My WebLink
|
Help
|
About
|
Sign Out
Home
2006 05 15 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2000 - 2009
>
2006
>
2006 05 15 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2026 8:35:41 AM
Creation date
7/20/2026 8:35:05 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CC PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
Show annotations
View images
View plain text
CITY OF GEM LAKE <br />MINUTES OF CITY COUNCIL MEETING <br />15 MAY 2006 <br />The May, 2006 regular meeting of the City Council of the City of Gem Lake was called to order by Acting Mayor <br />Schilling on Monday, 15 May 2006 at 7:01 PM in the first floor meeting room of Tousley Ford. Acting Mayor Schilling, <br />Councilors Bosak, Rasmussen and Watson and Clerk Magnuson were present. Also present were Jim Lindner of the <br />Planning Commission, Mr. & Mrs. Swomley, and Mr. McNulty. <br />Following Mr. Schilling's request for additions, deletions, or corrections, the following actions were taken: 1) <br />unanimous approval ofthe 19 April 2006 Minutes of the City Council meeting as presented on Motion by Bosak, Second <br />by Rasmussen; 2) acceptance of the written record of the General Information Meeting for Public Improvement Project <br />No. 2006-03 held on 24 April 2006; 3) unanimous approval of the 15 May 2006 Agenda of the City Council meeting <br />as amended on Motion by Watson, Second by Rasmussen. <br />The Clerk then presented General Announcements. <br />The report of the Planning Commission was acknowledged and accepted as received in the form of a letter from the <br />Chairman to Mayor Emeott, said report having been distributed electronically to the Council in advance. <br />Staff reports were presented by the Clerk and included comments as follows: <br />1) The application for a variance submitted by Mr. Macalus remains incomplete and it is noted for the record <br />that Mr. Macalus failed to appear before the Planning Commission and present supplemental data as requested. <br />Notice to Mr. Macalus will be sent again. <br />2) The pending application by Flanagan Properties of 1567 East County Road E and Enterprise Car Rental has <br />been delayed due to unexpected terms included in the lease by Enterprise. The matter may still come before <br />the Planning Commission and City Council in April. <br />3) An application for a Variance has been received from Mike Strommer to allow construction of a detached <br />24' x 24' garage on his property within 6' (a 9' variance from set -back) of his property line with Vomacka. The <br />matter has been set for a public hearing on 05 June 2006 before the Planning Commission. <br />4) An application for a Special Use Permit to allow construction of a single family residence at 1400 Goose <br />Lake Road by Bruce and Lorry Shirley which will include a facade in excess of the 35' allowed by the existing <br />city zoning ordinance. With the permission ofthe owner and his architect, the matter is being handled consistent <br />with both the current rules regarding height and the proposed rules regarding height to assist in debugging the <br />procedures. Completion of the preliminary plan review by the Plan Review Commission was completed in 6 <br />days, well within the original guidelines set for the procedure. <br />5) Completion of the proposed changes to Ordinance No. 43 is now at hand and will be incorporated into the <br />document for a final reading before the Planning Commission at a public hearing scheduled for 05 June 2006. <br />Notwithstanding incorporation of comments received at the public hearing, the matter is expected to be sent <br />to the City Council for approval in June. <br />6) Public Improvement Project No 2006-01 is nearing the bid stage and it is anticipated that work will <br />commence in the first 2 weeks of July and be complete by the end of August. Currently it is anticipated that <br />the City Council will be asked to approve plans, details and specifications at the June meeting followed by <br />acceptance of the low bid and order for the work to begin. <br />7) Steady progress continues with the Public Improvement Project No. 2006-02, the City Water Plan. As this <br />plan remains in progress with a completion date currently unknown, it will most likely be beneficial to delay <br />installation of city water and other infrastructure in accordance with Public Improvement Project No. 2006-03 <br />until all details have been concluded with PIP2006-02. White Bear Lake has called and offered whatever <br />assistance might be needed relative the projects and other municipal matters. <br />8) Public Improvement Project No. 2006-04 has been stalled due to staff and volunteer time. The hope is to get <br />back on track as soon as possible, still with an eye on 2007 completion. <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.