HomeMy WebLinkAbout1994 07-18 CCPCITY OF GEM LAKE
CITY COUNCIL AGENDA
X8. a'ULY 1994
CALL TO ORDER: Mayor Emeott at p.
ATTENDANCE: Emeott. Birkebak McPhillips Igo
_Nielsen _Nordstrom _Magnuson _Gardner
OTHERS IN ATTENDANCE:
APPROVAL OF MINUTES FOR: June, 1994 Council Meeting
PRESENTATIONS FROM FLOOR:
COMMITTEE REPORTS
PLANNING COMMISSION: Gardner
1) MEETING MINUTES
2) PERMITS & VARIANCES
3) OFFMN ROAD FILLING
:3.) TOUSLEY FORD DEVELOPMENT: Magnuson
a) Tousley Joint Powers Agreement with Vadnais Heights for water
supply.
4) VADNAIS HEIGHTS DEVELOPMENT OF COUNTY E
a) Roberts Property./Vadnais Heights Meeting
b) Fontana Development/Target Store
i) Recommendation for Council Resolution To VH.oppos.ing..
5) I-35E CORRIDOR STUDY COMMITTEE: Lloyd Nielsen
a) Status Report
RECYCLING COMMITTEE: Nielsen
1) June. Recycling Report: Attached.
OLD BUSINESS.:
LAW ENFORCEMENT: Magnuson
1) CONTRACT AMENDMENT -INSURANCE: Magnuson
PROSECUTION MATTERS:
FIRE & PARAMEDIC:
FIRE INSPECTIONS: Magnuson
1) FUTURE FUNDING
a) ordinance Requirements
b) Fee Schedule
TRAFFIC MANAGEMENT: Magnuson
STREET MAINTENANCE. Magnuson
1) Road repair Estimate (T.A. Schif.sky)
21 Road Maintenance Plan (T.A. Schif.sky)
CITY ENGINEER: Emeott
1) Engineers review for sealing/top coating.
SEPTIC SYSTEMS: Emeott
1) SEPTIC INSPECTIONS.: Magnuson
a) Date Base status:.
b) Inspection status.
SEWER: Emeott
SIGN INSPECTIONS: Emeott
CITY WATER: Magnuson'
RAMSEY COUNTY CONSOLIDATION EFFORTS: Emeott/Magnuson
1) COUNTY ROAD TURNBACKS
a) County Road "F": Realignment
i) Property Acquisition/Distribution
b) Road Closures,
i) Scheuneman Road (north of Hwy 61)
ii) Hoffman:Road. (south intersection with Hwy :.61)
OTHER OLD BUSINESS:
1
CITY COUNCIL AGENDA
18 JULY 1994
NEW BUSINESS
RAMSEY COUNTY PROPERTY TAXATION: Magnuson
1) PROPERTY VALUATION REPORT
CITY INSPECTION: Emeott; Gardner;. Arend
OTHER NEW BUSINESS.:
TREASURER'S REPORT:
JULY ACCOUNT BALANCES':
GENERAL FUND: $
PARKS & PLAYGROUND FUND
ENGINEERING FUND: $
SEWER FUND: $
PAYMENT OF BILLS: $
NEXT MEETING: Magnuson
The August Meeting of the Gem Lake 'City: Council will be held on 1.5 August 19'94
at 7a.0 pm.
ADJOURNMENT: Emectt at p.m.
NOTES:
2
CITY OF GEM LAKE
1369 County Road "E" East
TELEPHONE: (612) 426-6443
Paul :l R. E,neott, Mayor
Frederic Magnuson, City Clerk
Gem Lake, MN 55110-5231
FACSIMILE: (612) 426-6444
Richard Nordstrom, Treasurer
Mr. & Mrs. Ronald Docken
4140 Otter Lake Road
Gem Lake, MN 55110
RE: VARIANCE NO. 9401
VARIANCE FROM GEM LAKE ZONING ORDINANCE NO. 43
Dear . Mr. & Mrs. Docken;
21 June 1994'
Pursuant to the recommendation of the Gem lake Planning Commission dated 13 June 1994 and theapproval of the
Gem Lake City Council attheir regular meeting on 20June 1994, you are hereby granted a variancefrom Gem. Lake Zoning
Ordinance No. 43 as follows, -
'VARIANCE: A variance: from Section 10.5, paragraph.I of six (6'0'9feet reducing the side set -hack of
fifleen.(15'0' to nine (9'0') for construction of a south facing attached double garage to be not closer than
nine. (9'0'2 of theside properly line.
Said construction shall he subject to allother conditions of the Zoning Ordinance and Building Codes and may commence
upon issuance of appropriate building permits.
If' you have additional questions, please contact Mr. Jima Arend, Gem Lake Building Inspector at 731-4313.
Regards,
CITY OF GEM LAKE
Frederic C. Magnuson •
City Clerk
cc: J. Arend; Building Inspector
D. Gardner., Planning Commission
CITY OF GEM LAKE
1369 County Road "E" East
TELEPHONE:. (612) 426-6443
Paul R. Enteott, Mayor
Frederic Magnuson, City Clerk
Gent Lake, MN 55110-5231
FACSIMILE: (612) 426-6444
Richard Nordstrom, Treasurer
Mr. & Mrs. Joseph Franz,.
4020 Scheuneman Road
Gem Lake, MN 55110
RE: VARIANCE NO. 9402, GEM LAKE ZONING ORDINANCE NO. 43
SPECIAL USE PERMIT NO. 9401
Dear Mr. & Mrs. Franz,
21 June 1994
Pursuant: to. the recommendation. of the Germ lake Planning Commission dated 13 June 1994 and the approval of the
Gem Lake City Council at their regular ineeting on 20 June .1994; you are hereby granted. a: variance f •arit •Gera Lake Zoning
Ordinance Na 43 as follows:
VARIANCE: A variance froth Section 4.5 paragraph 5 of the Gem. Lake Zoning Ordinance which defines
the maximum allowable square footage for an out building,said variance allowing for construction of a
twenty-four (24'0") by thirty-two (32'0'2 additionto existing detachedgat-agewith totalsquare footage not
to :exceed sixteen -hundred sixty:four (1,664 sf) square feet,
Said construction shall he .subject toall other conditions of the Zoning Ordinance and Building Codes and may
commence upon issuance of appropriate building permits.
If you haveadditional questions, please contact M. Jinn Arendd, Gem. Lake Building Inspector .at 731-4313.
Regards,
CITY OF GEM LAKE
Frederic C. Magnuson
City Clerk
cc: J. Arend, Building Inspector
D. Gardner, Planning Commission
CITY OF GEM LAKE
1369 County Road "E" East
TELEPHONE: (612) 426-6443
Frederic Magnuson, City Clerk
�■�nr
Paul R. Emeon, Mayor
Gem Lake, MN 55110-5231
FACSIMILE: (612) 426-.64.94
Richard Nordstrom, Treasurer.
Mr. .& Mrs. Arthur- Birkeland
3542 Hoff nan Road
Gent. Lake, MN 55110
RE: Filling: Of Land .At 3542 Hoffman. Road
Permit File #SL1SE9402. DOC
Dear Mr. & Mrs: Birkeland,
21 June 1994
Pursuant to action taken by the Gem Lake City Council at it's regular meeting on 20 June 1994 relative to your
Application .For Consideration Of Zoning Request to allow deposit ofan unspecified quantity of clean f ll; be advised as
follows:
CONSIDERATIONS
1) Filling commenced as early as September, 1993 without issuance of appropriate permits from the City of Gem Lake
thus violating Sections 4.10(1), 5.6(1-3), and 5,8(1-2). of Gem Lake Zoning Ordinance No• 43.
2) Fill used was extracted, from areas unknown without issuance; of any statement of their origin and content including,
but not limited to, potential unknown contaminants which may representa danger to long-term public health.
3) The amount of said unspecified fill has not been stated.
ACTION REQUIRED
4) All filling of your property and site workrelated thereto. as identified on your above referencedapplication
shall cease immediately.
Correspondence from the legal jurisdictions) (cg city, town, etc.). from which the materials used for flliizg
were taken stating: contents of the materials and listing any and all potential contaminants to thesatisfactlon of the
Geis: Lake Planning Cornniission. and City Council
Correspondence from the contractor who removed the materials used for,flling from the point(s) of origin
stating the origin(s) of the materials, namingthe carrier(s) who removed .said materials fromthe point(s) of origin,.
stating that only materials identified in 5) above wery delivered by the carrier(s), and stating the quantity of
materials removed from each .of the points) of origin.
7) Correspondence front the carrier stating the date of frst delivery to your she and the total quantity of
materials delivered toyour siiefrorn each of the point(s) of origin of said materials.
By means of action taken by the City Council, you are hereby r'equir'ed to comply with items 4) through 7) above:
Item 4) is effective. immediately Items 5) through 7) areto be delivered to the Zoning Administrator or the chairman of the
Gem Lake Planning Commission as soon as possible. Upon receipt, the Planning Commission will review saidrepreser?lations
and, f found to be satisfactory, will follow the course of action as described in Ordinance. No. 43 for issuance of a.SPecial
Use Permit. As significantquantities of f ll have already been delivered tothe site, the Planning Cornmission`andlor the City
Council may at their sole discretion in consideration of public health and ,safety and asa condition of approval, require
additional verification offal content such as soil boring and analysis by an accredited testing laboratory or other similar action.
21 June 1994
Mr. & Mrs: Arthur Birkeland
Permit File MUSE9402.DOC
When considering final recommendations related to your Application, the. Planning Coininission and the City Council
will determine what, if any, additional requirements it may require as wellas what penalties: as provided for in Section5.9(1)
of Ordinance No..43 may beappropriate as a result of the violation of the Ordinance. If you haveany questions, they .should
be directed to Mr. David Gardner, Chairman, Gem .Lake Planning Commission or Mr. Jim Arend, Gem Lake Zoning
Administrator.
On Behalf. Of
CITY OF GEM LAKE
Frederic C. Magnuson
City Clerk
cc.' J. Arend,Zoning Administrator
D. Gardner, Planning Commission
City Council
2
CITY OF GEM LAKE
1369 County Road "E" East
TELEPHONE: (612) 426-6.443
Paul R. Etneoft, Mayor
Frederic Magnuson, City. Clerk
Gem Luke, MN 551.19-523.1
FACSIMILE: (612) 426-6444
Richard :Nordstrom, Treasurer
Mr, Vince Johnson
7716 Major Avenue North
Brooklyn Park; MN 55443
RE: Filling Qf Land At 3524 Hoffman Road
Permit File 4SUSE9404,11OC
Dear Mr, Johnson,
21 June 1994
Pursuant to action taken by the Gem Lake City Council at it's regular meeting on 20 June. 1994 relative to your
Application For Consideration Of Zoning Request to allow deposit of an unspecified quantity of clean ./711, be advised as
follows:
CONSIDERATIONS
1) Filling commenced as early as September, 1993 without issuance of appropriate permits.from the City of Gem Lake
thus violating: Sections 4,10(1), 5.6(1-3)., and 5.8(1-2) of Gem Lake Zoning Ordinance No. 43..
2) Fill used was extracted font areas unknown without issuance of any statement of their origin and content including,
but not limited to, potential unknown contaminants which may represent a danger to long-term public health.
3) Theamount of said unspecified fill has not been stated.
ACTION REQUIRED
4) All filling .ofyour :properly and site work related thereto as identified on your above referenced application
shall cease iniinediately.
5j Correspondence from the legal jurisdictions) (eg city, town, etc) from which the materials used for filling
were taken stating contents of the materialsand listing any and all potential contaminants to the .satisfaction of the
Gem Lake Planning Commission and City Council
6} Correspondence fi•am the contractor who removed the materials used for filling frontthe point(s) of origin
statingthe origins) of the materials; namingthe carriers) whoremoved said materials fromthe point(s) of origin,
stating then only materialsidentified in 5) above weredelivered by the .carrter(s), andstating the quantity of
materials removed from each of :the point(s) of origin.
7) Correspondence from the carrier stating the date of first delivery to your site and the total quantity of
materials delivered to your site from each of the point(s) of origin of .said materials.
By means: of action taken by the City Council, you are hereby required to comply with items 4) through 7) above.
Item 4) is effective.. immediately. Items 5) through 7) are to be delivered to the Zoning Administrator or the chairman of the
Gem Lake Planning Commission as soon as possible Upon receipt, the Planning Commission will review said representations
and,if found to be satisfactory, will followthe course of action as described to ordinance No, 43 for issuance of a Special
Use Permit. As significant quantities of fill have alreadybeen delivered to the site, the Planning Commission and/or the City
Council may at their sole discretion in consideration of public health and safely and as a .condition of approval,require
additional verification offal content such as soil boring and analysis by an accredited testing: laboratoryor other similar action.
1
21 June 1994
Mr. Vince Johnson
Permit File #5USE9404.DGC
When consideringfinalreeoinmendations related .to yourApplication, the Planning Commission and the City Council
will determine what, if. any, additional requirements itmay require as well as whatpenalties as provided far .in Section 59(1)
of.Ordinance No. 43 may he appropriate as a result of the vialation:of the Ordinance: .If youhave any.. questions; they should
be directed to Mr. David Gardner; Chairman; Gem Lake Planning Commission or Mr. ,Iinz Arend, Gem Lake Zoning.
Administrator.
On Behalf Of
CITY OF GEM LAKE
Frederic 'C. Magnuson.
City Clerk
cc.. .I.; Arend, Zoning Administrator
.D. Gardner;: Planning Commission
City Council
JUL- 1-94 FRI 15:32 E S E C 0
FAX MESSAGE
1+612+560+0i 09 P.01
ESECO-Electric Sales Enterprises Co
P.O. BOX 29224 MINNEAPOLIS, MN 55429
PKo Ti6121_560-2778 FAX 1-612-560-0709
PAGE } OF ICI PAGES FiKOMM :....,YUU'.GE JOHNSON
TO: Fred9rie Magnuson _ BATE July 1, 1994
COMPANY: City QS Gem La]s.e REFERENCE: Pormit File #SUSE9404.DOC
MESSAGE:
In reference -to filling of land at , 574 Hoffman _Rod and the
attached actions of the city council at their previous meeting, I
respectfully request a copy of the nuinutee of the meeting of June
20, 1994 in which the attached actions were forwarded to me as per
Pages II and III. Page IV is a response from the Cbntractural
people that have been responsible for the fill confi€ureation.
My conversations with Bob Noble indicated that a permit would be
ld that thectcld in units of 400 yards or more. I have beer. �•
property we have will take 400 yards or less. This is the
parameters of "why" there was no permit. Eecauee of the "traffic"
thru the rotertYwith
in fill
fact you will indicate
find th t only ar�truck load
mini alamount
for our P p
is actually deposited on our property.
Your�:prOmpt reply to this request would be appreciated,
1(./
" VINCENT K. LIMN , Personal Repreeefntative
7716 Major Ave. o.
Brooklyn Park, MN 55443
JUL- 1-94 PR I 1 c: 34 E S E C 0
1+612+560+0703 F'.04
CC•I447ItsAcir'aFt
June 24, 1994
TO Ray Wlaschin
RLW Trucking
9627 West 122nd St.
Hugo, MN 55O38-,12Q
Landfill Material
Deaf' Mr. Wla►schin,
I understand there has been some concern regarding possible contamination of off haul
material being transported by RLW Tnicking, AU of the materials being excavated by KENKO,
Inc. (and transported by RLW Tr icki g) is being removed front streets in the city of Saint Paul in
eoruiec:tion with the Grand/St, Albanz Sturm Sewer Separation Poiizet. None of iliv streets being
removed are anywhere near gasoline stations or other possible «cturees of contamination.
To date, neither myself nor any other itilr?O, Inc. employee has noied any possible
rontanntation of the material being hauled oli site. I laiardoto material is usually identifiable as
having strong odors and/or visual film or "rainbow" effects. None of the material excavated has
shown these characteristics. Also, during the denim phase of this project, extensive research was
done on subsurface conditions by dziltins test holes throughout the project. The drillers did not
note the presence of any contam.in;.uita, which they are required to report.
i have seen no evidence of any contaminated material being excavated or removed from
this project. Also, I have not seen any dueurnentatiun of possible contamination which would
warrant further investigation or testing. If you n.cd any atfditional infi rrnat'ion regarding this
matter, please contact me al 222-5896.
Suwet cl
John Zvh
Project E - aer
KENKO, Inc.
CORPORATE OFFICE - 1694 - 91st Avenue N.E - Nis Minnesota 554-19 - (612) 786-6510 - Fax (612) 7$6-660
SOUT1iWESTERN DIVISION - 16415 Addison Road, Suite 308 - ❑ana% Texas 75248 - (214) 931-9494 - Fax (214) 931-5474
WESTERN DIVJSION - Post Office Box 831 - Calimesa, CAUifarnia 9232o - (714) 795-2568 - Fax (714) 795-1840 T _
CITY OF GEM LAKE
1369 .County Road "E" East.
TELEPHONE: (612) 426-6443
Paul .R..Enieott, . Mayor
Frederic Magnuson, City Clerk
Gent Lake, MN 55110-5231
FACSIMILE: (612) 426-6444
Richard Nordstrom, Treasurer
Mr. R. M Hansen
2720 North Dale Street, Apt. 4214
Roseville, MN 55113
RE: Filling Of Land At 3538 Hoffman Road
Permit File #SUSE9401DOC
Dear Air. Hansen,
27 June 1994
Pursuant to action taken by the Gem Lake City Council at it's regular meeting on 20 June 1994 relative to your
Application For Consideration .Of Zoning Request to.. allow.. deposit of an unspecified quantity of clean fill, be advised as
follows-
CONSIDER1ITIONS
1) Filling commenced asearly as September, 1993 without issuance of appropriate permits from the City of Gem Lake
thus violating Sections 4.10(1), 5.6(1-3), and 5.8(1-2) of Gem Lake Zoning Ordinance No. 43.
2) Fill .used was exlracted, f -ono areas unknown without issuance of any statement of their- origin and content including
but not limited to, potential unknown contaminants.wvhich niayrepresent a clanger to long-term public health,
3) The amount of said unspecified fill hasnot been stated
ACTION REQUIRED
4) All filling of your property and site work related thereto as identified on your above referenced application.
shall: cease immediately.
Correspondence from the legal jurisdiction(S) (eg city, town, etc)from which the materials used for filling
were: taken: stating. contents of the materials and listing anyand all potential. containinants to the.satisfaction of the
Get): Lake Planning Coniniission and City Council
6} Correspondence from the contractor who, removed the materials rued for filling from the point(s) of origin
stating the origin(s} of the materials, namingthe carrier(s) who removed said materials f -om the point(s) of origin,
slating that only materials identified in 5) above were delivered by the carrier(s), and stating the quantity of
materials removed from each of the point()) of origin.
7) Correspondence f-om the carrierstating the date of first deliveiy to your site and the total quantity of
materials delivered to your site from each of the point(s) of origin of said materials.
By meansof aclion taken by the City Council you are hereby required to comply with items 4) through 7) above.
Item 4) is effective immediately. Items 5) through 7) are to be delivered to the Zoning Administrator or the chairman of the
Gem Lake Planning Commission as soon as possible. Upon receipt, the Planning Commission will review said representations
and if foundto be satisfactory, will follow the course of action as described in ordinance .No. 43 for issuance of a Special
Use Permit. As signrfcant.quantities of fill have already been deliveredto the site, the Planning Commission andlor the City
Council may at their sole discretion in consideration of public health and safety and as a condition of approval; require
additional verification:offihl content such as soil boring and analys is by an accredited testing laboratory or other similar action.
21 June 1994
Mr. R. M. Hansen
Permit File #SUSE9403.DOC
When consider-ingftnal recommendations related toyour Application, the Planning Commission and the City Council
will determine what, • flatly, additional requirements .it may require as well as what penalties as provided. for in Section 5,9(1)
of `Ordinance No, 43 may beappropriate as a result ❑f the violation of the Ordinance, If you have any questions.: they should
be directed to Mr. David Gardner; Chairman, Gem Lake Planning Commission or Mr. Jim Arend, Gem Lake Zoning
Administrator,
On Behalf Of
CITY OF GEM LAKE
Frederic C. Magnuson
City Clerk
cc: J Arend, Zoning Administrator
D. Gardner, .Planning Commission
City Council
2.
11/41 ( t r c i1' \ Yi z-i 5
ctj C'.`CK
Gtm
ti4
V t 4 v �r it/\ a V1 4
Y 0-2-
k} i''t`-trle
x"t e. *t. 61.
V i-
°LA.
lx.i r�.i it.:
ri
Richard M. Hansen
2720 N. DALE, 41214
ROSEVILLE, MN 55113
\L 2. 1
e-
c1 [] t.1 L
Ic
V) 5 I 114
k
CL I. co 5 it
JO, t7.5e„
W z t h. q e- (T " C 7 i? 4. M
ki a t-i1 rc t �i ) 1i L ( CL j C t ..
AcIrn i 5-tr a to
1-1 trz i i 0 a�.
June 30, 1994..
Mr. Bill Short
I-35E PMT Chair
White Bear Township
1281 Hammond Road
White Bear Lake, MN 55110
Dear Mr. Short::
3535 VADNAIS CENTER DRIVE, 200 SEH CENTER, ST PAUL, MN 55110 612.490.2000 800 325-2055
ARCHITECTURE ENGINEERING - ENVIRONMENTAL • TRANSPORTATION
RE: Metro Council
I-35E Corridor Study
SEH No. A-METR03354.00
Much of the June 14th meeting of the project management team for the I-35E Corridor Study was
devoted to MnDOT's letter of curie 8 1994. The main concern of MnDOT relative tothe draft
of the I-35E report was the lack of prominence of land use comments within the report. Their
letter offered a number of suggestions. The PMT considered and agreed to some of the
suggestions and modified or developed others.
As we agreed, we are not able to modify the report to reflect their desired changes, republish
the entire report and then hold public meetings. We are assuming that after the public meetings,
and after the comments of the various councils and boards, that we will again have some
modifications which would require another publishing of the report. We agreed at the meeting
that we will revise some of the sections and provide copies of those major revisions to the PMT
for their review. These sections are attached for your review and comments. We are asking that
you and other members of the PMT review and submit any comments, findings or conclusions
to. SEH.
If you have any questions, please .free .to call me.
Respectfully submitted,.
Glen Van Wormer,Manager
Transportation Department
kam
c:
I-35E Corridor Project Management Team. Members:
Ann Braden, Metropolitan Council
Lloyd Nielson, Gem Lake
Tom Watson, North Oaks
Gerry Urban, Vadnais Heights.
Jim Robinson, White Bear Lake
Dan Soler, Ramsey County
Cyrus Knutson, MnDOT Metro District
Ruth Ann Sobnowski, MriDOT Metro District
SHORT E'LLIOTt
HENDRICKSON INC. MINNEAPOLIS, MN.
ST CLOUD, MN CHIPPEWA FALLS, WI
MADISON, WI
(Pg. 4 and 5)
Findings and Recommendations
The study of the balance ofland uses and roadway system capacity; concluded with a
number of --findings and`°, recommendations that can be;summarized in three areas;
General
A probable level of development within the current
designations of the communities Comprehensive Land Use
Plans can Abe accommodated with varying levels of
improvements to the highway and local street systems.
* A Travel Management Organization (TMO) will be needed to
ensure that the moderate land use development trends are
maintained and an ultimate balance is achieved between the
land uses and roadway system capacity. There will be a need
to periodically monitor the corridor development and traffic
volume characteristics and to update the study model
accordingly.
Land Use
* Probable land use is :based on: comprehensive plans, ex sting
trends 7and specific'proposals: Roadway 'modifications; are
necess:-` -` prdbable deela merit' ` and;; °road
improvements a0dand land use'>must; still be coordinated- carefully
within the •scope- of;this study and: fmdings.
* It will not be economically or environmentally. feasible to
improve the roadway system to accommodate the traffic.
generated if all land develops to the maximum intensities as.
allowed in the Comprehensive Land Use Plans.
Roadway System.
* The overall land use mix of residential, commercial and
industrial developments in the corridor will tend to encourage
shorter trip lengths. Improvements will be needed to the local
street system to accommodate this travel and to protect the.
metro highway system from undesirable ramp to ramp trips.
between adjacent interchanges.
* Through commuter trips using I-35E will continue to grow as
development north of the study area proceeds in areas such as
Hugo, , Lino Lakes, and Forest Lake.
* I-35E is experiencing a peak hour "spreading" trend which has
been observed throughout the Twin Cities area. The percentage
of traffic in the peak hour has been found to be decreasing
slightly while the period of high traffic has become more
prolonged as drivers adjust schedules to avoid congestion, This
trend of peak hour spreading is expected to continue into the.
future.
* Access to I-35E- and 1-694 will be more difficult during peak
hours as most ramps are equipped with metering devices. The
Minnesota ADepartment of Transportation (MnIDOT)
improvement program has scheduled the installation of ramp
meters on the I-35E on -ramps at CR-E, the southbound I-35E
on -ramp from TH-96, and all 1-694 on -ramps in the study area
during the next 3-5 years.
* Travel. Demand Management (TDM) strategies such as. .
staggered work hours, transit and increased. carpooling can be
most effective. if implemented by major employers in the area.
The measures will help maintain volume levels below capacity,
but their overall impact on the overall corridor traffic levels
will be relatively minor. TDM. can have its mast .significant
impact on local street intersections which are sensitive to the
fluctuations of local . trip • making..
The evaluation of the roadway system necessary to support the probable level of land.
development identified a number of recommended improvements from major highway
construction to relatively inexpensive intersection modifications such as adding turn
lanes. It is difficult to prioritize between these widely differing types of
recommendations which span varying lengths of time for implementation, have unique.
funding needs and require different levels of agency involvement.
Priorities are easier to assign if the roadway improvements are grouped into similar
categories. The improvements were found to naturally fall into the following.
categories; l) Major New Improvements, 2) Planned and/or Programmed, 3) Short.
Term Improvements, and 4) Other Issue Areas. Recommended improvement projects
within these categories were prioritized and individual implementation strategies were
developed.
(Page 13 and 14)
LAND USE DATABASE
Future Land Use Scenarios
The principal guide in the formulation of future land use development scenarios is the
comprehensive land use plans of the individual cities. Discussion was required with
the respective city staffs since some plans needed updating or special circumstances
might have limited the intensities or land use types originally envisioned.
The amount of future developable land was estimated by overlaying the study area
parcel base mapwith the NWI wetlands and protected waters area designations. City
staff members were consulted regarding each available land parcel. Using the
Comprehensive Plans as a guide, estimates were made concerning the type of use,
potential intensity and general expected phasing of the development.
Two future development scenarios were examined;
* A probable growth scenario
* A higher aggressive growth scenario
With few exceptions, the types of uses for the two scenarios were both allowed under.
the current Comprehensive Plans. The probable growth scenario was developed
assuming a "probable" outcome based on recent development proposals, discussions
with property owners and overall trends of development densities which have typically
occurred elsewhere in the study area. For example, in a high density, multiple -family
residential zone, a City may allow up to 15 dwellings per acre, but may be actually
experiencing development densities of only 7 dwelling units per acre.
The probable growth scenario was based on a;parcel 'by ;parcel or block by block
analysis of land use, .both 'existmg . and future: ,ITlie land' use was discussed with the
planning staff; of: the ;co munity rn an .effort :to' determine tt e.' most likely use of the
property given recent development proposals and current trends within the community.
Where a specific proposal had beenrmadeand was possible under the comprehensive
plan, that specific land use was included in the probable growth scenario.
The high growth scenario addresses the maximum levels of development allowed by
the existing zoning. The land use combinations analyzed were consistent with the
Cities' zoning and comprehensive planning, but the assumptions were chosen to
produce a higher level of trip generation relative to the other permitted land uses for.
that parcel. It is very unlikely that maximum levels of development will occur on all
undeveloped parcels since the intensities would most likely average out over time.
This scenario was introduced to examine "worst case" type traffic volumes.
Tables 2 and 3 compare the overall intensities of existing development to the probable
and high future land use scenarios, while Exhibit 4 shows the locations of the future
projected land use types in the corridor.
(Page 43)
When comparing the two potential locations, it appears that the Hammond Road
interchange would havemore benefits than would the County Road H-2 location.
This is primarily due to the proximity of the interchanges to the existing and future
developments. Also, as the distance of separation between the new interchange and
the TH-96 interchange increases, the number of trips using I-35E for local
movements increases.
Based on the computer modeling, an interchange at County Road H-2 attracts many
more ramp to ramp trips frorn TH-96 that properly belong on the local street
system. From a straight spacing standpoint, the County Road H-2 would fit better
with the overall system since it is more centrally located between the existing
interchanges at TH-96 and County Road J. Hammond Road would meet current
interchange spacing guidelines at slightly more than I mile from TH-96.
There are some drawbacks to introducing a new access. to I-35E:
The propensity to travel between adjacent interchanges on I-35E is
a drawback of introducing another access to I-35E. Ramp metering
adjustments would probably be needed to increase delays for these
types of trips to encourage them to use the local street system.
Due to the perceived time savings, ramp to ramp movements will.
be difficult to eliminate entirely even for the Hammond Road
interchange.
• A new interchange would not replace the need to improve the. TH--
96 ramps. and turn lanes on the bridge.
* An interchange would most likely induce an accelerated
development of adjacent land parcels, possibly at higher intensities
than if the additional access to I-35E was not provided. It must be
recognized that the "probable" land use around -the new interchange
should be continued unless a supplemental study shows that the
additional traffic generated can: be absorbed by the proposed road
system in the entire area, including the I-35E. and 1-694 interchange
area.
* The new access would mix traffic from different types of land uses
between the North Oaks residential uses and White Bear Township
industrial uses. While it appears that this situation would operate
satisfactorily, the issue is of a concern to North. Oaks residents.
The approval process for a new interchange in the metropolitan
area is, both thorough and lengthy. Metropolitan agencies, such as
Mn/DOT and Metropolitan Council, require documentation of the
need and of the impact on the metropolitan system. Interchange
evaluation criteria in the Metropolitan Guide Plan currently requires
interchange crossroads to be minor arterial streets, which neither
Hammond Road nor County RoadH2 are.
Funding of the interchange will fall primarily on local sources.
Unless --<there is a - -significant; improvement to the metropolitan
freeway :system, it s ,.unlikely thatMn/DOT 'will be a willing
contributor of funds to :the project.
(Page 44)
Directional interchanges or an overpass without ramps were considered. An
overpass would probably not be viable since it would serve only approximately
2,000 3,000 ADT. A directional interchange to the south would work in either
location, although traffic from north would be higher at the Hammond Road
location. It appears that there would be relatively little benefit in phasing a
directional interchange initially since there are enough trips using the facility from
both north and south.
Other options were considered such as the completion of the County Road J
interchange to the north. County Road J currently is a half diamond interchange
to the south. Due to the travel times and proximity of the land use development
patterns, the computer modeling predicts that the propensity will be to use TH-96
over County Road J for trips originating north of the project area.
Should approval be obtained from the Federal and State agencies for a new I-35E
interchange, the project would most likely receive a very low priority for future
funding. The MnIDOT Metro District's Goals for priorities are:
1. Preserve the existing transportation system and enhance safety
2. Manage and protect the existing transportation system
3. Address existing and forecasted system needs for expansion or new
alignments of the transportation system.
Finally, with the priorities as stated, local funding sources would need to provide
most if not all of the resources for construction.
A Major -concern> preceeding any new interchange is -thepotential for inducing
additional trips; onto the `metropolitan .freeway `system. Very thorough
documentation of the routings` oftrips; in the area must`;be:done to‘ -show that there
will be an overall positive impact by the new interchange and that: additional trips
will not be added to critical segments on the metro highway system.
(Page 52 - 54)
Plan Adoption and Implementation
The implementation process for the recommended improvements has many facets since
the process involves a number of agencies for reviewing, approving and funding both
development projects and roadway improvement projects. The success of the
implementation depends on a considerable amount of cooperation and coordination
between these agencies. The Cities, Township, County and MnIDOT need to support
the corridor plan as part of their review processes of future development proposals and
land use designation changes within the corridor.
Future funding priorities and regional consistency determinations can be strongly
influenced if the PMT members consistently support the roadway improvement plans
and restrict land use to :that : shown>;tn;;, the;;'= :robable , land ; use ;fscenario. It is
recommended that the PMT should be continued and possibly reorganized as a
Transportation Management Organization (TMO). The primary responsibilities would
be to maintain a process similar to the 3-C planning program encouraged by the
Federal Highway Administration for many years. The 3-Cs stand for a process which
is:
* Continuing
* Cooperative
* Comprehensive
The local review and planning processes need to be updated to be consistent with the
corridor study findings. Each separate jurisdiction needs to review the corridor study
with their planning and policy members and then formally adopt the study. Mn/DOT
support could be documented through some type of letter of intent from the agency.
The corridor study should` be presented to the Metropolitan Council's Technical
Advisory Committee and if possible adopted by and incorporated into the regional
Transportation Development Guide / Policy Plan.
Once the study has been adopted, the Cities and Township can revise and amend their
Comprehensive Land Use and Thoroughfare Plans and the County can update their
Transportation Plan. Comprehensive Plan amendment requests should be relatively
easy to implement by the Met Council since they would be consistent with the
Development Guide / Policy Plan.
A critical element of the implementation portion of the plan is to retain the trip
generation rates as calculated for the probable land use scenario. Data is available on
a parcel by parcel or block by block 'basis in Appendix B. Deviation should be
permitted only after careful study of the impact of the changes and after review by
other members by the project management team.
As time progresses, many changes will occur that may affect the assumptions and
findings of this study. There is a critical need to maintain a continual process of on-
going monitoring and review of the study components. Trip generation rates, traffic
growth trends, intersection operations, and actual versus planned development
intensities all require some periodic review. To guarantee that the roadway capacity
is adequate for the land uses, there needs to be encouragement for local businesses to
implement TDM strategies and then an ability to verify their effectiveness. For these
reasons, the Project. Management Team needs to continue to meet and strategize on an
on -going basis. If the above responsibilities were taken on, the. PMT would essentially
become a Transportation Management Organization for the corridor area.
In its implementation role, the PMT could establish "triggering criteria" which would
identify when changed conditions were of a significant magnitude that the corridor
study assumptions needed to be revisited and possibly revised_ Criteria which should
be considered are:
* Land use development patterns such as use types, intensities or phasing.
become different than those assumed by the moderate land use scenario.
Trip generation changes - findings that certain land uses are producing
more trips per day or. during the peak hours than originally assumed.
• Actual roadway or intersection operations which. are degrading. below
established Levels of Service. For example, the PMT could use LCS D
as a criteria since this is the point beyond which some type of mitigation
is required..
• Observed travel patterns do not match those predicted by the transportation
model.
The PMT should continue to meet to keep abreast of changes occurring in the corridor
area. The PMP is an excellent vehicle to provide communication between agencies,
discuss changes in trends and disc ss developments which do not trigger a specific
meeting. It is suggested that quarterly meetings be held as a -minimum.
It will important to keep the corridor plan up to date. The schedule of when the
update is needed will be determined by when changes occur that may affect the
original study assumptions. Although the schedule should be flexible, it is.
recommended that a brief review of the study assumptions be made annually and an
update of the model and background data be accomplished about every 2 years.
The more pro -active the PMT can become, the more likely the upgrading of the major
roadway facilities can occur in a timely manner. Actions could be taken to:
The PMT could also continue the investigation of funding alternatives and
assist in supporting improvement efforts within the corridor.
Opportunities such as railroad abandonment would also be continually
monitored by the committee.
Project schedules could actually be accelerated through local PMT
initiatives by performing many of the initial environmental evaluations and.
preliminary design studies needed by the MnJDOT and Ramsey County.
As other corridor task forces have done, the PMT could identify areas
needed for future rights -of -way many years in advance of a project, and
then these areas could be protected by official mapping actions and
possibly acquisition through the Metropolitan Council's Right of Way
Acquisition Loan Fund (RALF).
This type-ofprOiactive:assistance;:an i cv ripareher s ve plaiinirig epnsistent
with -the guidelines of ISTEA ;and Swith=the policies,o .:Mn/DOfT ;and.
MetrD oL taxi gauncil ,:'TheRe . Ion0rats ``artatfo1m ravem04:-Pry ram
T17 "should. reco nize.tliat- r: ` t es s :come` *—i coordi fated- alanced
study rather°thaaa single -source requestwhichisImportantAin establishing
priorities foir*limited"funding
Other Changes
Throughout the report, the word "roderate land use" will be changed to "probable land
use" and the definitions added as needed. Specific suggestions from MnJDOT will also
be made and includes some of the following:
On table 1, the Trunk Highway 96 upgrading will be changed from "programmed" to
"proposed" for 1994 95.
A note will be added to the Trunk Highway 96 bridge widening to indicate that the
responsible agency.will be "local initiative; MnJDOT and Met Council and review and
approval agencies." A second note will be added to Table 2 indicating that "moderate
growth is in addition to existing," and that "high growth is in addition to existing and
moderate growth." A note will be added to Table 3 indicating that it is "based on
probable growth scenario."
There may also be additional opportunities to make reference to the parcel by parcel
land use information which is available in. Appendix B, and to the desirability of
comparing any development proposed in the communities to that assumed in the
probable land use scenario and as shown in Appendix B.
McCombs Frank Roos Associates, Inc.
15050.25rd Avenue:North, Piyrno.uth, Minnesota.55447
July 5, 1994
Mr. Frederic C. Magnuson, Clerk
City of Gem Lake
1369 East. County Rd E East.
Gem Lake, MN 55110-5231
Telephone Engineers
612/476-6010 Planners
612/476-8532 FAX Surveyors
SUBJECT: City of Vadnais Heights,
Major Comprehensive Plan Amendment
Bikeway/Trails Plan
MFRA #10750
Dear Mr. Magnuson:
The attached Major Comprehensive Plan Amendment has been prepared
and adopted by the City of Vadnais Heights. Consistent with
"Metropolitan Council's Guideline for Reviewing Local Comprehensive Plan
Amendments" (January 1994) a copy has been 'forwarded toall adjacent
governmental units for review and. comment. If youwish to comment on
the proposed amendment, please submit your comments to the City of.
Vadnais Heights and the Metropolitan Council within 45 days of receiving
the proposed amendment.
Pleaseaddress comments to:.
TAG : pry
Enclosure
Mr. Gerry Urban, City Administrator
City of Vadnais Heights
687 East County Road F
Vadnais Heights, Minnesota 55127-7099
and
Ms. Lynda Voge, Referrals Coordinator
Metropolitan Council
Mears Park Centre
230 East Fifth Street.
St, Paul, Minnesota 55107
Kindest regards,
McC. S FRANK RO9' ASSOCIATEy INC.
Theresa A. Greenfield; Planner
An: Equal Opportunity Employer
INFORMATION SUBMISSION FOR
MAJOR COMPREHENSIVE PLAN AMENDMENTS
This summary worksheet must be filled out and submitted to the
Metropolitan Council with a copy of each proposed major comprehensive
plan amendment. A major comprehensive plan amendment is defined as:
1. A complete revision, update or rewrite of an existing
comprehensive plan, in its entirety.
2. A major plan revision, update, rewrite or addition to a
chapter or element of an existing comprehensive plan.
3. An amendment triggered by a proposed development that requires
an Environmental Assessment Worksheet (EAW) or Environmental
Impact Statement (EIS), as defined in Minnesota Rules 1989,
Parts 4410.4300-.4400, and is inconsistent with the existing
comprehensive plan; or
4. A change (land trade or addition) in the urban service area
involving 40 acres or more.
Please be as specific as possible; attach additional explanatory
materials if necessary. If a staff report was prepared for the Planning
Commission or City Council,please attach it as well.
Send plan amendments to: Lynda Voge, Referrals Coordinator, Metropolitan
Council, Mears Park Centre, 230 East Fifth Street, St. Paul, Minnesota
55101-1634.
I. GENERAL INFORMATION
A. Sponsoring Governmental Unit Vadnais Heights
Name of Local Contact Person Marty Walsh
Address 687 E. County Road F, Vadnais Heights, Minnesota 55127
Telephone 429-5343
Name of Preparer (if different from contact person)
Theresa Greenfield, MFRA, 15050 23rd Avenue North, Plymouth,.
Minnesota 55447
Date of Preparation July 1994
B. Name of Amendment Bikeways/Trails Plan
Description/Summary The Bikeways/Trails Plan is a comprehensive
plan containing policies, plans and guidelines for trails
C.
D.
Vadnais Heights.
Please attach the following:
1. Five copies of the proposed amendment
2. A city-wide map, showing the location of
See trail plan maps 1, 2 and 3.
3. The current plan map(s), indicating
amendment. N/A.
4. The proposed plan map(s), indicating
amendment. N/A.
What is the official local status of the
(Check one or more as appropriate).
X Acted upon by Planning
November 23, 1993
the proposed change.
area(s) affected by
area(s) affected by
proposed amendment?
Commission (if applicable) on
X Approved by governing body, contingent upon Metropolitan
Council_ review, on June 7, 1994
Considered, but not approved by governing body, on
Other
E. Indicate what adjacent local governmental units affected by th.
change have been sent copies ❑f the plan amendment and the date(s)
copies were sent to them. Notification of affected adjacent
governmental units is required for major plan amendments.
The following adjacent local govermental units have been
forwarded copies of this plan: Shoreview, North ❑aks, White
Bear Township, City of White Bear Lake, Gem Lake, Maplewood,
and Little Cananda.
Because ❑f the comprehensive nature ❑f most major plan amendments, a summary
checklist is attached, to help ensure that the amendment is complete for
Council review and to determine whether the proposed amendment is consistent
with the metropolitan systems plan or other chapters of the Metropolitan
]Development Guide. Please indicate whether the amendment affects the
following factors. Where it does, the materials submitted must fully
address the issue(s).
II. IMPACT ON REGIONAL SYSTEMS
A. Wastewater Treatment.
Change in City's Year 2000/2010 flow projections.
X No/Not Applicable
Yes. What will be the net change? How were these
calculated?
2. Community discharges
interceptor..
X No/Not Applicable
more than one metropolitan.
Yes. Indicate which interceptor will be affected by
the amendment and what will be the net changes in.
flows?
B. Transportation
1. Relationship to Council policies regarding metropolitan.
highways.
X No/Not Applicable
Yes
2. Change in typeand intensity of land uses at interchanges and
other locations within a quarter -mile of the metropolitan
highway system?
X No/Not Applicable.
Yes
3. Impact on existing trip generation.
X No/Not. Applicable
Yes
4. Capacity of road network to accommodate planned land use(s),
including metropolitan interchanges.
X No/Not Applicable
Yes
5. Impact on transit and parking strategies.
X No/Not Applicable
Yes'.
6. Does the proposed amendment contain any changes to the
functional classification of roadways? These changes require.
Transportation Advisory Board (TAB) review.
X No
Yes. Describe which roadways
C. Aviation
1. Impact on regional airspace.
X No/Not Applicable.
Yes
2. Impact on airport search area.
X. No/Not Applicable
Yes
3. Consistency with guidelines for land use compatibility with
aircraft noise.
X No/Not Applicable
Yes
4. Consistency with the long-term comprehensive plan for an
airport in the vicinity of the community or proposed
development.
X No/Not Applicable
Yes
D. Recreation ❑pen Space
1. Impact on existing or future federal,state or regional.
recreational facilities.
X. No/Not Applicable
Yes
III.. IMPACT ON METROPOLITAN DEVELOPMENT AND INVESTMENT FRAMEWORK
A. Land Use
1. Describe the following, as appropriate:
a.
b.
c.
d.
e.
f.
Size of affected area in acres City-wide
Existing land use(s)
Proposed land use(s)
Number of residential dwelling units and types involved
Proposed density
Proposed square footage of commercial, industrial or
public buildings
Change in the City's population, household or employment forecats
for the Year 2000, or any additional local staging contained in
the original plan.
X No/Not Applicable
Yes
C. Change in urban service area boundary ❑f the community.
X. No/Not Applicable
Yes
D. Change in the timing and staging of development within the urban
service area.
X No/Not. Applicable
Yes
IV. IMPACT ON HOUSING
A. Impact on the supply and affordability of housing types necessary
to serve persons at different stages in the life cycle.
X No/Not Applicable
Yes
S. Impact on the supply and affordability of housing types necessary
to serve persons at varying income levels.
X No/Not Applicable
Yes
C. Impact on the community's numerical. objectives for low an
moderate -income, •modest -cost market rate, and middel and upper --
income housing units.
X No/Not Applicable
Yes
V. WATER RESOURCES
A. Does the plan. amendment affect a Minnesota. Department of Natural
Resouces or U.S. Army. Corps of Engineers protected wetland? If
yes, describe type of wetland affected and .show location on a mpa..
X. No.
Yes.
B. Will thewetland be protected?
N/A No. Explain why not.
Yes. Describe how.
C. Will the plan amendment result in runoff which affects the quality
of any surface water body? If yes, identify which ones..
N/A Into.
Yes.
D. Will the water body be protected?
N/A No. Explain why not.
Yes. Describe how.
VI. IMPLEMENTATION PROGRAM
A. Change in zoning, subdivision, on -site ordinances or other
official controls.
X No/Not Applicable,
Yes.
Bikeways/ Trails Plan
for
May 5, 1994
Vadnais Heights Trails Commission.
VADNAIS HEIGHTS BIKEWAY/TRAILS PLAN
Wray 5, 199
Table of Contents
Page
ACKNOWLEDGEMENTS 2
I. INTRODUCTION 3
II. TRAIL TYPES/OBJECTIVES 3
YTl. STANDARDS 4
IV. PRIORITY SYSTEM 5
V. PRIORITY SYSTEM - TRAIL DESCRIPTION
VI. IMPLEMENTATION 8
VII. BIKEWAY/TRAIL SYSTEM 9
VIII. TRAILS AND PATHWAYS MAINTENANCE 9
IX. SUMMARY 10
APPENDICES
Appendix A - Off -Road Bituminous Trail 11
Appendix B - .Off -Road Concrete Trail 12
Appendix C - On -Roadway Trail 13
Appendix D - Off -Road Estimated Trail Cost 14
Appendix E - Trail Impact Study Results 17
MAPS
Map 1- Existing Trails 18
Map 2 - Proposed Trails. 19
Map 3 - Comprehensive Trail System 20
May 5, 1994
ACKNOWLEDGE3NEN'r$
Trail Commission Members:
Tony Poeschel, Chairperson (1991-1993)
Greg Brandt
Thomas. Becknell
Bob Hellen (Chairperson)
Anna Newton
Richard Ducharme
Ron Zimmerman
Mike Taugner
Park and Recreation Commission Liaisons:.
Tom Cheesebrow
Jim Moore
Mark Ahlstrom
Marty Walsh
Planning Commission. Liaisons:
Ed Haddon
Connie Sagstetter
Public Works Liaison:
Joe Momsen
City Council Liaisons:
Sue Banovetz
Sherry Broecker
Special thanks to the above for their contributions to this report.
Report preparation by Bob Hellen and Tony Poeschel.
2 May 5; 1994
VADNAIS HEIGHTS BIKEWAY/TRAILS PLAN
May 5. 1994
Table_of Contents
Page
ACKNOWLEDGEMENTS 2
I. INTRODUCTION 3
II. TRAIL TYPES/OBJECTIVES 3
III. STANDARDS 4
IV. PRIORITY SYSTEM 5
V. PRIORITY SYSTEM - TRAIL DESCRIPTION 6
VI. IMPLEMENTATION 8
VII. BIKEWAY/TRAIL SYSTEM 9
VIM TRAILS AND PATHWAYS MAINTENANCE 9
IX. SUMMARY 10
APPENDICES
Appendix A - Off -Road Bituminous Trail 11
Appendix B - Off -Road Concrete Trail 12
Appendix C - On -Roadway Trail 13
Appendix D - Off Road Estimated Trail Cost 14
Appendix E - Trail Impact Study Results 17
MAPS
Map 1. - Existing Trails 18
Map 2.-Proposed Trails 19
Map 3.- Comprehensive Trail System 20
1 May 5, 1994
VADNAIS HEIGHTS BIKEWAY/TRAILS PLAN
May. 5. 1994
L INTRODUCTION
The Vadnais Heights. City Council, at its June 4, 1991 meeting created an. Ad -Hoc Committee to evaluate
existing trails and to recommend a comprehensive.. bikeway/trail system. As part of this process the.
following was taken into consideration:
a. existing city bikeway/trails plan and existingtrail/pathways/sidewalks in the City;
b. Ramsey County's plans;
c. MNIfOT's long range plans in area;
d. connection with adjacent communities trails and plans;.
e. potential opportunities.with. St. Paul Water Utility or other public land in Vadnais Heights;
f. potential connection of destination points, public parks and open spaces;
g. the preservation of natural habitat, publicparks, open spaces, .etc.;.
h. public safety.
The primary purpose of the Bikeway/Trails Plan contained herein is to provide a comprehensive and
consolidated document regarding policiesand plans for trails in the City:. of Vadnais Heights. This
Bikewayfrrails Plan will provide City Council, commissions, staff and developers with guidelines for
achieving a trails system which will serve both destination and leisure oriented users.
TRAIL TYPES/OBJECTIVES
All of the trails identified herein are for walking and jogging. Most of the trails are also for non -motorized
biking and skating.
Through a deliberate planning/mapping procedure, thecity of Vadnais Heights will be. able to provide a
comprehensive trail system for both destination and leisure purposes. The intent is to provide a system of
interconnecting trails that will allow both the recreational user and bicycle commuter to be able to travel
throughout the city. The system will also provide access to trail systems in the surrounding communities.
3 May 5, 3.994
For purposes of the Trails Plan contained here in, the various kinds of trails are classified as. Regional
Trails, Community Trails and Neighborhood Trails:
A. Regional Trails
Regional Trails are those identified and managed by pubiic agencies such as. County Highway and County
Parks Departments. These trails serve to interconnect communities and provide access to regional
destination points (i.e. regional parks, open spaces, community centers, schools, etc.) Regional trails act as
collectors from community trails and provide safe linkageto state trails.
Possible examples in our city would be the Highway 96 corridor, Centerville Road, and development of the
railroad on the eastern edge of the city.
B. Community Trails
These, are trails identified and managed by local government agencies. Community Trails connect business
areas, residential developments, and parks. Community trails provide safe destination oriented travel.
Examplesin our city are Koehler Road, McMenemy Street and County Road F.
C. Neighborhood Trails
These are trails identified and managed by local government agencies or area residents. Neighborhood
trails are locatedwithin the confines of a specific development area or park area. They provide a safe
Inkage to community trails.
Examples in our city are Lily Pond Trail and Thornhill Lane.
IIL STANDARDS
This Commission developed standards for on -road and off -road bikeway/trails for consistency, safety and
ease of maintenance (snow removal). Proposed off -road width of 8 feet wide and on -road width of 6 feet
meet these concerns. See Appendices A, B and C for trail specifications.
4 May 5, 1994
IY, PRIORITY SYSTEM
In order th prioritize the proposed trails objectively, a rating: system was devised. Thisapproach focuses on
providing safe access to the Vadnais Heights EIementary School, other destination points and park
facilities.. Each trailwas assigned points according to the following categories:
Coda Descrjvtion Points
?pinta.
M Major Trail Artery
m Minor Trail Artery
C City Center
R Recreational
T Trail. Connection
P Park Connection
S Traffic Safety
D Destination Trail
E School Destination
H Housing density
Unimproved County
Categories
Road Shoulder
Trail #
(2 points)
(1 point)
(1 point)
(1 point)
(1 point)
(1. point)
(1 point)
(1 point)
(1 point)
(1 point)
(1 point)
Trail Area
8
7
7
7
7
6
6
6
6
6
6
6
5
5
4
4
4
4
3
3
.3
3
M
M
M
M
M
M
M
M
M
M
M
C
C
T
T
T
P
P
S
S
S
S
I] E
D
D E
H
Al
B2
B3
County Road E
Arcade Street Selland Avenue/Edgerton Street
Centerville Road
B4
CountyRoad D
T
S
D E
U
B5
Koehler Road
T
T
P
S
S
D
C6.
C7
Clover Ave)Stockdale Road/Edgerton Street
County Road FfRice Street
C
T
T
T
P
S
D
C8.
Greenhaven Drive
F
S
S
D
D
C9
C10
m
m
m
m
R
T
T
T
T
T
T
P
P
P
P
S
S
S
S
S.
S
D
D E
D
D
U
.C11
C12
D13
D14
E15
E1S
Highway 96 - South Side - WBL Shoreview
Labore Road (North & South Section).
McMenemy Street
Stockdale Right of Way to Centerville Rd
Edgerton Right of Way - Stockdale to Cty Rd F
North Oak Drive/CIover Avenue
Meadawood Lane/Commerce Court
Thornhill Lane
T
P
S
D
E17
Vadnais Boulevard
.R
m
T
T
P
P
S
S
S
D
EIS -
F19
F20
F21
Wolters Boulevard
Community Park Boardwalk/Trail
Labore Rd Extension to White Bear Parkway
Lake Vadnais - West
R
T
P
F22.
Marigold Trail
5
May 5, 1994
Yz PRIORITY,LYRTFAM - TRAIL DESCRIPTION
Al County Road E: Off -road trail from Centerville Road to Labore Road along north and south side.
New bridge over 35E will have a pedestrian access on the south side only. Off road along south side
only from Labore Road to Refitcity border.. On -road.. shoulders from Lahore Road. to East city border
(need Gem Lake cooperation)..Destination points include Vadnais Heights Elementary School, fire
station (civic area), City Center, many retail businesses, and other businesses.
B2 Arcade. StreetlBelland AvenueiEdgerton. Street: Off -road on east/south side from County Rd E to
Edgerton andeast side of Edgerton to County Road D. On -road shoulders from County Road E to
Berwood Avenue. Berwood Park, fire station (civic area), City Center and retail businesses are
destination points.
B3 Centerville Road: Needs improved on -road shoulders from Goose Lake Roadarea to HWY. 96. This
road will have increased traffic with retail businesses opening up. An off -road bituminous trail
should be developed on west side from Edgerton to HWY. 96. This will connect with the existing
pathway on the west side of Centerville Road at HWY 96. Destination paints along this trail
include, retail businesses on the north and south ends, Bridgewood Park, Vadnais Heights
Elementary School, and Christ the Servant Lutheran Church.
B4 County Road D: Needs on -road shoulders from Edgerton to Lahore Road. With high density of
residents in the area, an off - road trail from Edgerton to Labore Road is necessary. Destination
point includes a retail area.
B5 Koehler Road:. Off -road from Mc- -enemy Street to Edgerton Street on south side only and from
Edgerton Street to Centerville Rr d on the north side only. On -road shoulders from McMenemy
Street to CenterviIIe Road. Vadnais Heights Elementary School destination point. MTC Bus route.
C6 Clover Ave/Stockdale Road/Edgerton Street: Off road on east side from County Rd F to Koehler
Road. On -road shoulders from County Rd. F to Koehler Road. Destinationpoints includefire
station, city hall, and Community Park.
C7 County Road FfRice.Street: On -road widening of shoulders on County Rd F from Rice Street to
McMenemy to match those east of McMenemy Street. Off -road trail on the north side. of County
Road F from Rice Street to Centerville Road and east side of Rice Street from. County Rd F to.
Gramsie Road. Wetlands area needs special handling. Destination points include businesses, future
extension of Community Park, Shoreview trail system, Lake Vadnais and Sucker Lake areas.
C8 Greenhaven Drive: Off -road on east/north side. from HWY. 96 to Centerville Road. This road was
off -set for development of a sidewalk. This road is heavily utilized due to the .many homes in the
area. It provides a safe route to Morningside, Westfield, Bridgewood and Heritage Parks.
C9 Highway 96: Off -road south side of Highway 96 along north city border. (Possible state trail)
6 May 5, 1994
C10 Labore Road (North and South section): (N)On-read shoulders from Goose Lake Road to County Rd
E (need Gem Lake cooperation). Destination points include area businesses and access to City
Center area. (S)On-road: shoulders from HWY. 694 bridge to County Rd D. Off -road between.
bridge decks on west side. Connects past Lahore project to future paved shoulders m Little Canada.
C11 McMeneiy Street: Off -road on west side from Koehler Road to HWY. 96. On -road shoulders from
Koehler Road to County Rd F. Destination pointsinclude business areas, Community Park and Lily
Pond park. MTC bus route.
C12 Stockdale Right of Way to Centerville Road:: Off road connectionon road easement running from
Stockdale Road to Centerville Road to provide access to the Vadnais Heights Elementary School.
D13 Edgerton .Right of Way: Off -road extension of Edgerton Street from intersection with Stockdale
Road north along easement to County Road F. Alleviates some traffic on Clover.
D14 North Oak Drive/Clover Avenue: Off -road from Thornhill Lane to North Oak Drive. On -road
shoulders from east end of North Oak Drive then along Clover Avenue to County Rd F. Destination
points include area businesses, city hall, and Community and Bridgewood. parks.
E15 Meadowood Lane/Commerce Court: Stripe existing shoulders from McMenemy Street to White Oak
Drive. Provide rail crossing to connect Commerce. Court with Westfield Lane. Provide rail crossing
to connect Meadowood Lane to. Lily Pond Park trail,
E16 Thornhill Lane: Off -road on west side from County Road F to Bridgewood Park Trail connection at.
north end of the new Harstad development. Possible future expansion north of off -road trail to
connect with Heritage Park. (Shown. as Thornhill on map.) Bridgewood Park trail connection.
E17 Vadnais Boulevard: South side of Vadnais Boulevard from Centerville Road to Little Canada border.
Destination pointsinclude future park and business area.
EIS Wolters Boulevard: Off -road on north side from Labore Road to HWY. 61. On -road shoulders from
Labore Road to .HWY. 61. Destination points include businesses and Wolters. park.
F19. Community Park Boardwalk/Trail Off -road trails within park area. Connect. new Proposed parkon
northeast quadrant of County Road F and McMenemy Street to existing Community Park. Utilize.
Suter Land split. Connect with off road trail to Lily Pond Park along thenorth side of Lily Pond
Lane.
F20 Lahore Rd Extension to White Bear Parkway: Establish connecting link between Labore Road by
Goose Lake Road to White Bear Parkway.
F21 Lake Vadnais - West:. Discuss the possibility of converting the road between lakes into one-way
vehicle traffic (Water Utility excluded) and the other lane for trail use. (subject to St Paul Board of
Water Commissioners approval).
7 May 5, 1994
F22 Marigold Trail: Off -road trail from 'Caitlin Drive to end of Marigold Lane. Boardwalk is needed for
portions of this trail.
The above twenty two trails represent trails with greatest priority (Grouped by rank A.8 Points).
Additional small trail connections andnew development opportunities have beendiscussed by the Trails
Commission. These will be handled as the opportunity arises. Several potential trails involve private
property. Discussions with the St. Paul Board of Water Commissioners and. H.E. Fuller will need to be.
pursued before these areascan be utilized by the public.
YL IMPLEJ17ENTATI9N:.
The implementation of the Vadnais Heights Trail Plan is dependent on capital dollar allocations. These
allocations will be coordinated with city, county and state road improvement projects that impact any
identified trail areas. Some previous city projectshave been used to arrive at an estimate for what some of
the off -road trail costs might be. These are referenced in Appendix D. In order to quslify for some of the
funding sources that are available, this Trails Plan must first be incorporated into the City Comprehensive
Plan. Thetime framefor development of these trails will be dictated by the funding timetable.
Currently there area number of potential funding sources for trails. These include trail declication fees,
community development grants (state and federal), Metropolitan Council, STP (Surface Transportation
Program), ISTEA (Intermodal Surface Transportation Efficiency Act), Community block development
(state), LCMR (Legislative Commission for Minnesota Resource), foundations, bond referendum, tax
increment financing, budgeted county road shoulder improvements, utility tax, user fees or permits,
charitable gambling, private donations, gas tax (state), safety improvements (MNDot), general taxes, and:
assessments.
Given that there are a number of projects within the city infrastructure that rely onthesame city funding
sources, this commission will work with the various departments inthe city to solicit their input and to
make them aware of the proposed trail plan. When possible, it is the intent of this commission to obtain
funding from sources that, will not result in an additional burden to the taxpayer.
The following is a breakdown of implementation strategies for the various trail types.
A. Regional Trails
In general, the city of Vadnais Heights is notresponsible for acquisition or development of these trails.
This commission willwork with the various regionalagencies to keep them informed of our proposed trails
plansand provide input where appropriate.
8. Community Trails
The city of Vadnais Heights is responsible for acquisition and development of these trails. This commission
will work with the city and their pavement management plan to insure designated trails are included in
resurfacing projects. This is imperative when it is necessary to widen a shoulder to provide the required
room for bicycle traffic. In some cases it may also make sense to try and coordinate off -road trail
development with nearby road improvement activities to keep costs and disruptions to a minimum.
8 May 5, 1994
Where the conditions meet funding criteria and where the city is in agreement with the planned on -road
trail, thetrail developmentwill be included as part of the road improvement activity. Off -road trails will
involve more scrutiny due to the additional funding that might be required. Complete funding
accountability will need to be reviewed and approved prior to any trail development: of this type.
When roadway systems are designated on state or county right of way, City officials should make every
effort to pursue cost -sharing options.
C. Neighborhood Trails
In new developments, the developer is responsible for acquisition and development of sidewalks and trails.
This is best handled by incorporating any sidewalks and trails into the development plans prior to the start
of construction. Incases where the trail will beputin after the initial constructionphase, the acquisition
of the required land should be worked out with all appropriate parties who have property abutting the
proposed: trail :site.
3ELL alliZWAYLLEAUt n T_EM
Maps included in the Appendix show existing trails, proposed trails, and the comprehensive trail system.
EXISTING TRAILS (Map 1): This map shows the on -road and off -road trails that exist as of the summer of
1993. Some trails may still be under construction.
PROPOSED TRAILS (Map 2): This map shows the proposed trails as either on -road or off -road. Trail
numbers are included to correspondwith the priority system trail descriptions.
COMPREHENSIVE TRAIL SYSTEM (Map 3): This map is a combination of existing trails and proposed
trails. City parks are marked with a P, destination points are marked with a D, City Center areas are
marked with a C, and connection points to other communities are shown asextensions of the marked trails
into the neighboring community atthe appropriate locations.
Vill. TRAMS .A Fop PATHWAYS INAINTENAVCE
A Trail maintenance program may include the following maintenance operations: repairs to trail surface,
sweeping, snow removal, sod repair, seal coating, mowing, striping and signage. The level of maintenance
service is determined by local officials representing their community. Subsequently, each municipality will
have varying .levels of trail and- pathway maintenance.
Standard trail widths will help to reduce the number and the types of vehicles required to maintain trails.
Vadnais. Heights currently has several pick-ups with 8' plows, a 5' sweeper, and 6' and 4' snow blowers.
Cities with several miles of trails and walkways have specialized pieces of equipment which are primarily
used for snow removal from trails and pathways. These vehicles are narrow four-wheel drive units that can
9 May 5, 1994
easily maneuver on walkways atefficient speeds. Equipped with either a "V" plow or snow blower, a
specialized maintenance unit such as a "Bombardier" has good winter maintenance capabilities.
TL SUMMARY
The. City has an active Trails/Pathways commission. The City Councii's decision to create thiscommission is
recognitionof the citizen's demand for trails. Trailways should be considered an integral component to the City's comprehensive plan. The development of the bike/trail system will provide a safe.. and pleasant
alternative transportation mode toparks, employment centers, neighborhoods and other points of
destination throughout the city. Also as the 1989 Decision Resource Ltd. survey has shown walking,
running, biking and skating are considered important leisure time pursuits. In addition, trailways should
be considered as a transportation system allowing accessibility, convenience and safety for motorists,
walkers and bikers.
10 May 5,.1994
Appendix A
CURB LINE
2" - 2341 BITUMINOUS SURFACE
5" CL 5 AGGREGATE BASE
COMPACTED SUBGRADE
OFF -ROAD BITUMINOUS TRAIL
11
May 5, 1994
Appendix C
VARIABLE
12' LANE
PAINT STRIPE
8' PREFERRED
NW-
6' MINIMUM
• x------; �.U\5.\���rl\t\\lam\t�t1ti
AecIARAtile6e,O " Orb i Ltd
- S 99439" i7r:9 _ea
CONCRETE CURB
BITUMINOUS SURFACE
GRAVEL BASE
ON -ROADWAY TRAIL
-4111— SLOPE
13 May 5,1994
Appendix D
OFF -ROAD ESTIMATED TRAIL COST
Most off -road trails will be a bituminous surface. Bituminous construction cost for an 8 foot trail is $.70 per
sq. foot = $5.60per lineal foot. This includes 6 inch gravel base and a 2 inch thickbituminous overlay. For
,concrete off -road trailsthe recent Lahore Road construction serves as an example. Construction cost of this.
8 foot wide sidewalk was $1.50 per sq. foot = $12 per lineal foot. This includes 4 inch gravel base and 4 inch
thick concrete. This doesnot include grading, .excavation, turf establishment, easements, hydrant
adjustment, thickened concrete through driveways, and curb ramps. Engineeringcosts for sidewalks
generally run high because of the need to fit into adjacent properties and roadways. It can be seen that the
easiestand least expensive trailway to construct is black topping the existing shoulder along theprimary
streets. The next expensive is gravel trails followed by off -road bituminous trails and the most expensive is
off road concrete trails.
BITUMINOUS
,STREET FOOTAGE DOLLARS
Al County Road E:
Centerville Road to Tracks 620 3,472
Tracks to Lahore. Road 4,028 22,557.
Labore Road to Hwy. 61 3,908 21,885
B2 Arcade Street:
County Road E to Berwood Ave 3,000 16,800
Berwood Ave to Belland. Ave 1,095 6,132
Belland Ave: Arcade to Edgerton 2,677 14,991
Edgerton Street: Belland to County. Rd.D 1,058 5,925
B3 Centerville Road: Edgerton
to PDQ South entrance
B4 County Road D: Edgerton
to Labore Road
B5 Koehler Road: McMenemy to
Centerville Road
14,443 80,881
4,544 25,446
4,705 26;348
C6 Clover/Stockdale: County Road F 3,372 18,832
to Edgerton
Edgerton: Stockdale to Koehler Rd 1,258 7,045
C7 County Road F: McMenemy to 4,028 22,557
Bridgewater
C8 Greenhaven Drive: Hwy. 96 to 7,455 41,748
Centerville
14. May 5, .1994
OFF -ROAD ESTIMATED TRAIL COST (Continued)
BITUMINOUS
STREET FOOTAGE DOLLARS*
C9 Highway 96 South Side:
White Bear to Shoreview 13,200 73,920
C10 Labore Road: Between West Bridge 217 684
Decks (4.5 feet wide)
C 11 McMenemy Street:
Hwy. 96 to County Road F 5,187 29,047
County Road F to Koehler Road 3,918 21,941
C12 Stockdale Right of Way to Centerville Rd: 1,139 6,378
D13 Edgerton Right of Way:
Stockdale to County Road F
D14 North Oak Drive/Clover Ave:
North Oak Drive to Thornhill Lane
2,447 13,703
488 2,733
E15 Meadowood Lane: Cul de sac to Lily Pond Trail 467
Commerce Court: Commerce Court to Westfield
Lane 245
2,615
1,372
E16 Thornhill Lane:
Greenhaven to Heritage 1,244 6,966
Heritage to County Road: F 1,630 9,128
E17 Vadnais Boulevard:
Edgerton Street to Little Canada. Line 2,95916,570
E18 Wolters. Boulevard:
Lahore Road to Highway 61
4,207 23,559
F19 Community Park Trail: 3200 17,920
Boardwalk section 950 unknown
F20 Labore Rd Extension to White
Bear Parkway: 2,984 16,710
15 May.5, 1994
Appendix E
TRAIL IMPACT STUDY RESULTS
The Trail Commission is aware of concerns Vadnais Heights residents may have about trails in their
community. A survey of 101 midwest community Park and Recreation Departments found "that trails
within a .community have a far stronger positive impact than negative. Good design, signage and
enforcement of animal control regulations from the start will keep the trails from being misused?'"
Specifically this survey found:
1). There was NOT a significant increase in problems when trail systems INTERCONNECT.
2) Half of the respondents mentioned PET PROBLEMS as increasing in trail areas (presumably dog
droppings).
3) LITTER wasthe second biggest problem yet only 13% reported an increase in litter.
4) Incidents of VANDALISM, THEFT, TRESPASSING and ACCIDENTS actually decreased once
trails were in place.
5) PROPERTY VALUES. have typically increased, particularly within a block or two of the trail.
* A Survey on the Impact of Community Trail Systems,
March 28, 1992; Prior Lake Minnesota
17 May 5, 1994
on, or NW!! OAKS.
SOONER
LANE
RF:V15E11 MAY 1994[
11
arr fX LIMO cANAOA
.irr1 eru
an' O
*for MAN fAA'j
c1a:
City of
Vidn
Mhalecotal
RR- BEAR f[7NNPP
IM!!Bw
LAKE
arr M'GEI LANE
r
dry cr wAeuraGp
AIKEWAYSITRAILS PLAN
MAP 2 RROPOSED 9IKEWAYSfRAILS
1=liwmn ON STREET
OFF STREET
ra • a1140
xa
CITY OF GEM LAKE
RESOLUTION NO 94 09
WHEREAS , the. City of Gem Lake contracts with the Ramsey County
Sheriff's Department for Law Enforcement Services in the City; and
WHEREAS, Ramsey County has requested an amendment to said contract
allowing the purchase of alternative insurance for the contract
cities through the Minnesota County Insurance Trust via a Joint
Powers Agreement with a term of three (3) years; and
WHEREAS, said amendment will significantly .insurance costs for law
enforcement provided to the contract cities; and
WHEREAS, said reduction in costs is consistent with the City of
Gem Lake guidelines for providing all government services to the
community .a t the lowest possible cost and, therefore, is in the
best interest of the business and residential citizens of Gem Lake.
NOW THEREFORE BE IT RESOLVED that the City Council of the
City of Gem Lake does hereby empower the Mayor and City Clerk to.
execute the aforementioned Amendment To Contract on behalf of the
citizens of the City of Gem Lake allowing Ramsey County, on the
City's behalf, to enter into a Joint. Powers. Agreement with the
Minnesota County Insurance Trust for the purpose of purchasing
insurance for the Contract Cities.
Resolution No. 9409 is ❑ffered by Councilmember McPhillips and
supported by Councilmember Igo was unanimously adopted by the
following vote:
Page z of 2
CITY OF GEM LAKE
RESOLUTION NO. 94-09
AYES
Roland Birkebak
City Councilmember
Clare Nielsen
City Councilmember
John McPhillips
City Councilmember
Patrick Igo
City Councilmember
NAYS ABSTENTIONS.
Roland Birkebak Roland Birkebak
City Councilmember City Councilmember
Clare Nielsen Clare Nielsen
City Councilmember City Councilmember
John McPhillips John McPhillips
City Councilmember City Councilmember
Patrick Igo Patrick Igo
City Councilmember City Councilmember
Paul Emeott Paul Emeott Paul Emeo.tt
Mayor Mayor Mayor
ATTEST:
Frederic C. Magnuson, City Clerk Date
Page 2 ❑f 2
J: %6g. Q4
Z 6124266444 FRIT: I1p5H_SOi
Commissioners, has caused this Amendment to be signed by the Chair and
Chief Clerk of said Board on the day of 19
By:
COUNTY OF RAMSEY
Hal Norgard, Chair
Board of County Commissioners
By:
Bonnie jackelen, Chief Clerk
Board of County Commissioners
APPROVAL RECOMMENDED:
Patricia M. Moen
Sheriff of Ramsey County
APPROVED AS TO FORM:
Assistant Ramsey County Attorney
INSURANCE APPROVED:
Risk Manager
Revenue Estimated $
Account No.
e° 8. 44 et;_ :
a E 1 24 ,t -44
FRIT Np•3iwv5414
FIRST AMENDMENT TO
AGREEMENT FOR
LAW ENFORCEMENT SERVICES
WHEREAS, the parties entered into an agreement for the provision of
law enforcement services by COUNTY for MUNICIPALITY commencing January
1, 1993; and
WHEREAS, the parties wish to amend the agreement as follows;
1. Paragraph II. 5. is amended to read as follows:
5. The COUNTY agrees to maintain, during the term of this
Agreement, automobile, general liability, workers'
compensation, and professional liability insurance in
amounts deemed appropriate by the COUNTY through its Risk
Manager. The COUNTY shall name the MUNICIPALITY as an
additional insured on these policies except for the workers'
compensation policy. The MUNICIPALITY agrees to pay, as a
part of the actual cost as provided in Section IV. below, a
pro rata share of insurance costs. These costs shall
include the costs for any assessments and credits for any
dividends by participating in any insurance pools or trusts.
By electing to participate in a pool or trust, the
MUNICIPALITY agrees to remain in the pool or trust as
required by pool or trust bylaws and/or agreements. The
COUNTY may elect to self -insure all of any portion of these
risks. If the COUNTY cannot obtain insurance and/or elects
to self -insure, the MUNICIPALITY shall pay a pro rata share
of the costs of self-insurance. insurance costs as they
relate to insurance coverage shall include premiums and
deductibles. Costs of self-insurance shall include
reserves, claims and damage payments, and administrative
costs required to maintain self-insurance.
2. Except as modified herein, all other provisions of the agreement
shall remain in full force and effect.
IN WITNESS WHEREOF,
duly adopted by its
(1'Iy 4,'(c flri dt , by resolution
C i'Se (Qune.,' ( has caused this Amendment to be
signed by its �%rr - r and , 7�, c'Irr� and the seal of the
MUNICIPALITY to be affixed hereto on the ,'t day of kin 19_ err
and the County of Ramsey, by resolution of its Board of County
CITY OF GEM LAKE
'i'REASUEhE_k' S REPORT
..tEPUR'l' FOR THE PERIQD. EiEU1FthING
r 9VTHRuUGH 7Ia! 95
ACCUUNT NAME: General Fund Checking #2t39-:280b 11
Balance From
Total Receipte
Payments
Interest
/a.
�x1
$ 6SG. ec
Total Disbursements
Payment ($
Sank Charges
Halarice As Of
C1 ss` /. 7/ )
71 / f
Checks ClU standing
4f
ACCOUNT HAME : Sewer Fund
Balance From
Total Receipts
Payments
Interest
Total Disbursements
Payments
Bank Charges
(. $
$ ‘c3) a, 5
k c5/m'•.:.
66; 797. 26
Checking #289-23.55811
Balance As Of 7,42195
Checks Outstanding
CITES:
is :ar-d .Nor
rom, City. Treasurer
CITY OF GEM LAKE CLAIMS FOR PAYMENT
:CLAIMS: APPROVED:BYSIGNATURES
DATE OF: APPROVAL;,;..
Patrick ]go
Roland Birkebak
Clare Nielsen
John McPhillips
Paul Emeott
Frederic Magnuson.
)),/)(2__
DATE 1 / !
DATE
DATE 1 .1
DATE 7 1 9
DATE 7 / Fy
DATE -7I jl
,CL;4iM#:..:::O:.ATE:::.:::
[::,:'.:.::::.:.:.:.::.i: :RAID TO :;::;::.'.r::..::
:.DESCRIPTION :OF::. CLAIM .:.;.:.:::,::::AMOUNT
,
..::. ;::FUND:'
: ::.,'FUND.::
S 1102
18-Jul-94
Metropolitan Waste Control
AUG94 Sewer Service Charges
509,00
509,00
G 4041
18-Jul-94
City Of: White Bear Lake
JUL94: Fire & Paramedic
640.50
640.50
G 4042
18-Jul-94
Ramsey County
JUL94: Law Enforcement
3,676,00
3,676.00
G 4043
18-Jul-94
Northern States Power
JUN94: Street Lighting
59.18
59.18
G 4044
18-Jul-94
Wynne's Rubbish & Recycling
JUN94: Recycling Collection
160,00
160.00
G 4045
18-Jul-94
ONeill,Burke,O'Neill at al.
JUN94: Tousley Water.Jolnt Powers
120.25
120.25
G 4046
18-Jul-94
FREDERIC C. MAGNUSON
TOTAL FOR JUNE, 1994
206.45
G 4046
18-Jul-94
Frederic C. Magnuson
JUL94: Telephone. Service + Fax Line
42.93
G 4046
IS-Jul-94
Frederic C. Magnuson
JUN94: Long Distance Telephone
8.50
G 4046
18-Jul-94
Frederic C. Magnuson
JUN94: Council Copies
34.81
G: 4046
18-Jul-94
Frederic C. Magnuson
JUN94: Planning Commission Copies
28.00
G 4046
18 Jul-94
Frederic C.
Laser Printer Cartridge
63.13
G 4046
18-Jul-94
Frederic C. Magnuson
JUN94: 52.miles @.$0.29
15:OS
G 4046
IS-Jul-94
Frederic C. Magnuson
2 Council Minute Books
14.00
G 4047
18-Jul-94
INTERNAL REVENUE SERVICE
2nd QTFl94 SocSec&M'carelMcaid
361.50
G 4047
18-Jul-94
Internal Revenue. Service.
Employee Paid Soc Sec
146.49
G 4047
18-Jul-94
Internal Revenue Service
City Paid Soc Sec
146.49
G 4047
18-Jul-94
Internal Revenue Service
Employee Paid M'carelM'caid
34.26
G 4047
18-Jul-94
Internal Revenue Service
City Paid M'care/M'caid
34.26
G 4048
IS-Jul--94
Internal Revenue Service
Accounting Adjustment
16.00
16,00
ALL IS-Jul-94
JULY 1994.SUMMARY
TOTAL. FOR JULY, 1994
$5,748.88
$5,239.88:.
$509.00
8.33% Of Budget. Monthly
% Annual Budget
4.64%
4.88%
3.09%
ALL 18-Jul-94
YEAR-TO-DATE 1994 SUMMARY
TOTAL YEAR-TO-DATE, 1994
$42;493.36
$38,192.36
$4,301.00
58.33% Of Year Completed
% Annual Budget
34.30%
35.55%
26.15%
ALL 18-Jul-94
VERSUS ANNUAL BUDGET
Annual Budget.$Under/($Over)
$29,769,39
$24,474.56
$5,294,83
58.33% Of Year Completed
Annual Budget %Under/ -%Over
24.03%
22-78%
32.19%
DTE: Revised 25 July 1994 To ADD #G 4048 To. IRS & Correct Total
CITY OF GEM LAKE CLAIMS FOR PAYMENT
18-Jul--94
Patrick Igo
Roland Birkebak
Clare Nielsen
John McPhillips
Paul Emeott
Frederic Magnuson
CLAIMS APPROVED BY SIGNATURES���
DATE OF APPROVAL
7- - ����
DATE
1 !
ticsL CV 211)2
DATE
7
/ 1 C !
DATE
! I
a
DATE
7
1 /K,9
r _-dgid
DATE 7 I1II fit
DATE
I 1
CLAIM#
DATE
PAID TO
DESCRIPTION OF CLAIM
$ AMOUNT
GENERAL
FUND
SEWER
FUND
S 1102
18-Jul-94
Metropolitan Waste Control
AUG94 Sewer Service Charges
509.00
509.00
G 4041
18-Jul-94
City Of White Bear Lake
JUL94: Fire & Paramedic
640.50
640.50
G 4042
18-Jul-94
Ramsey County
JUL94: Law Enforcement
3,676.00
3,676.00
G 4043
18-Jul-94
Northern States Power
JUN94: Street Lighting
59.18
59.18
G 4044
18-Jul-94
Wynne's Rubbish & Recycling
JUN94: Recycling Collection
160.00
160.00
G 4045
18-Jul-94
ONeill,Burke,O'Neill at al
JUN94: Tousley Water Joint Powers
120.25
120.25
G 4046
18-Jul-94
FREDERIC C. MAGNUSON
TOTAL FOR JUNE, 1994
192.45
G 4046
18-Jul-94
Frederic C. Magnuson
JUL94: Telephone Service + Fax Line
42.93
G 4046
18-Jul-94
Frederic C. Magnuson
JUN94: Long Distance Telephone
8.50
G 4046
18-Jul-94
Frederic C. Magnuson
JUN94: Council Copies
34.81
G 4046
18-Jul-94
Frederic C. Magnuson
JUN94: Planning Commission Copies
28.00
G 4046
18-Jul-94
Frederic C. Magnuson
Laser Printer Cartridge
63.13
G 4046
18-Jul-94
Frederic C. Magnuson
JUN94: 52 miles @ $0.29
15.08
G 4046
18-Jul-94
Frederic C. Magnuson
2 Council Minute Books
14.00
G 4047
18-Jul-94
INTERNAL REVENUE SERVICE
2nd QTR94 SocSec & M'care/Mcaid
361.50
G 4047
18-Jul-94
Internal Revenue Service
Employee Paid Soc Sec
146.49
G 4047
18-Jul-94
Internal Revenue Service
City Paid Soc Sec
146.49
G 4047
18-Jul-94
Internal Revenue Service
Employee Paid M'care/M'caid
34.26
G 4047
18-Jul-94
Internal Revenue Service
City Paid M'care&M'caid
34.26
ALL 18-Jul-94
JULY 1994 SUMMARY
TOTAL FOR JULY, 1994
$5,718.88
$5,223.88
$509.00
8.33% Of Budget Monthly
% Annual Budget
4.62%
4.86%
3.09%
ALL 18-Jul--94
YEAR-TO-DATE 1994 SUMMARY
TOTAL YEAR-TO-DATE, 1994
$42,463.36
$38,176.36
$4,301.00
58.33% Of Year Completed
% Annual Budget
34.28%
35.54%
26.15%
ALL 18-Jui-94
VERSUS ANNUAL BUDGET
Annual Budget $Under/($Over)
$29,799.39
$24,490,56
$5,294.83
58.33% Of Year Completed
Annual Budget %Under/ -%Over
24.06%
22.80%
32.19%
ffi F4,6 n r,v.
11-4 Metropolitan Council
AA Adirocating regional.econarnic, societal and environmental issues and solutions
June 31, 1994
Frederic C. Magnuson
Clerk
City Of Gem. Lake
1369 County Road E East
Gem Lake, MN 55110
Dear Mr. Magnuson:
The Metropolitan Council staff has prepared a preliminarypopulation and household
estimate (April 1, 1993) for your community. Enclosed for your review is a 1993
worksheet which includes 1990 Census background. data.
The estimates are used by the Council tomonitor population: and household change in the
region. We striveto provide estimates That are accurate and that treat each municipality
consistently. If you have questions about the estimates, please contact Kathy Johnson al
29.1.6332. If you prefer to submit written comments, please direct these to Ms. Johnson as
well..
We would Iike in send. lhe estimates to the State Department. of Revenue by' mid -July for
use.in-their local aids formulas..If you have questions about how local aids are. calculated,
please address them to. Rich Gardner, Minnesota Department of Revenue, 296-3155. If
possible, we'd like to finalize the numbers before submitting them. to the Department of
Revenue. To.•do so, we need to hear from you by.July S; 1994: Thank you for your
prompt alteration to this matter.
S.ineerely,
Dottie Rietow
Chair
DRIkj.
Enclosure
31ea0s Pcrk.(Antrc. ..231l Fa33 Filth 31. t?T61, hlinnnsota 55103.1624 612 201,6359 Fax 291-6556 T151).291-6%4
4, Equal ppporrunaay.Employer
.141 ETRO 'O.LITAN COUNCIL.
PROVISIONAL POPULATION ESTIMATE
AE'RIL I, 1993.
'City or Township: Gent I.aite
1993 Iiausiing Uni s
Housing By•Type.
1990 Census
Housing Units
I993
Estimated
Completed
IIodsing Units
19.93
.Estimated
Occupied
Ilouseholtl5
• 51ng1e-Fani ily
140
145
.142:
ivlultifattiily (incl: Townhouse)
3
2
2
Mobile Home
0
0
0
TOTAL
A' 143
14'1
144
HOUSEHOLD ESTIMATE
1990.Census Households
1.40
/993 Household Estimate.
144
POPULATION. ESTIMATE
1990'Census Total Population
439
1990 Group Qtrarters.Populaiion
rl
1.J90 Population. in Households
428
1993. Population Estimate
446
1993 •Group Quarters Population
l 1
19.93 Population in Households
435
PERSONS PER (HOUSEHOLD
1990.Census Pcrsons.par Household
. 3.06
1993 Persons per Household
3.02
All numbers 1 rums el -April 1 of•each year:
' This total.includes 1 twits.listcd in "other" housing in the 1990 Census data. Ihe Ccnsus.dclites these uiiits as Litnse
not fittiral; the defined housing categories, suet[ as houscboals, railroari tars, campers and vans. 5ince no informttlioii un
"other" units is..available between censuses; for purpnses:pf 1993 pepulation .snd household estimation, these units have •
• ben allocated to the single. and multiple family categories. This was done Rased Art persons per "otter" hoitschoht.and
the ratio of single -Family .to mta[tifnmily housing in.the jurisdiction:
CITY OF GEM LAKE
1369 Comity Road "E Exist
TELEPHONE: (612) 426 6443
Paul R. Emeott,..Mayor
Frederic .Magnuson, City Clerk
Gem Lake, MN 55110 523.1
FACSIMILE: (612) 426-6444
Richard Nordstrom, Treasurer
Mr. Reggie Edwards
RAMSEY COUNTY
Office Of The County Manager
250 Court House
150 West Kellogg Boulevard
Saint. Paid, MN 55102
RE: Strategic Planning Comments
Dear Mr, Edwards,
29 June 1994.
Regarding your fax transmission of 28 June 94 and notwithstanding the veryshorttirne:given to prepare a statement,
please accept the following as wheal believe :to he.representative of the feelings of both the Gent Lake City Council and the:
Gein Lake Planning Comrnission: As you have provided no time for development of this statement by the aforementioned
:bodies, I have takenit upon inyself to prepare what I believe is pertinent.
THOROUGHFARES.
Presuming Ramsey County Roadway Turnhacks are completed as proposed, we ai-e concerned as follows,
COUNTY "E"; Already heavilycongested, the proposedopening of Wal-Mart in Vadnais Heights: at 1 35E
and County..E combined with a proposal tobuild a Target Store (opposed by Gem Lake by City Council
Resolution) adjacent the Wal-Mart will increase daily trips to in excess of 45,000 cars. Vadnais Heights
proposal to develop the southside of County E will enhance the problem: As a :dominantly residential
cornrmtnity dedicated to the quality of residential life in our City, Gem Lake proposes County E from
Highway 61 to Centerville Road become a .'parkway" rather thrift the "trunk highway" itappears to be'
currently. We feel the addition of deeper setbacks, significant: landscaping requirements, bike and pedestrian
pathways, . and a 35 MPH speed .limit would be appropriate to protect our residential environment,
LaBORE ROAD: LaBore Road will also be adversely affected by Vadnais Heights aggressivedevelopment
posture and siniilar 4-lane parkway action is requested here from County E to the northern city limits.
GOOSE LAKE ROAD: Shnilarly affected by Vadnais Height's as well as- White Bear Township development.
While we :realte this is an extension of County T; speeds along this road are .regularly exceeded by
significant r ates:.The i oadway itself is inpoor condition and pedestrian/biketraffic is ohlinipresent. We
oppose: any attempt to widen Goose Lake Road to 4 lanes, but do feel the additton:of a. pedestriarnlbike path
would :be appropriateand certainly a reduction in speed.
TRANSIT
Gein Lake residents have elected to live in the area due to it's remote feeling. We don't believe transit issues affect
the city at this time.
1
RAMSEY COUNTY
Mr. Reggie Edwards
29 June 1994
SERVICE DELIVERY
As the bulkof land to be developed within the City is large residential parcels, excluding the commercial area at
Noffrnan Corners (County E & Highway 61) and since no major development is planned or being pursued, .we find no need
for additional service delivery at this time
LOCATION OF PUBLIC UTILITIES
With the exception of the significant number of overhead electric, telephone and cableutilities, we also find no
probleminthis area. Placing overhead transmission: cables underground might be desirable in most areas to: pr-event storm
interruption.. of services. Most of our cityemploys individual septic systems and has:. their own wells.
ECONOMIC DEVELOPMENT
With the exception of possible redevelopment of the Hoffman Corners business area in Gem Lake to upgrade
businesses and facilities, we oppose any significant commercial development in the area as .we fed itwill adversely affect the
quality residential environment we have developed, fought for over time.; and continue to nurture through thoughtful planning
and restrictive actions. Residents of Gene Lake enjoy a quality of life and neighborhood that, f believe, needs tobe protected
For f rrther comments, please contact Mr. Paul t2, Emeott /Mayor) 'or' Mr. David Gardner {Chairman, Gem Lake
Planning Conwiission}.
Regards;
CITY OF GEM LAKE.
Frederic C. Magnuson
City Clerk
cc: P. Enieou
D. Gardner
2
RRMSEY. CTY MANAGER
TEL Jun 28'94 14:40 N❑.009 pool
INk
RAMSEY COUNTY
❑fflce of the County Manager
Terry Schutten, COtnty Manager
250 Court House
t 6 crest Kellogg Boulevard
St. Paul, MN 65102
To: City Managers
From: Reggie Edwards • Ramsey Couauty Manager's Office
Re: Strategic Planning Process
To1:612-266-8000
Fax: 612-206-80139
Dear City Manager.
We will soon begin our endeavor to create a vision for the County's strategic plan.
I will be focusing on the following arras within the county's strategic plan:
thoroughfares. transit. service delivery (as it relates to development), location of
public utilities. and economic development.
In an effort to create some literature for review by all committee members prior to
our first meeting there is a need for input from each of you cone erniag your city.
I am asking you to provide me with one separate paragraph addressing e h of the
five subjects/Issues previously stated. These paragraph combined should equate
to no more than two typed pages,
Please, limit all parsgrapbs to a maximum ofseveu sentences (rem rrnberwe are only
familiars ping Individuals with what t2 happening within your city).
This is a qui'-k turn around request so I will need you or delegate sortieone to fax
to me your five paragraphs by Friday .7uly 1. You nauy fax me at (812i 266-S039.
Thank you, for your attention and erpcdtency in this matter. If you have any
questlpnM, you may contact me by phone at (6121 266.5024.
Regal Is
Role Edwards
Ramsey County Manager's Office
Miane )ta'h First Home Rule County
pranW‘' vF kky:;NJ "AT..il.. !i.iri +r. r riir p.;c: h
CITY OF GEM LAKE
1369 County Road WE East
TELEPHONE: (612) 426-6443
FACSIMILE TRANSMISSION
Gem Lake, MN 55110-5231
FACSIMILE: (612) 426-6444
DATE:
TO:
TIME:
RE:
29 June 1994
Paul R. Emeott
9:25 am Central Time
Ramsey County Strategic Planning
This transmittal is to contain 04 page(s), including this cover page. Please
verify the number of pages you receive and call the telephone number listed above if
transmission problems have occurred.
COMMENTS
Paul,
Page 2 of this transmission was received by FAX yesterday requesting a response by 01
July. As we won't have a chance to meet prior to responding, I prepared a response enclosed
as pages 3 & 4. Please review and make appropriate comments today if possible. I also faxed
a copy to Dave Gardner requesting his input.
Thank You,
CITY OF GEM LAKE
FreSic C.JMagnuson, City Clerk
CITY OF GEM LAKE, RAMSEY, MINNESOTA
RECYCLING REPORT
I 9 9 4
GENERAL INFORMATION
1. SERVICE AREA
2. REPORT PERIOD
3. CONTRACTOR
4_ # HOUSEHOLDS
5. MONTHLY DATA
Gem Lake, Ramsey, Minnesota
01 January, 1994.- 31 December, 1994
Wynne's Rubbish & Recycling, Inc.
140 Single Family, 0 Multi - Family, 435 Residents
See. Below
1994 MONTHLY DATA
Jan94:
Feb94>
Mar-=94:.:
Apr-94
May-94:::;
Jun94
Jul-94
Aug-94<.:
Sep-94
Oct-94
Nov94;
Dec94
PAPER
1,050
1,250.
1,100
1,300
1,250
1,100
:METAL_
250
225
200
250
200
200
GLASS:
800
750
750
1,000
1,100
700
TOTAL •
2,100
2,225
2,050
2,550
2,550
2,000
0
0
0
0
0
0
STOPS
80
84
82
91
92
82.
0
0
0
0
0
0
$160.00
160.00
160.00.
160.00
160.00
160.00
SERVICE FREQUENCY';``
PER.
MONTH
2.0
2.0
2.0
2.0
2.0
2.0
1 st:
WED:
53
49
42
43
45
43
.3rd
WED
27
35
40
48
47
39
ANNUAL
TOTALS
7,050
Pounds
1,325
Pounds
5,100
Pounds
1:3,475
Pounds
3.525
Tons.
0.663.
Tons
2.550
Tons
6.738
Tons
511
Stops •
$960.00
Y-T-D
2.0
Stops
275
Stops
236.
Stops
MONTHLY:
AVERAGES.::..:
1,175
Pounds
221
Pounds
850
Pounds
1.,123
Pounds
0.588
Tons
0.110
Tons
4.425
Tons
0.561
Tons
43
Stops
$160.00
Y-T-D
6,725
Pounds
1,475
Pounds
4,5.75
Pounds
12,775
Pounds
3.363
Tons
0.738
Tons
2.288
Tons
6.388
Tons
520
Stops
$960.00
Y-T-D
275
Stops
245
Stops
ACTUAL
CHANGE:
vs 1993
TOTALS
325
Pounds
(150)
Pounds
525
Pounds
700
Pounds
0.163
Tons
(0.075)
Tons
0.263
Tons
0:350
Tons
(9)
Stops
$0.00
0
Stops
(9)
Stops
0/0
CHANGE
4.8%
-10.20/0
11..50/0
5.5%
-1..7%
0.00/0
0.0%
-3.70/0
Clare A. Nielsen, Recycling Coordinator Aug-94
T
- PATRICIA M. MOEN
RAMSEY COUNTY SHERIFF
George W. Katseres, Chief Deputy
14 W. Kellogg Boulevard
St. Paul, Minnesota 55102-1648
Telephone: (612) 298-4451
Telefacsimile: (612) 292-7398
To: City Administrators (Seven Coi?.Cities)
From: Commander Jerry Bergero
Subject: Traffic Deputy Statistics for 993
Date: June 20, 1994
The following information was determined by using actual fine
information for the period October 1993 thru March 1994 and taking
the average fine per ticket by city. Using this average fine
number we multiplied by the number of tickets written by the
traffic deputy in each city. The average fine per ticket varies
slightly for each city and the figure for a particular city was
used to compute 1993 revenue for that city. This is still only an
estimate but it is more accurate than we could previously provide.
Average Fine Amount / Ticket by City
Arden Hills $35.14
Gem Lake $33.55
Little Canada $37.96
North Oaks $32.33
Shoreview $39.04
Vadnais Heights $34.73
White Bear Township $23.30
These averages are based on 81.72 % of the tags issued being
dispositioned out by the Court for this 6 month period.
ADULT DETENTION DIVISION (612) 292-6050 • CIVIL PROCESS {612) 292.6030 • PATROL DIVISION (612) 481.1317 • WARRANTS (612) 298-4893
s
City
# Tags 1993 Est. Fine Amt
Arden Hills 221
Gem Lake 141
Little Canada 303
North Oaks 89
Shoreview 463
Vadnais Heights 168
White Bear Town 216
Totals 1601
$ 7,765.94
$ 4,730.55
$11, 5.01. 88
$ 2,877.37
$18,075.52
$ 5,834.64
$ 5,032.80
$55.,.818.70
Cities Share
$3,882.97
$2.,365.28
$5,750.94
$1,438.69
$9 ,. 0 3.7 . 7 6
$2,917.32
$2,516.40
$27,909.35
1 'I r 1 r 1 r ; ; . ti /l 7t1 1 11-1 ll ri ✓ e 1. r>C1 i r i ), . -lrM
OFFICE
ARNE H. CARLSON
GOVERNOR
CERTIFICATE OF COMMENDATION
In recognition of your successful efforts as a partner
in a partnership nominated for the 1994 Partnership
Minnesota Cooperative Public Service Award; this
commendation is presented to:
City of Gem Lake
of the partnership
Ramsey County Suburban Law Enforcement
Services Contract Group
with the appreciation and respect of
the people of Minnesota.
ir.ririri4rri�
IN WITNESS WHEREOF, I have hereunto
set my hand and caused the Great Seal
of the State of Minnesota to be
affixed at the State Capitol this
seventeenth day of May in the year
of our Lord one thousand nine hundred
and ninety-four, and of the State
the one hundred and thirty-fifth.
GOVERNOR
[AFSCME]
u.++Lsx.
RAMSEI' COUNTY
Risk Management
1020 Government Center West
50 West Kellogg Boulevard
St. Paul, MN 55102
July 11, 1994
Fritz Magnuson
City of Gem Lake
1369 County Road E
Gem Lake, MN 55110-5231
RE: Agreement With Ramsey County Sheriff's Department
Dear Fritz:
Tel: 612-266-2920
Fax: 612-266-2934
Here are three copies of the contract amendment. This amendment
allows the County to enter into a JPA with the MN County In-
surance Trust to purchase insurance for the contract cities
exposures.
As part of the JPA, the County is to remain in pool for a minimum
of 3 years or until the exposure no longer exists if prior to 3
years. The cities are the recipients of any dividends from this
program along with any assessments that are made.
Once the council has approved these changes, please forward to my
attention.
Sincerely,
Georgeann Schulte
Risk Manager
Enclosures
94711/ b
Risk Management
1020 Government Center West
50 West Kellogg Boulevard
St. Paul, MN 65102
(612) 266-2927
Georgina Schulte
Risk Manager
Fax: (612) 266-2934
Minnesota's First Home Rule County
printed on recycled paper with a minimum of 10%pos4mnsurner coil lent