 44 $308.00 220 $1,540.00 22 $154.00 22 $154.00 12 2105.609 SELECT GRANULAR BORROW MOD 5%TON $30.00 110 $3,300.00 110 $3,300.00 13 2123.610 STREET SWEEPER (WITH PICKUP BROOM)HOUR $200.00 40 $8,000.00 8 $1,600.00 8 $1,600.00 8 $1,600.00 8 $1,600.00 8 $1,600.00 14 2211.509 AGGREGATE BASE CLASS 5 TON $26.00 55 $1,430.00 13 $338.00 4 $104.00 30 $780.00 4 $104.00 4 $104.00 15 2357.506 TYPE SP 9.5 WEARING COURSE MIX (3,C) (PATCHING)TON $200.00 24 $4,800.00 6 $1,200.00 2 $400.00 12 $2,400.00 2 $400.00 2 $400.00 16 2360.509 TYPE SP 9.5 WEARING COURSE MIX (2,C) (DRIVEWAYS)TON $225.00 15 $3,375.00 15 $3,375.00 17 2360.509 TYPE SP 12.5 WEARING COURSE MIX (3,C) (PATCHING)TON $200.00 42 $8,400.00 6 $1,200.00 2 $400.00 30 $6,000.00 2 $400.00 2 $400.00 18 2451.609 PIPE BEDDING TON $35.00 129 $4,515.00 17 $595.00 9 $315.00 69 $2,415.00 17 $595.00 17 $595.00 19 2503.603 6" WATERMAIN DUCTILE IRON PIPE CL 52 LF $80.00 300 $24,000.00 40 $3,200.00 20 $1,600.00 160 $12,800.00 40 $3,200.00 40 $3,200.00 20 2503.603 8" HDPE SDR 11 WATER MAIN HDD (DIPS)LF $90.00 1,350 $121,500.00 730 $65,700.00 620 $55,800.00 21 2503.603 10" HDPE SDR 11 WATER MAIN HDD (DIPS)LF $100.00 1,530 $153,000.00 1,160 $116,000.00 370 $37,000.00 22 2503.603 12" HDPE SDR11 WATER MAIN HDD (DIPS)LF $120.00 3,140 $376,800.00 3,140 $376,800.00 23 2503.608 DUCTILE IRON FITTINGS LB $20.00 1,604 $32,080.00 660 $13,200.00 311 $6,220.00 633 $12,660.00 24 2504.602 6" GATE VALVE AND BOX EACH $3,500.00 10 $35,000.00 1 $3,500.00 1 $3,500.00 4 $14,000.00 2 $7,000.00 2 $7,000.00 25 2504.602 10" GATE VALVE & BOX EACH $4,500.00 3 $13,500.00 2 $9,000.00 1 $4,500.00 26 2504.602 12" GATE VALVE AND BOX EACH $5,500.00 8 $44,000.00 8 $44,000.00 27 2504.602 HYDRANT EACH $7,500.00 8 $60,000.00 1 $7,500.00 1 $7,500.00 4 $30,000.00 1 $7,500.00 1 $7,500.00 28 2504.602 WATER METER AND MANHOLE EACH $45,000.00 2 $90,000.00 1 $45,000.00 1 $45,000.00 29 2504.602 CONNECT TO EXISTING WATERMAIN EACH $1,800.00 2 $3,600.00 1 $1,800.00 1 $1,800.00 30 2504.604 4" POLYSTYRENE INSULATION SY $50.00 95 $4,750.00 20 $1,000.00 5 $250.00 50 $2,500.00 10 $500.00 10 $500.00 31 2531.504 6" CONCRETE DRIVEWAY PAVEMENT SY $110.00 52 $5,720.00 13 $1,430.00 13 $1,430.00 13 $1,430.00 13 $1,430.00 32 2563.601 TRAFFIC CONTROL LS $7,500 1 $7,500.00 0.20 $1,500.00 0.10 $750.00 0.55 $4,125.00 0.08 $600.00 0.07 $525.00 33 2564.502 INSTALL SIGN EACH $325.00 16 $5,200.00 2 $650.00 10 $3,250.00 2 $650.00 2 $650.00 34 2540.602 SALVAGE & INSTALL MAILBOX EACH $500.00 5 $2,500.00 1 $500.00 1 $500.00 1 $500.00 1 $500.00 1 $500.00 35 2573.501 SEDIMENT CONTROL LOG TYPE WOOD FIBER LF $5.00 1,403 $7,015.00 460 $2,300.00 230 $1,150.00 460 $2,300.00 230 $1,150.00 23 $115.00 36 2574.507 COMMON TOPSOIL BORROW (CV)CY $55.00 5 $275.00 1 $55.00 2 $110.00 1 $55.00 1 $55.00 37 2575.523 EROSION CONTROL BLANKET CATEGORY 20 SY $5.00 806 $4,030.00 173 $865.00 115 $575.00 288 $1,440.00 115 $575.00 115 $575.00 38 2575.604 SEEDING (INCLUDES SEED, FERTILIZER & HYDRAULIC MULCH)SY $5.00 1,379 $6,895.00 255 $1,275.00 205 $1,025.00 511 $2,555.00 255 $1,275.00 153 $765.00 39 VADNAIS HEIGHTS WATER MAIN CONNECTION CHARGES (FRONTAGE)LF $66.00 1,980 $130,680.00 1,080 $71,280.00 900 $59,400.00 40 VADNAIS HEIGHTS WATER MAIN CONNECTION CHARGES (AREA)ACRE $265.00 133 $35,245.00 16 $4,240.00 9 $2,385.00 90 $23,850.00 8 $2,120.00 10 $2,650.00 41 VADNAIS HEIGHTS WATER MAIN CONNECTION CHARGES (UNIT)EACH $380.00 37 $14,060.00 5 $1,900.00 2 $760.00 16 $6,080.00 7 $2,660.00 7 $2,660.00 $1,328,685.00 $263,827.00 $133,982.00 $721,360.00 $110,628.00 $98,888.00 $132,868.50 $26,382.70 $13,398.20 $72,136.00 $11,062.80 $9,888.80 $1,461,553.50 $290,209.70 $147,380.20 $793,496.00 $121,690.80 $108,776.80 $365,388.38 $72,552.43 $36,845.05 $198,374.00 $30,422.70 $27,194.20 $1,826,900.00 $362,800.00 $184,200.00 $991,900.00 $152,100.00 $136,000.00TOTAL ESTIMATED COST +10% CONSTRUCTION CONTINGENCIES ESTIMATED CONSTRUCTION COST SUBTOTAL LEGAL, FISCAL, ADMINISTRATION & ENGINEERING (25%) LINE NO.ITEM NO.ITEM DESCRIPTION UNIT UNIT PRICE ESTIMATED QUANTITY ESTIMATED COST TOTAL LITTLE FOX LANE BIG FOX ROAD ESTIMATED QUANTITY ESTIMATED COST ESTIMATED QUANTITY ESTIMATED COST GOOSE LAKE ROAD HAVEN LANE ESTIMATED QUANTITY ESTIMATED COST ESTIMATED QUANTITY ESTIMATED COST TESSIER ROAD ESTIMATED QUANTITY ESTIMATED COST 8/22/2025 10:57 AM 1 of 1 X:\FJ\G\GEMLK\186534\4-prelim-dsgn-rpts\Preliminary Engineers Estimate_NO LABORE Appendix B Preliminary Assessment Roll OVERALL SUMMARY TOTAL ESTIMATED PROJECT COST $1,826,900.00 TOTAL ASSESSABLE HOUSING UNITS 40 $6,000.00 TOTAL AMOUNT ASSESSED $240,000.00 SUMMARY Percent of Total ESTIMATED TOTAL COST OF PROPOSED IMPROVEMENTS $1,826,900.00 TOTAL CITY CONTRIBUTION $1,586,900.00 86.86% TOTAL AMOUNT ASSESSED*$240,000.00 13.14% ASSESSMENT BREAKDOWN Unique ID Address P.I.N. Assessable Housing Units Assessment Rate Proposed Assessment 1 1216 LITTLE FOX LN 283022440002 1 $6,000.00 $6,000.00 2 1180 LITTLE FOX LN 283022440003 1 $6,000.00 $6,000.00 3 1161 LITTLE FOX LN 283022420005 1 $6,000.00 $6,000.00 4 1201 LITTLE FOX LN 283022410005 1 $6,000.00 $6,000.00 5 1231 LITTLE FOX LN 283022410004 1 $6,000.00 $6,000.00 6 3775 BIG FOX RD 283022410003 1 $6,000.00 $6,000.00 7 3800 BIG FOX RD 283022410006 1 $6,000.00 $6,000.00 8 3762 LABORE RD 283022420004 1 $6,000.00 $6,000.00 9 3788 LABORE RD 283022420003 1 $6,000.00 $6,000.00 10 1110 GOOSE LAKE RD 283022130018 1 $6,000.00 $6,000.00 11 1120 GOOSE LAKE RD 283022420006 1 $6,000.00 $6,000.00 12 1130 GOOSE LAKE RD 283022420007 1 $6,000.00 $6,000.00 13 1140 GOOSE LAKE RD 283022130017 1 $6,000.00 $6,000.00 14 1150 GOOSE LAKE RD 283022130016 1 $6,000.00 $6,000.00 15 1270 GOOSE LAKE RD 283022140011 1 $6,000.00 $6,000.00 16 1300 GOOSE LAKE RD 273022320023 1 $6,000.00 $6,000.00 17 1330 GOOSE LAKE RD 273022230003 1 $6,000.00 $6,000.00 18 1101 GOOSE LAKE RD 283022130014 1 $6,000.00 $6,000.00 19 1177 GOOSE LAKE RD 283022130015 1 $6,000.00 $6,000.00 20 1215 GOOSE LAKE RD 283022140014 1 $6,000.00 $6,000.00 21 1219 GOOSE LAKE RD 283022140015 1 $6,000.00 $6,000.00 22 1225 GOOSE LAKE RD 283022140009 1 $6,000.00 $6,000.00 23 3907 TESSIER RD 283022140008 1 $6,000.00 $6,000.00 24 3945 TESSIER RD 283022140007 1 $6,000.00 $6,000.00 25 3955 TESSIER RD 283022140006 1 $6,000.00 $6,000.00 26 3970 TESSIER RD 283022110008 1 $6,000.00 $6,000.00 27 3950 TESSIER RD 283022140005 1 $6,000.00 $6,000.00 28 3930 TESSIER RD 283022140004 1 $6,000.00 $6,000.00 29 3910 TESSIER RD 283022140003 1 $6,000.00 $6,000.00 30 3911 HAVEN LN 283022140002 1 $6,000.00 $6,000.00 31 3931 HAVEN LN 283022110007 1 $6,000.00 $6,000.00 32 3951 HAVEN LN 283022110009 1 $6,000.00 $6,000.00 33 3960 HAVEN LN 283022110010 1 $6,000.00 $6,000.00 34 3950 HAVEN LN 283022110011 1 $6,000.00 $6,000.00 35 3930 HAVEN LN 283022110006 1 $6,000.00 $6,000.00 36 3920 HAVEN LN 283022140001 1 $6,000.00 $6,000.00 37 1315 GOOSE LAKE RD 273022220010 1 $6,000.00 $6,000.00 38 1337 GOOSE LAKE RD 273022220011 1 $6,000.00 $6,000.00 39 1299 GOOSE LAKE RD 273022220009 1 $6,000.00 $6,000.00 40 1341 GOOSE LAKE RD 273022220012 1 $6,000.00 $6,000.00 Total Assessable Housing Units 40 Total Assessment $240,000.00 Note: All dollar amounts except assessement rate are rounded to the nearest cent. 2026 Watermain Extension RESIDENTIAL UNIT METHOD TOTAL ASSESSMENT PER HOUSING UNIT: Gem Lake Trail Policy Purpose The purpose of the Gem Lake Trail policy is to establish consistent guidelines for the use and maintenance of the public trail. The guidelines were established by City Staff and White Bear Township Public Works recommendations. The policy and procedures related to such use and maintenance are contained in the following statement. The City of Gem Lake intends to create an inviting environment for all Gem Lake residents and non-residents that come to use the public trail. The city has a responsibility to maintain the trail as it sees fit to encourage use and maintain public health and safety. Use of the Trail Gem Lake residents and visitors are encouraged to take advantage of the Gem Lake Trail. When enjoying the trail, please keep the following rules in mind: Give Pedestrians the Right-of-Way Those operating bicycles, skateboards, scooters or rollerblades should take caution and alert walkers or joggers as they approach. Faster trail users should pass on the left side. Manage Your Speed Trail users (bikes, roller blades, push scooters) must travel at a safe speed based on the trail environment and presence of other users on the trail while under complete control with the ability to safely stop or slow down when needed. Do Not Use Motorized Vehicles Motorized vehicles - including golf carts, all-terrain vehicles (ATV’s), segways and motorized scooters—are not allowed on city trails. Exceptions are motorized wheelchairs and electric-assist or pedal-assist bicycles (per Minnesota State Statute). Keep Pets on a Leash Gem Lake City Ordinance requires all pets to be leashed whenever off the private property of their owner. In addition, owners are responsible for cleaning up after their pet In addition, please consider these trail etiquette guidelines: In general, keep to the right of the trail and be prepared to yield to other trail users. If you are wearing headphones, keep the volume low enough that you can hear your surroundings and other trail users announcing they are passing. Walkers and joggers should stay to the right of the trail and limit space taken up by larger groups to allow others to pass. Maintenance of the Trail The City of Gem Lake and White Bear Township Public Works oversee maintaining the public trail. To keep the trail clean and enjoyable for all visitors, the following will be implemented: Winter Snow Removal of Gem Lake Trail From November 1 through April 1, winter maintenance will be performed on the Gem Lake Trail. Snow Removal will be done on regular workdays (Monday through Friday) as needed. The standard width for general use in less frequently used parks or trails with limited grooming is 6 feet. White Bear Township Public Works will remove snow from the trail from edge to edge. Markers will be placed along the trail to ensure proper snow removal widths. Summer Mowing of Gem Lake Trail The months of July and September, summer and fall maintenance will be performed on the Gem Lake Trail. Mowing will be done on regular workdays (Monday through Friday). The trail will be mowed out approximately four (4) feet foot from the edge on each side of the trail to remove encroaching vegetation and invasive species. Areas around the signs and benches will also be moved and trimmed at the same time. Invasive Species From time to time, volunteer efforts will be organized to eliminate cottonwood and willow invasive plants in the trail area. These efforts will be approved in advance by the City Clerk or Mayor. Yard waste resulting will be placed in a designated area and hauled away by the public works department. City of White Bear Lake 4701 Highway 61 N. White Bear Lake, Minnesota 55110 651-429-8526 | www.whitebearlake.org August 25, 2025 Barbara Suciu, City Clerk City of Gem Lake 4200 Otter Lake Road Gem Lake, MN 55110 Dear Ms. Suciu, The City of Gem Lake (Gem Lake) has contracted with the City of White Bear Lake (White Bear Lake) for police services for many years. Per the Patrol Services Agreement, White Bear Lake is required to provide Gem Lake with the costs budgeted for the following year and the most recent figures for population. Enclosed you will find 2026 information for Gem Lake. On behalf of the Police Department, I want to thank you for allowing White Bear Lake to continue serving Gem Lake. White Bear Lake values our partnership, and the Police Department takes great pride in providing exceptional service your community. If you have questions regarding this financial information, please feel free to contact me at kkindsvater@whitebearlake.org or 651-429-8517. Sincerely, Kerri Kindsvater Finance Director cc: Lindy Crawford, White Bear Lake City Manager Dale Hager, White Bear Lake Police Chief Encls. Total 2026 Budget Cost Alloction 6,410,964 2024 - 2043 Facility Depreciation (a)646,624 2026 Total Police Contract Costs 7,057,588 Total Met Council Contract Costs Facility Unit of Population as of Allocated by Depreciation 2026 Government July 2025 Population by Population Grand Total Gem Lake 542 139,469 14,067 153,537 White Bear Lake 24,372 6,271,495 632,557 6,904,051 Grand Total 24,914 6,410,964 646,624 7,057,588 WHITE BEAR LAKE POLICE DEPARTMENT 2026 Contracted Jurisdiction Cost Allocations (a) 2024 - 2043 Facility Depreciation Year Life in Depreciation Item Added Cost Years Years Public Safety Facility 2024 12,932,483$ 20 2024-2043 646,624 WHITE BEAR LAKE POLICE DEPARTMENT 2026 Cost Allocation Details City of White Bear Lake 4701 Highway 61 N. White Bear Lake, Minnesota 55110 651-429-8526 | www.whitebearlakemn.gov August 25, 2025 Melissa Lawrence, City Clerk City of Gem Lake 4200 Otter Lake Road Gem Lake, MN 55110 Dear Ms. Lawrence, The City of Gem Lake (Gem Lake) has contracted with the City of White Bear Lake (White Bear Lake) for fire services for many years. Per the 2023-2028 Fire Services Agreement, White Bear Lake is required to provide Gem Lake with the costs budgeted for the following year and the most recent figures for tax capacity valuation and population by September 1 of each year. Enclosed you will find said information in addition to costs for fire inspection services specifically for Gem Lake in 2026. The Fire Department provides a high level of service to the communities we serve. This has been achieved by recruiting and retaining highly skilled personnel as well as continuous improvement, which is ongoing. Services that we provide include fire suppression, rescue, Advanced Life Support (ALS) ambulance service, inspections, investigation and ongoing public education. To support these operations, replacement of vehicles and improvement of facilities is necessary for the health and safety of firefighters. This has been , and will continue to be, done in a fiscally responsible manner. The proposed 2026 Fire budget includes the replacement of a 20-year-old rescue truck, equipment, personnel costs, as well as much needed repairs to the South Fire Station training tower. On behalf of the Fire Department, I want to thank you for allowing White Bear Lake to continue serving Gem Lake. We value our partnership and take great pride in providing exceptional service your community. As always, if you have questions regarding this financial information, please feel free to contact me at kkindsvater@whitebearlakemn.gov or 651-429-8517. Sincerely, Kerri Kindsvater Finance Director cc: Lindy Crawford, White Bear Lake City Manager Greg Peterson, White Bear Lake Fire Chief Encls. 2026 Operating Budget 1,511,014$ 2026 Administrative Costs 99,459 2024 Budget Adjustment - Surplus (Deficit)28,948 Total 2026 Operating Budget Cost Alloction 1,581,526 2026 Building Depreciation (a)18,035 2024 - 2043 Facility Depreciation (b)641,624 2026 Equipment Depreciation (c)345,273 2026 Total Fire Contract Costs 2,586,458 35% of Total 65% of Total Pay 2025 Final Met Council Contract Costs Contract Costs Facility Unit of Tax Capacity Population as of Allocated by Tax Allocated by Depreciation 2026 Government Value July 2025 Capacity Value Population by Population (d)Grand Total Birchwood Village 2,372,771$ 877 20,110$ 29,302$ 14,873$ 64,285$ Dellwood 6,068,435 1,141 51,433 38,123 19,350 108,905 Gem Lake 2,015,971 542 17,086 18,109 9,191 44,387 White Bear Township 24,289,720 10,903 205,866 364,291 184,898 755,055 White Bear Lake 45,566,607 24,372 386,197 814,317 413,312 1,613,826 Grand Total 80,313,504 37,835 680,692 1,264,142 641,624 2,586,458 WHITE BEAR LAKE FIRE DEPARTMENT 2026 Contracting Jurisdiction Cost Allocations (a) 2026 Building Depreciation Life in Depreciation Item Year Cost Years Years Alarm/Key System 2022 29,625$ 5 2022-2026 5,925 Station #920 Roof 2023 155,000 20 2023-2042 7,750 Station #920 Training Tower Tuckpointing 2025 9,200 20 2025-2044 460 Station #920 Exterior Doors 2026 53,000 20 2026-2045 2,650 Station #920 Training Tower Doors, Windows 2026 25,000 20 2026-2045 1,250 Total Depreciation 18,035 (b) 2024 - 2043 Facility Depreciation Life in Depreciation Item Year Cost Years Years Public Safety Facility 2023 12,832,483$ 20 2024-2043 641,624 WHITE BEAR LAKE FIRE DEPARTMENT 2026 Cost Allocation Details WHITE BEAR LAKE FIRE DEPARTMENT 2026 Cost Allocation Details (c) Equipment Depreciation Life in Depreciation Item Year Cost Years Years SCBA equipment 2018 330,000 10 2018-2027 33,000 Fire truck - pumper 2019 512,500 15 2019-2033 34,167 Fire truck - ladder 2020 1,005,000 20 2020-2039 50,250 Vehicle radios 2022 47,100 5 2022-2026 9,420 Radios 2023 20,000 5 2023-2027 4,000 Rescue boat 2023 200,000 10 2023-2032 20,000 Ambulance 2023 228,500 6 2023-2028 38,083 Lucas devices 2023 60,000 10 2023-2032 6,000 Radios 2024 20,000 5 2024-2028 4,000 Fire squad 2024 60,250 5 2024-2028 12,050 Vehicle Laptop computer 2024 5,000 5 2024-2028 1,000 Vehicle equipment 2024 24,000 10 2024-2033 2,400 Ambulance 2024 306,000 6 2024-2029 51,000 Fire squad 2025 66,250 5 2025-2029 13,250 Vehicle Laptop computer 2026 10,000 5 2026-2030 2,000 Vehicle equipment 2026 60,000 10 2026-2035 6,000 Fire truck - rescue 2026 1,173,067 20 2026-2045 58,653 Total Depreciation 345,273 2026 Total Fire Inspector Personnel Costs 181,736 Unit of Distribution 2025 Government Percentage Grand Total Gem Lake 5.00%9,087$ White Bear Township 12.50%22,717$ White Bear Lake 82.50%149,932$ Grand Total 100.00%181,736 WHITE BEAR LAKE FIRE DEPARTMENT 2026 Fire Inspection Cost Allocations CITY OF GEM LAKE Heritage Hall 4200 Otter Lake Road | Gem Lake, MN 55110 651-747-2790/92 | 651-747-2795 (fax) E-mail city@gemlakemn.org September 16, 2025 To: Mayor and City Council From: Tom Kelly, Treasurer RE: Setting the Date and Time of the 2025 Budget Meeting. State Statutes require Cities with a population of 500 or more to hold a public meeting where the budget and property tax levy will be discussed, and public input is allowed. This meeting must occur after November 24th and before December 28th and must start after 6 pm. The budget and levy cannot be approved by City Council until this meeting is held, but can be the same meeting. On or before September 30th, the date, time, location and who to contact with questions must be provided to the County Auditor, who will send out parcel specific notices with the hearing information on them. These notices would be mailed between November 11th and November 24th. Since the only scheduled City Council meeting between November 25th and December 28th is scheduled for December 16th at 7:00 pm it would be my recommendation to hold the hearing on December 16th at 7:00 at Heritage Hall. Tom Kelly Gem Lake City Treasurer CITY OF GEM LAKE Heritage Hall 4200 Otter Lake Road | Gem Lake, MN 55110 651-747-2790/92 | 651-747-2795 (fax) E-mail city@gemlakemn.org City Council Meeting – October 21, 2025 Call to Order of City Council Meeting By Mayor Artig-Swomley at 7:_____ p.m. Call of Roll Artig-Swomley Cacioppo Patrick Johnson Lindner Approve Agenda and Minutes • Accept the Agenda for the October 21, 2025, City Council Meeting • Approve the Minutes of September 16, 2025, City Council Meeting Special Presentations/Public Hearings Consent Agenda • Resolution #2025-027; Resolution Authorizing the City Treasurer to Distribute a Portion of the Charitable Gambling Funds to the White Bear Lake Area Food Shelf • Monthly Financial Report(s) • Claims Committee Reports • Planning Commission Old Business • Newsletter Updates / Topics / Suggestions New Business • Future Charitable Gambling Donations o White Bear Lake Emergency Food Shelf Community Outreach to Other Cities and Government Bodies Presentations from the Public, 2 minutes maximum Open Items for Council Members to Bring Up Future Council Meetings • Next City Council Meeting, Tuesday, November 18, 2025 o Attendance Inquiry • Next City Council Workshop, Monday, November 10, 2025 Adjournment – The meeting adjourned at ________