Loading...
HomeMy WebLinkAbout2010 05-03 PC PACKETCITY OF GEM LAKE, MN City Hall - 4200 Otter Lake Road Gem Lake, MN 55110-3763 Telephone 651-747-2790 E-mail City(i�umlakeMN.or<� To: Planning Commission, City Council, and Mayor Uzpen From: Craig Rafferty, Planning Commission Chair GEM LAKE PLANNING COMMISION AGENDA, May 3, 2010. Place: Heritage Hall 1. Call to Order at 7PM. 2. Review and Approval of April 2010 Meeting Minutes 3. Public Hearing Flood Ordinance 4. Introductory Review of M and H Gas Station Proposal 1 5. Review of Planning Commission Size Preference: N a. Do not change the number of PC members b. Add an Alternate to the PC. c. Add an additional 5ch member to the PC. 6. Discussion on Final Comprehensive Plan Review and Adjustments for Chapter 5 and 6 (as time allows) Trevor Oliver 7. Other Business Look for us on the World Wide Web at gemlakemn.org CITY OF GEM LAKE, MN 4200 Otter Lake Road Gem Lake, MN 55110-3227 Telephone 651-747-2790 E-mail Cityn�!emlakeMN.ory_ Gem Lake Planning Commission Meeting 6 April 2010 The regular meeting of the Planning Commission of Gem Lake was called to order by Chairman Craig Rafferty on Tuesday, April 6, 2010 at 7:00 p.m. in the Gem Lake City Hall conference room. The following members were present: Chairman Craig Rafferty, Planning Commission members Beth Herzog, and Dan Marier. APPROVAL OF AGENDA AND MEETING MINUTES Planning Commission Agenda: Chairman Rafferty asked for any changes, deletions or added agenda items None was given, so proceeded to move forward with the meeting. Planning Commission Minutes: Chairman Rafferty called to approve the March Planning Commission meeting minutes. The March Planning Commission minutes were discussed and some corrections were needed. Upon motion by Commissioner Marier and seconded by Chairman Rafferty. The March minutes were approved with corrections. Ayes — 2, Nays — 0. NEW BUSINESS Four Seasons CUP Changes: Chairman Rafferty told the Planning Commission that the amendments were made and were presented to the City Council and passed at the March City Council meeting. Hansen Property (West of Daniels Farm Road): The Daniel Farms Road Association was present at the meeting wanting to know the status on the development of the Hansen property. Chairman Rafferty explained that there was some interest from a developer for three story building with a pitched roof and a senior single level assisted living with a zero lot line and also single level senior living. The development is residential in nature. The Planning Commission has made it clear to the developer that the Daniels Farm Road is not available for use with this development if it goes forward. The concerns from the nine resident properties along the Hansen property are opposed to any height variation to be built on that land. The question was raised on how the city would pay for the Gem Lake Planning Commission Minutes Page 2 of 4 construction development. Chairman Rafferty explained that no drawings have been done yet, just a site plan. Chairman Rafferty has been attempting to have an open forum for anyone to come forward and discuss the situation. Nothing has been scheduled due to the fact that the Planning Commission has asked repeatedly for the developer to come forward and discuss this and they have declined. A list of questions was sent out to the city residents to keep everyone informed about the situation. No discussion with the developer yet and there may not be any discussion. If one arises, the residents will be informed. Chairman Rafferty feels that the Planning Commission and the City Council are looking at development for the good of the residents. Commissioner Herzog stated that at this point in time the developers right now are just shopping around to see what the cities will pay. Because Gem Lake has not heard from the developer, it's a good chance that they won't develop here. Chairman Rafferty had received a letter with questions regarding the development of the land. There is no secret agenda with the Planning Commission and the City Council and the resident of Gem Lake has been informed and will be updated. Mayor Uzpen stated that with the new ordinance that was passed stated what can be developed in Gem Lake. The basis of the ordinance was discussed with the developer. Comprehensive Plan Review — Section Four: Section Plan Assumptions, Goals and Issues. Page 11 — Plan Assumptions: Chairman Rafferty feels it will flexuate and add with regularly adjustments. Met Council is to work with those projections and will need to be regularly adjusted. Page 12 — Goal of this plan needs to have new residential development in mixed use planning area that averages at least three units per acre to conform to the Metropolitan Council guidelines. Chairman Rafferty does not want it to state that way. In the next use planning area improves the average to balance with the Metropolitan Council guidelines for land use. Improve the average to balance with the Metropolitan Council guidelines. So it averages throughout the city. Will question SEH on what it refers to and will need clarification. The last sentence on page 12 needs to be adjusted so it is not just on commercial development. Page 13 — Provisions for Public Utilities — Sanitary Sewers: Sentence reads sanitary sewers are being installed in the neighborhoods of the City of Gem Lake as requested. Chairman Rafferty thinks it should say in designated neighborhoods in the City of Gem Lake as requested in the designated areas. So it shows that not all neighborhoods have the option to do so. City of Gem Lake presently serving a portion of residents and commercial properties owners. Take out the number of sewers. Page 14 — The last portion of the last sentence, take out sentence referring to parks in the future for Gem Lake. Look for us on the World Wide Web at gemlakemn.org Gem Lake Planning Commission Minutes Page 3 of 4 Comprehensive Plan Review — Section Five: Does the Gateway ordinance tie into the comp plan? Ordinance 107 ties into the Comp Plan. This section will need all new updated maps. Attorney Trevor Oliver will need to come to May's Planning Commission meeting to work with the Planning Commission on getting the ordinances in agreement to present the Comp Plan. Upon motion by Commissioner Herzog and seconded by Commissioner Marier, it was agreed to table the discussion on Section Five. OPEN DISCUSSION Additional Member for Planning Commission: Chairman Rafferty was open for discussion on adding another member for the Planning Commission. Ordinance states three members with an alternate are enough for the Planning Commission. Mayor Uzpen suggested that Paul Emerott withdraw his application for a seat on the Planning Commission. ADJOURN Upon motion by Commissioner Herzog and seconded by Commissioner Marier, the April 6, 2010 regular meeting of the Planning Commission was adjourned at 8:29 pm. . Ayes — 3, Nays — 0. APPROVED: ATTEST: ATTEST: Julie Newkirk Craig Rafferty Recording Secretary Chairman Look for us on the World Wide Web at gemlakemn.org Gem Lake Planning Commission Minutes Page 4 of 4 SIGN-UP SHEET: Paul Emerott Fritz Magnuson Tony Scornavaao John Kony Mike Garrett Isaac Nelson U Look for us on the World Wide Web at gemlakemn.org SECTION 5 - "ES" ESTATE RESIDENTIAL DISTRICT Section 5 Intent The intent of the estate residential district is to preserve the historical and cultural characteristics of the real property generally associated with the water body Gem Lake and its attendant wetlands. These lots are large, five acre minimum, that traditionally have been home to estates and farms. This area has traditionally been associated with large lots and "estate" style homes. Section 5.1 Permitted Uses. Within any "ES" Zoned Estate Use District, no structures or land shall be used except for one (1) or more of the following uses: 5.1.1 Single family detached dwellings 5.1.2 Truck gardening and other horticultural uses provided that only those products produced on the premise be sold or offered for sale. Section 5.2 Permitted Accessory Uses. Within any "ES" Zoned Estate Use District, the following uses shall be permitted accessory uses. 5.2.1 Attached or detached housing such as a carriage house or garage apartment, up to one additional un it. 5.2.2 Private garage, car port or parking space. 5.2.3 The keeping of not more than two (2) roomers. 5.2.4 Private swimming pool, tennis court, horse training ring, or similar construction for non - motorized private sports and recreation. J 5.2.5 Home occupation 5.2.6 Structures temporarily located for purposes of construction on the site for a period of time not in excess of such construction. 5.2.7 Conservatories for plants and flowers, not including any business, trade or industry. 5.2.8 Essential services. Section 5.3 Conditional Uses. Within any "ES" Zoned Estate Use District, no structures or land shall be used for the following uses except by Conditional Use Permit: 5.3.1 Country clubs, golf courses and other private non-commercial recreation areas and facilities, including swimming pools; provided that any principal building or swimming pool shall be located not less than fifty (50') feet from any other lot in an "E" or "R" District. 5.3.2 Essential Service Structures 5.3.3 Agricultural Structures, including but not limited to barns, stables, kennels and the like. Structures in which farm animals or fowl are to be housed shall require a set -back of one hundred (100') feet of any lot line, well or ISTS. 5.3.4 Bed and Breakfast Establishments 5.3.4 Storage of vehicles, including motor homes, campers and trailers, which are in excess of 7,000 pounds or 20 feet in length. 5.3.5 Family Day Care Horne. 5.3.6 Residential clustered development as regulated by Section 18.19 of this Ordinance. 5.3.7 Residential -use Planned Unit Development (PUD) as regulated by Section 13 of this Ordinance. Section 5.4 Height Regulations. No principal structure shall exceed thirty-five (35'0") feet in height and no accessory structure shall exceed twenty-five (25'0") feet in height measured from the ground six (6'0") feet from the primary front entrance to the highest point of the roof structure. Section 5.5 Area, Frontage and Yard Requirements 5.5.1 The following standards shall apply to all land within an "ES" zoned Estate Use district: A) The minimum lot size is five (5) acres; portions of any lot which lie below the ordinary high water level of the water body Gem Lake shall not be included in any calculation of lot size. B) The maximum total lot coverage by buildings and impervious surfaces allowed on any lot is 25% of the gross lot area. C) A lot must have a minimum of 200 feet of frontage on an improved private way or public street. D) All structures on the lot must be set back a minimum of 50 feet from the edge of the public or private right of way which allows the lot to satisfy (C) above. E) The lot must be at least 200 feet wide at the front setback line established by (D) above. F) Structures on the lot must be set back a minimum of 50 feet from the rear lot line, and 30 feet fi-orn any side lot line. In addition, new structures erected must be located 100 feet away from any existing structure standing on another lot. G) The combined total of land dedicated to permitted, accessory and conditional uses on a lot shall not exceed 65% of the total area. 5.5.2 Patios, fireplaces, sheds and pools can be erected within set backs as long as no part of the structure is closer to the front of the lot than the rear of the principal structure. 5.5.3 All provisions within this Section are subject to the regulations stated in Section 21 of this Ordinance (Shoreland Regulations), and if conflict exists between the provisions set forth above and the Shoreland Regulations, the more restrictive provision shall apply. SECTION 6 - "EX" EXECUTIVE RESIDENTIAL DISTRICT ,'—) Section 6 Intent The intent of the executive residential district is to preserve the historical and cultural characteristics of the real property that has traditionally been classified as low density but does not meet the characteristics or the criteria of the Estate Residential District for preservation of larger lots or for application of Planned Unit Development. Section 6.1 Permitted Uses. Within any "EX" Zoned Residential District, no structure or land shall be used except for one (1) or more of the following uses: 6.1.1 Single family detached dwellings 6.1.2 Truck gardening and other horticultural uses provided that only those products produced on the premise be sold or offered for sale. Section 6.2 Permitted Accessory Uses. Within any "EX" Zoned Residential District, the following uses shall be permitted as accessory uses: 6.2.1 Attached or detached housing such as a carriage house or garage apartment, up to one additional unit. 6.2.2 Private garage, car port or parking space. 6.2.3 The keeping of not more than two (2) roomers. 6.2.4 Private swimming pool, tennis court, horse training ring, or similar construction for non - motorized private sports and recreation. `✓ 6.2.5 Home occupation 6.2.6 Structures temporarily located for purposes of construction on the site for a period of time not in excess of such construction. 6.2.7 Conservatories for plants and flowers, not including any business, trade or industry. 6.2.8 Essential services. Section 6.3 Conditional Uses. Within any "EX" Zoned Residential District, no structure or land shall be used for the following uses except by Conditional Use Permit 6.3.1 Agricultural Structures, including but not limited to barns, stables, kennels and the like. Structures in which farm animals or fowl are to be housed shall require a set -back of one hundred (100') feet of any lot line, well or ISTS. 6.3.2 Bed and Breakfast Establishments. 6.3.3 Storage of vehicles, including motor homes, campers and trailers, which are in excess of 7,000 pounds or 20 feet in length. 6.3.4 Family Day Care Home. 6.3.5 Essential Service Structures. j 6.3.6 Residential -use Planned Unit Development (PUD) as regulated by Section 13 of this Ordinance. Section 6.4 Height Regulations. No principal structure shall exceed thirty-five (35'0") feet in height and no accessory structure shall exceed twenty-five (25'0") feet in height measured from the ground six (6'0") feet from the primary front entrance to the highest point of the roof structure. Section 6.5 Area, Frontage and Yard Requirements 6.5.1 The following standards shall apply to all land within an "EX" zoned Residential district: A) The minimum lot size is three (3) acres; portions of any lot which lie below the ordinary high water level of the water body Gem Lake shall not be included in any calculation of lot size. B) The maximum total lot coverage by buildings and impervious surfaces allowed on any lot is 35% of the gross lot area. C) A lot must have a minimum of 200 feet of frontage on an improved private way or public street. D) All structures on the lot must be set back a minimum of 50 feet from the edge of the public or private right of way which allows the lot to satisfy (C) above. E) The lot must be at least 150 feet wide at the front setback line established by (D) above. F) Structures on the lot must be set back a minimum of 50 feet from the rear lot line, and 35 feet from any side lot line G) The combined total of land dedicated to permitted, accessory and conditional uses on a lot shall not exceed 65% of the total area. 6.5.2 Patios, fireplaces, sheds and pools can be erected within set backs as long as no part of the structure is closer to the front of the lot than the rear of the principal structure. 6.5.3 All provisions within this Section are subject to the regulations stated in Section 21 of this Ordinance (Shoreland Regulations), and if conflict exists between the provisions set forth above and the Shoreland Regulations, the more restrictive provision shall apply. u Jean Reiter From: Tom Riedesel [Tom.Riedesel@ci.white-bear-township.mn.us] Sent: Monday, May 03, 2010 11:15 AM )To: Craig Rafferty Cc: RLUzpen@gmail.com; 'Reiter, Jean' Subject: FW: Rough Idea for 1581 County Road E Hi Craig, Sally Ackerman contacted me this morning regarding plans to develop the old Marathon Oil site. I understand you have a Planning Commission Meeting scheduled for tomorrow night. I suggested that the P. C. may be able to review the plans in concept but would not be able to review anything formally due to the short time frame between her contact and the scheduled meeting. Please let me know if you would like to add this item to the agenda and I will contact the applicant and let her know if you will schedule this item for concept discussion or if it should wait until the June meeting. Thanks, Tom From: Sally Ackerman[mailto:sally.ackerman@gmail.com] Sent: Monday, May 03, 2010 10:28 AM To: Tom Riedesel Cc: Giorgi Gochitashvili Subject: Rough Idea for 1581 County Road E Tom: Per our conversation this morning, I wanted to send a quick email regarding my husband's and my plans for the above -referenced property. We are currently waiting for a purchase agreement from the bank, but have been )told that our offer for the property was accepted. We run a small car dealership in Maplewood called Vera Auto Sales, which we would like to move to the Gem Lake property. Specifically, we have the following thoughts about the property: Renovate the Car Wash building to house the car dealership, with up to 20 cars for sale, which will be parked on the South and East sides of the building. We'd like to keep the garage doors and car space on either end of the building for housing some sale vehicles if necessary and build the office into the middle of the building with an awning over the front door (likely made out of the 3rd window in from Cty Road E) and a small patio/apron to welcome customers. We would also build in a restroom off the office and the renovation of course would include code standards, HVAC, etc. We would like to re -open a gas station/convenience store on the property, fixing the interior of the building to bring everything up to code and installing new pumps also to bring the business up to code. There is currently a commercial kitchen in the convenience store that we would like to run as well, either continuing as a portion of the convenience store, or as a separate commercial deli or bakery. The mechanics' shop behind the gas station we would like to keep relatively as is, although there are a myriad of small hallways and hallway -like offices that we would like to take out and replace with one or two large offices and one or two large storage areas, creating better sight lines within the space. We would also need to replace the roof immediately. Otherwise, the space will be used for car repair. We understand from the bank's realtor that a new well must be drilled for code purposes but that the gas tanks are relatively new and should meet code standards. These are our initial thoughts about the space. We are very excited to work with you and the planning commission on this project and ultimately become commercial residents of Gem Lake. Please contact me directly at (651) 331-6833 with any questions/concerns/clarifications. We do understand that the city council has a workshop tonight and the planning commission has a meeting tomorrow night and we are happy to attend either or both to introduce ourselves and answer any initial questions that you might have. Thank you. Sincerely Sally Ackerman & Giorgi Gochitashvili j U Page 1 of 3 From: Brass, Mike [MBrass@WelshCo.com] Sent: Friday, March 26, 2010 3:07 PM To: bill.short@ci.white-bear-township.mn.us; Riedesel Tom Cc: Craig Rafferty Subject: FW: Gem Lake - Questions See below per our meeting last week Mike Brass Vice President Welsh Companies LLC 5910 Rice Creek Parkway Shoreview, Mn 55126 Cell: 612.750.4312 Fax: 952-541-8054 mike@mikebrass.com www.mikebrass.com From: Eric Anderson [mailto:Eric.Anderson@RyanCompanies.com] Sent: Friday, March 26, 2010 12:52 PM To: Brass, Mike Cc: 'Todd Novaczyk'; Louis De Medici Subject: Gem Lake - Questions Mike, Per our discussion with Bill Short, Gem Lake's contract administrator, he asked us to provide a list of questions we would like some direction on, before we continue to move forward on development plans. This email encompasses the major issues/questions we would have. Please forward these on to the appropriate representatives. If they don't understand any of the questions, please have them call. Development Question: In a difficult financial environment, added uncertainty based on political risk is probably the largest deterrent to moving forward with a development. Based on my review of the Gem Lake Gateway District Development Code, I cannot clearly distinguish: • Whether Sr. Living is an acceptable use; • If it is, whether our required density and height results in an acceptable use (5 acres, 130 units or 26 units/acre, 3-4 stories); and • What the acceptable FAR, Setbacks, and other site -planning criteria are In a typical city, developers look at a comp plan and zoning code as a guide to determine whether you have an acceptable use based on the code and then meet with staff to get guidance on the "development particular" criteria to ensure we don't have a situation that will result in a significant number of variances. Once we get this guidance, developers will typically spend the money to develop full architectural and engineering plans that can be used for final approval. The reason to take the risk is that a municipal code has guided us that we have an acceptable use and we strive to create a development concept with no variances. In that situation, the governing board (either planning commission or city council) don't have the ability to deny approval of the development without justifiable reasons based on the the code. What has been represented to us, is that we should present our concept plan to the City Council for discussion so we can hear their thoughts to help guide us whether to move forward with the development, change the https://rcmail. co.ramsey.mn.us/Jean.Reiter/Inbox/FW : %2OGem%2OLake%20PC%202010... 4/20/2010 Page 2 of 3 concept, or move on somewhere else. We were told that this type of discussion with the Council in no way binds them to accepting the development concept. We also heard that once we have completed this step, we will need to spend the money for full architectural and engineering drawings of the site for approval before the Council. This step costs us $250,000-$300,000. We were also told that even if the Council gives us positive guidance to move the development forward in the initial concept meeting, they could turn down the development for a myriad of reasons after we have invested a significant sum of money. 1. While the preamble was "long-winded", does the planning approval process for this site create that kind of risk after spending the money to get the development fully designed and engineered? Infrastructure: 2. What's are the city guidelines for required road/utility infrastructure - size, specifications, required utilities, required streetscape.etc? 3. It isn't clear whether the road will be public or private. If public, who services and maintains the road and at what cost? If private, are there different specifications? 4. In light of the contribution of open space by the existing landowner, are there other city dedication requirements (either park dedication fees, land dedication requirements, etc.? 5. As part of the development, will the Senior Living development be required to provide anything to the dedicated open space (i.e. trees, plantings, maintenance, etc.)? Fees and_perational Expenses: 6. What are the fees associated with the approval of the development? 7. Describe under what conditions the developer pays for staff review/consultant review of the development? 8. Based on the concept of our proposal (130 units of Senior Living plus new infrastructure), what are the limits of spending regarding the staff review? Is there a cap, what are the various hourly rates, etc.? 9. Are there additional operating costs for the Senior Living development once it opens? There was mention of additional fire service fees to accommodate the ambulance calls to the development. If so, what are those fees (ranges of numbers are fine)? Any other out -of -the ordinary utility fees, licensing fees, etc.? Tree Preservation 10. We respect need to preserve the character of the treeline to the north of the development (along CR. Q. We would like to have the ability to select a mutually agreeable (agreeable to both City & Senior Developer) arborist to examine the treeline and make recommendations to thin out the brush; properly prune the trees; and remove any agreed upon "junk trees" (such as box elder, buckthorn, etc.). in addition, we want the ability to continue to maintain the treeline under an "agreed upon" maintenance guidlelines. Will the City consider such an agreement? 11. In light of the treeline masking the development from view on CR E, we want the ability to place a sign (at a mutually agreeable size and character) at the curb cut from CR E. This most likely would be close -to or in the right-of-way so we don't have to remove trees to install it. Will the City allow such a sign? Ability to move forward with/without other development 12. Under the current plan, the proposal includes a senior living development and ownership- townhomes. We heard in some early discussions that the City would require one of the two to be the https://rcmail.co.ramsey.mn.us/Jean.Reiter/Inbox/FW:%2OGem%2OLake%20PC%202010... 4/20/2010 Page 3 of 3 Master Developer to ensure that both developments move forward. Each developer will have their own financing partner for their respective development. In light of the current economic market, we cannot be held responsible to ensure our neighboring developer will move forward with their development. Will the City require any sort of development guarantee that requires either the senior living or residential developer to develop the entire site? Those are my questions, per Bill's request. Up and above all the questions, #1 is the one that could lead us to look to other development sites. We cannot have significant uncertainty prior to approval if we spend a quarter of a million dollars. Thanks for you review, and please don't hesitate to call if you have any questions. Eric Anderson & Todd Novaczyk Eric Anderson I Director of Development Ryan Companies US, Ina 1 50 South Tenth Street, Suite 300, Minneapolis, MN 55403-2012 612-492-4629 tel 1612-492-3629 fax WWW RYANCOMPANIES_COM xJ cid:imageC https://rcmail. co.ramsey.mn.uslJean.Reiter/Inbox/F W : %20Gem%2OLake%20PC%202010... 4/20/2010 Paul Emeott 3960 Schuneman Rd Gem Lake, MN 55110 DATE; March 29. 2010 TO: Robert Uzpen — Mayor - City of Gem Lake FM: Paul Emeott SUBJECT: Interest in open position on the City of Gem Lake Planning Commission Attached find a short resume stating my education, experience and qualifications for the open position on the Gem Lake Planning Commission. If you have questions or desire additional information, please let me know. Paul Emeott 651-429-5040 Pemeott@comcast.net CC: Craig Rafferty — Chairman — Gem Lake Planning Commission Paul Emeott 3960 Schuneman Rd Gem Lake, MN 55110 Request for opportunity to be considered as candidate for open position on the City of Gem Lake Planning Commission Qualifications for this position Resident of the City: 37 year resident of the City of Gem Lake Education on Zoning and related matters: 1) Zoning Basics (1996) — Government Training Services 2) Beyond the Basics (of Zoning) (1996) — Government Training Services 3) Stormwater and Erosion Control Practices (2004) — Received Minnesota Erosion and Sediment Control certificate Experience in Zoning matters: 1) Zoning Administrator for 12 years — City of Gem Lake 2) Comprehensive Planning P.E. 3/19/10 11 A) Involved in 1975 City of Gem Lake Comprehensive plan as public observer B) Involved in preparation of 1996 City of Gem Lake Comprehensive plan C) Author of at least half of the sections of the 2008 City of Gem Lake Comprehensive Plan 3) Stormwater and Erosion Control A) Member of VLAWMO Technical Committee (2000-2006) B) Chairman of VLAWMO 2006-2007