HomeMy WebLinkAboutFebruary 2011 Gem Lake Newsletter
February, 2011
Volume 5, Issue 2 Gem Lake News
Special Interest
Articles:
• Hillary Farm
Request Denied
• 2010
Accomplishments
• City News-Page 4
Upcoming Recycling
Dates:
February 23
March 9
March 23
April 6
Gretchen Artig-Swomley, Newsletter Editor
A recent request to allow for re-platting of
the Hilary Farm Housing Development in
Gem Lake did not make through the
required steps in order to be approved.
In December, a request was submitted on
behalf of Hillary Farms LLC to add an
additional 8 homes on a 28 acre section of
the development that is generally along its
northeastern side. Each of the new homes
in this section would have had an average
lot size of 1.47 acres, down from the 3 acre
average of the original plat.
The request was reviewed by the Gem
Lake Planning Commission on January 4,
when the plan was also the subject of a
(continued on page 2)
Hilary Farm Re-Platting Request Denied
Mayor Uzpen Reflects on 2010 Accomplishments
According to a recent report by Gem Lake
Mayor Bob Uzpen, 2010 was a very successful
year for the city.
"The city stayed within its expense budget and
was able to save a small amount to carry over
into 2011."
In addition, the following is a list of some of the
city's accomplishments from last year:
*The accounting firm of Larson Allen audited
the financial condition of the city. The report
showed that Gem Lake is in a strong financial
position, with adequate resources.
*The city receives a small percentage of pull tab
income, which it used for charitable donations,
as well as betterment for citizens within the city.
This past year, the city donated to the White
Bear Lake Emergency Food Shelf, the Union
(continued on page 3)
Jessie Hart, Gem Lake
Treasurer
Mayor Bob Uzpen
Gem Lake News Page 2 of 6
Hilary Farm Re-platting Request Denied
(continued from page 1)
Because an amendment to the
comprehensive plan was a requirement for
the sub-division request to go further, Jim
McNulty elected to withdraw the plan at
this point.
public hearing. The plan received initial
approval by the commission, despite wide
spread opposition to it on the part of
members of the public who attended this
meeting.
According to Hilary Farm LLC, the new
concept was intended to increase the
number of lots, in order to jump-start sales.
The new configuration would allow for
some less expensive options within the
development. Since 2005, four homes
have been built by McNulty Homes. In
addition, the large lot containing the
original Bemis family home has been
purchased and a remodeling project is
underway. In 2009, one lot was sold but
the construction of a home is on hold, for
the time being.
Hillary Farm LLC requested that the lots in
this 28 acre part of the development be
changed from their current R-1 zoning to
R-3 zoning, which requires a minimum lot
size of 36,000 feet and set backs of 35
feet on the front of the lot and 25 feet on
the back of the lot.
Hilary Farm LLC had asked for three
separate actions in order to re-plat the
development. One was to ask for a Gem
Lake Comprehensive Plan amendment to
allow for the change. This would have
amended the 1998 city plan on file with the
Metro Council. Hilary Farm had initial
approval for the development in 2004.
The second action requested was for a
Conditional Use Permit (CUP) to allow for
greater density, in exchange for more
open space. The third action requested
was for the approval of a new Major
Subdivision, which was to be called Hilary
Farm Meadows.
After careful evaluation of the plans by
White Bear Township staff and various
engineering experts, several questions
and concerns were addressed in
preparation for a city council meeting,
which was held on January 18.
During this meeting, city council
members heard a presentation by
McNulty Homes regarding the
proposed sub-division. Various
members of the public provided their
feedback and expressed their
concerns.
The council then took up the first
request, which was to amend the city's
comprehensive plan. Each member of
the council, as well as the mayor, voted
negative on this request, citing specific
portions of the comprehensive plan that
each felt were in conflict with the
further sub-division of Hillary Farm.
Gem Lake NewsPage 3 of 6
Gospel Mission, and provided a $500
scholarship to Gem Lake resident Jamie
Nadeau for post secondary education.
*Certain parts of the city have municipal
sewers. The Hoffman Corner sewer
required major repairs. The City Council
created a schedule for televising and
"flushing" the sewers on a regular basis,
so we can all stay on top of the sewer
maintenance situation.
*The city performed repairs on the ravine
off the Scheuneman Road Business
District and the culvert on Tessier Road.
*Gem Lake offered free well testing
services to residents so they could test their
water for bacteria. Seventeen households
took advantage of the program.
*Tree trimming was performed after the
first big snowstorm in November, during
which numerous trees and limbs were
damaged, due to the weight of the snow.
*The City Council updated the Gambling,
Alcohol and Tobacco Ordinances to
reflect current standards for these
regulations in surrounding cities.
*The Ramsey County Sheriff's Department
worked with the seven contract cities,
including Gem Lake, to create an
Administrative Citation Ordinance. This
ordinance provides for faster processing of
citations for the Sheriff's Department and
potentially more fee income for the City of
Gem Lake.
Mayor Uzpen Reflects on 2010 Accomplishments (continued from pg. 1)
*There are areas of the city that are
considered to be in a flood plain. In order for
current and future residents of Gem Lake to
be able to obtain flood insurance, the city
must have an Flood Plain Ordinance in
place. This year the council drafted and
approved such an ordinance.
*Over the past two years, city hall has
received complaints that dealt with
unauthorized hunters on private land, gun
shots being fired, (which is not allowed
anywhere in the seven county metro area)
and deer running with arrows in them on
private land with no hunters in sight.
After speaking to the Sheriff's Department, it
became clear that the lack of regulation on
this subject left law enforcement with no
definite rule to enforce. With that in mind,
the council began drafting a safety
ordinance. After several meetings and a
public hearing, the ordinance was approved.
In a nut shell, this ordinance helps to
eliminate the possibility of unwanted hunters
randomly walking through the city, prohibits
gunfire within city limits and puts control of
deer hunting with the city council.
"Each of these accomplishments required
hard work on the part of the council and
feedback from our residents. I look forward
to working with everyone in the year ahead,"
said Uzpen. "The City Council believes that
2011 will also be a challenging year. We
prepared the 2011 budget and projects with
the goals of maintaining infrastructure and
positioning ourselves for the future."
Gem Lake News Page 4 of 6
City News Page
Rain Garden Seminar Scheduled for March
How and why to build a rain garden on your
property will be the subject of a special seminar
on March 30. Sponsored by the Vadnais Lake
Area Water Management Organization
(VLAWMO), the seminar will be held from 6:30 to
8:30 p.m. at the Vadnais Heights Fire Station at
800 East County Road E.
The workshop will cover the basics of rain
garden construction and their positive impact on
rainwater run-off. The $10 registration fee
includes a free copy of the "Blue Thumb Guide
to Rain Gardens." Participants will also receive
up to 2 hours of consulting time from instructor
and rain garden expert Kristine Jenson to help
with individual rain garden construction projects.
For more information, please contact Ms. Jensen
at 651-204-6074.
Utility Work Rescheduled for March
The burial of utility lines by xCel Energy on Big
Fox Road has been re-scheduled for March or
April. The project was initiated due partly to
interruptions in service in the area that have
occurred during past years.
Gem Lake Scholarship Program
High school seniors, take note: Gem Lake will
award its second annual scholarship to one Gem
Lake high school senior. The award provides for
$500 for post secondary education. If you are
interested, consultant your guidance counselor
for more information. Last year's winning
applicant was Jamie Nadeau. The program is
funded by charitable gambling proceeds.
Storm Water Retrofit Assessment Completed
for Gem Lake
A report on storm water runoff in the city was
recently completed by the Ramsey Conservation
District for the Vadnais Lake Area Watershed
Management Organization (VLAWMO). The
report was recently presented to the City Council
for initial review. In most sections of the City of
Gem Lake, storm water is properly running off,
bringing a minimum of pollutants into the water
body of Gem Lake.
However, the report did highlight that one area
of the city's business section has certain
topographical features that do not allow for
optimal runoff.
This part of town is contributing more than an
average amount of pollution to the lake. The
report suggests various options to retrofit the
area so that storm water gets absorbed where it
falls and less pollution reaches the lake.
The report will be discussed in more detail at the
City Council Workshop at 7:00 p.m. on March
14.
Planning Commission Seeking Chairman
The position of chairman for the Gem Lake
Planning Commission is open due to the recent
resignation of former Chairman Craig Rafferty.
"We are enormously grateful for all the time and
energy Craig put into his duties as chairman,"
said Mayor Bob Uzpen. "Anyone who is
interested in being a candidate for this position
should contact me as soon as possible."
The planning commission meets monthly and
deals with long-term planning and zoning issues
for the city.
Goals for 2011 on the Agenda for March 14
Workshop
Annual goals for the city will be topic of the
March City Council Workshop, which is
scheduled for 7:00 p.m. on March 14. Members
of the public are encouraged to attend and
provide their input on potential goals in the
areas of planning and development, ordinances,
infrastructure, capital improvements, etc.
.
Gem Lake NewsPage 5 of 6
Emergency Management in Gem Lake by Jim Lindner
Natural disasters are frequently in the news.
From fires and floods in Australia to nor’easters
dumping snow measured in feet instead of
inches, it seems all one has to do to see how
disasters impact everyday life is turn on the
evening news.
But there are other potential disasters as well,
some of which could affect Gem Lake. A
pipeline could burst or a railcar transporting
chemicals derail, and while the likelihood of
such a national security event is quite remote,
leaving outcomes to chance is not sound policy.
The television news reminds us that incidents do
occur, and the better the responding agencies
are prepared, the more likely the end result will
be less traumatic for those involved.
Gem Lake has decided to follow Ramsey
County’s Emergency Operations Plan rather
than create a plan of its own. Gem Lake has
identified Heritage Hall as its emergency
operations center.
Should an event occur, such as a major tornado,
Gem Lake's designated emergency coordinator
has the authority to open Heritage Hall then
contact Ramsey County’s emergency duty
officer. Local authorities such as the sheriff
and/or fire chief may then aid in such activities
as crowd and traffic control, evacuations, or
provide any other needed service to the
impacted areas. Heritage Hall would serve as a
base of operations.
While none of us want to ever be part of an
emergency event, it is reassuring to know that
there are plans and procedures in place that will
help mitigate the situation and allow events to
run their course. Lessons are learned from
each new incident and these are then assessed
and, when warranted, incorporated into
emergency management plans on the local,
state, and federal levels.
Jim Lindner is the designated emergency
coordinator for the City of Gem Lake.
March/April Meetings
The following Gem Lake
Meetings will be held at
Heritage Hall through
March and April of 2011.
April 19, 2011 The City of Gem Lake April 4, 2011
City Council Meeting at
7:00 p.m. City Council Workshop at
7:00 p.m.
PHONE: (651) 747-2790
FAX: (651) 747-2795 City Hall Address: April 5, 2011 March 14, 2011 4200 Otter Lake Road
Gem Lake, MN 55110 Planning Commission
Meeting at 7:00 p.m.
City Council Workshop at
7:00 p.m. GENERAL E-MAIL: March 15, 2011 City@gemlakemn.org
Bob Uzpen-Mayor
Phone: 651-492-5083
City Council Members:
Gretchen Artig-Swomley
Phone: 651-260-9742
Rick Bosak
651-426-9695
Jim Lindner
Phone: 651-429-7597
City Council Meeting at
7:00 p.m.
Your Gem Lake City Council
Newsletter e-mail:
gretchenas@comcast.net
To report incidents for the
Neighborhood Watch program
or for information on that
program contact Block Captain
Chuck Watson
Tom Rasmussen
Phone: 651-426-8854
651-653-8319;
Charles.Watson@bdk.com
We’re on the Web!
See us at:
www.gemlakemn.org
CITY OF GEM LAKE
4200 Otter Lake Road
Gem Lake, MN
55110
For more information on
meetings, city ordinances,
recent events, permit
procedures, etc. please
consult the Gem Lake
web-site. The address is
www.gemlakemn.org
Each Gem Lake
Newsletter is also posted
on the web-site under the
news section.
Please email your ideas,
comments and
suggestions. See box at
left for detailed contact
information.