HomeMy WebLinkAbout2025-044
CITY OF GEM LAKE, MINNESOTA
RESOLUTION NO. 2025-044
APPROVING A ZONING COMPLIANCE PERMIT FOR 0 SCHEUNEMAN ROAD,
PID 273022430029
WHEREAS, Land and Resource Consulting on behalf of, Martz Enterprises, LLC, the
owner of the parcel, made an application to request a zoning compliance permit to allow for a
redevelopment project located at the property listed above; and
WHEREAS, the Planning Commission reviewed the request at a duly noticed public
hearing on December 2, 2025, and a duly noticed meeting on December 16, 2025, and
determined that the proposed request meets the criteria approval, and voted to recommend
approval of the request with conditions; and
NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL
OF GEM LAKE, RAMSEY COUNTY, MINNESOTA, that it should and hereby does direct
staff to approve and issue a zoning compliance permit to allow for a redevelopment project
located at the property addressed as 0 Scheuneman Road.
FURTHER BE IT RESOLVED that the following conditions of approval shall be met:
1. The applicant shall construct the proposed building and sales lot as per the plans submitted to
the City on 11/10/2025 and reviewed with this application.
a. The applicant shall revise their plans to address comments from the City Engineer
dated 11/24/25, and comments from the Fire Department, Building Inspector and
BNSF Railroad.
2. The applicant may construct the proposed building shown on the site plan, with said building
meeting the requirements of Building Type Template 15b.
3. The applicant must adhere to the requirements of Section 18. Performance Standards,
Subdivision 8 – Lighting and Glare; 5. Lighting for outdoor storage areas; if lighting is
provided, then it shall comply with the following limitations:
a. Maximum maintained lighting level at any point within the area, measured thirty-six
(36") inches above grade, shall not exceed fifteen (15) foot-candles.
b. Maximum maintained vertical illumination, measured five (5') feet out from the
property line with the meter directed toward the area in question, shall be two (2)
foot-candles.
c. Maximum point brightness, measured with a brightness meter from a point five (5')
feet out from the property line, shall be no greater than three-hundred (300) foot
Lamberts
4. The applicant shall adhere to all applicable local, State, or Federal regulations.
Resolution No.: 2025-044
Page 2 of 2
5. The applicant shall acquire any other applicable local, State, or Federal permits for this
request.
6. The applicant shall pay all fees and escrows associated with this request.
Adopted by the City Council of Gem Lake, Ramsey County, Minnesota, on this 16th day of
December 2025.
Gretchen Artig-Swomley Barbara Suciu
Gretchen Artig-Swomley, Mayor Barbara Suciu, City Clerk