HomeMy WebLinkAbout2004 05-05 CC PACKET�J
CITY OF GEM LAKE
CITY COUNCIL AGENDA
Wednesda Aril Meeting Continuation 05 May 2004
CALL TO ORDER
RECONVENE CALL TO ORDE :Mayor Emeott at m.
CALL OF THE ROLL
MAYOR, 2002
CITY COUNCIL, 200
CITY COUNCIL, 2002
CITY COUNCIL, 20
CICOUNCIL, 2004 TY
Paul Emeott
Chuck Watson
Rick Bosak
Pat Igo
Rrollie Birkebak
CITY CLERK
TREASURER
CITY ATTORNEY
CITY PROSECUTOR
SR. BUILDING OFFICIAL
Fritz Magnuson
Sarah Cobian
Tom Newcome III
Doug Meslow
Allen Zepper
CITY ENGINEER
CITY ENGINEER
John Parotti
Dave Mitchell
I
OTHERS IN ATTENDANCE Attach List)
OPENING REMARKS
Mr. Emeott
CTliis meeting is a continuation ofthe April 19`h City Council meeting, said continuation having been granted and approved bed byy
unctl action solely for the purpose of providing additional time for review of Developer's Plan B-2 by the Planning Commission,
Zoning Administrator, City Engineer and Staff and to file their reports. This is the only item to be discussed at this meeting.
Accept Motion to approve City Council Continuation Agenda For 05 May 2004
PLANNING COMMISSION REPORTS
Mfloes hler
r.Chairman's Report To Mayor Emeott Regarding Applications For Hillary Farm Subdivision #2002-02, Plan B-2
B) Planning Commissions Recommendation Resolution
C) Planning Commission Time lines
D Council questions of Planning Commission & Developer
STAFF REPORTS
Mr. Magnuson
A) Status of Plan B-2 Application
B) Possible Ramsey County Involvement
C) City Attorney's Recommendation To Hire Bond Counsel For Sewer
D) Timeline Discussions
1) Next City Council Meeting: Change From May 17`'to May 24'h (or?)
2) Schedule Public Hearing On Plan B-2 As Submitted for May 241h (or?)
3) Schedule Public Hearing on City Sewer Assessment Plan for May 241h (or?)
E) Council questions of Staff
COUNCIL DISCUSSION
Mr. Emeott
As this is not a public hearing, time is primarily devoted to Council questions of planning commission, staff, and the developer
& his staff. Comments and questions from others present shall be at the pleasure of the Mayor. AA
COUNCIL ACTION
Mr. Emeott C —
A) Accept Motion to reschedule May 171h to May 24`h or
B) Accept Motion to set Public Hearing on Hillary Farm Plan B-2 on May 24"'
C) Accept Motion to appoint Kennedy -Graven as Bond Counsel for Sewer Improvement
D) Accept Motion to set Public Hearing on Sewer Assessment Plan for May 241h oro
PRONOUNCEMENTS & AD U 'MENT
Mr. Emeott A
A) The next meeting of the City Council is rescheduled to May -/z'-j."and is ordered published in the appropriate edition of the
White Bear Press Legal Section.
B) Public Hearings on Developer's Plan B-2 and the Sewer Assessment will be held on May and are ordered published
in the appropriate edition of the White Bear Pre s Legal ccti ith supplemental notices to affected land owners as
required. % �
ADJOURNMENT: Motion By I / Second By Unanimous Vote & Emeott Approval at _ �.m.
Page 1 of 1
Nr
f
J
�' '�617 62ft-2
CITY OF GEM LAKE
MINUTES OF PUBLIC HEARING
PUBLIC IMPROVEMENT PROJECT NO.2004-01
MAY, 2004
A Public Hearing forthe purpose ofreceiving public comment on (proposed) Public Improvement ProjectNo. 2004-
01, installation of sanitary sewer at Scheuneman Road from approximately a point near Kahl Circle thence 2,100 feet
south to the south entrance to Hilary Farm was convened by Mayor Emeott before the Gem Lake City Council on
Monday, 24 May 2004 at 8:05 PM in the first floor meeting room of Tousley Ford located at 1493 East County Road
E in Gem Lake, Ramsey County, Minnesota. Mayor Emeott, Councilors Bosak, Igo, Watson and Birkebak, Clerk
Magnuson, City Attorney Newcome, Special Counsel Johnson, City Engineer Parotti and Acting Planning Commission
Chair Lindner were present along with Mr. McNulty and his associates and approximately 30 residents of Gem Lake.
Following Mayor Emeott's request for additions, deletions, or corrections, and on Motion by Igo and Second by
Birkebak, the Agenda for the Public Hearing was unanimously approved.
For the record, Magnuson indicated that a notice of public hearing in the White Bear Press was published on 12 May
2004 and that all affected property owners with real property affected by the project, based upon a certified list secured
from Ramsey County Property Records and Revenue, were also notified by direct mail.
Mayor Emeott gave a brief overview ofthe process leading to this public hearing, indicating that while several other
plans for the development of Hillary Farm have been reviewed, the Plan identified as Plan B-2 includes requirements
for construction of sanitary sewer and that the purpose of tonight's public hearing is to formally receive public comment
on (proposed) construction of approximately 2,100 feet of sanitary sewer in accordance with Gem Lake ordinances and
State of Minnesota statutes.
Mr. Parotti then presented his report titled "Feasability Report, Sewer Extension, Blue Spruce Estates to Hillary
Farmreviewing it's various components and associated costs. A copy ofthe report is attached hereto. Specifically, Parotti
reported that the report was ordered prior to SEH's knowledge of Ramsey County's willingness to reconstruct the road.
Hence, the original feasability study considered 3 options while numbers have been amended to reflect reduction in costs
based upon Ramsey County roadway reconstruction funding.
Mr. Lindner then indicated the Planning Commission felt that based upon comments from the Vadnais Lake Area
Water Management Organization (VLAWMO), the City Engineer, and other experts, construction of a sanitary sewer
for this part of the City was in the best interest of the general and environmental health and welfare of the community.
Mr. Magnuson then reported on Ramsey County involvement in the project relative to rebuilding the road following
construction of the sewer for the project, providing further history of the Functional Roadway Consolidation Plan of
1993, actions taken by the Council at that time, failure by Ramsey County to complete the program with Gem Lake, and
opportunities created by the program today. Effective this day, Ramsey County has agreed in principal to reimburse the
City of Gem Lake in an amount estimated at $170,000 for reconstruction of Scheuneman Road from Otter Lake Road
south to Highway 61. This will, in turn, allow a very cost effective construction of sanitary sewer to properties adjacent
the construction. The project will also be enhanced by today's low interest rates. Finally, Mr. Magnuson noted this was
also an opportunity to address the many concerns expressed by the residents along and adjacent to Scheuneman Road
regarding traffic and speed problems as Gem Lake residents will have substantially more input into a city street than we
do with County Roads. In all, a combination of factors all coming together will yield a project with costs attendant to
benefitted property owners of approximately $6,000 or less than 33% of what these costs might otherwise have been.
Mr. Newcome then spoke and indicated it is the intention of the City to order an immediate review of Ordinance
No. 64 (the "Sewer Ordinance") to prepare amendments to the ordinance that will allow deferred hook up to the sewer
once constructed and cost sharing based upon benefitted property rather than simple front footage. This will be a top
priority if the improvement is ordered.
Mr. Scruggs was then recognized and he asked if the sewer would be available to those north of Kahl Circle. Mayor
Emeott replied that a 2/3 majority of the property owners is required for a project to be implemented and that he has
attempted to contact all property owners north of Kahl Circle to Otter Lake Road to determine their interest in same. To
date, he has been unable to gain a 100% finding and encouraged those interested to talk as soon as possible with tier
neighbors. If interest is determined, a second Public Improvement Project will be implemented immediately upon proper
notification.
CITY OF GEM LAKE
MINUTES OF PUBLIC HEARING
HILLARY FARM SUBDIVISION, PLAN, B-2
MAY, 2004
A Public Hearing for the purpose of receiving public comment on an Application For Subdivision of Lands
submitted by McNulty Construction Company and Hillary Farm, LLC and identified as Plan B-2 was convened by Mayor
Emeott before the Gem Lake City Council on Monday, 24 May 2004 at 7:07 PM in the first floor meeting room of
Tousley Ford located at 1493 East County Road E in Gem Lake, Ramsey County, Minnesota. Mayor Emeott, Councilors
Bosak, Igo, Watson and Birkebak, Clerk Magnuson, City Attorney Newcome, Special Counsel Johnson, City Engineer
Parotti and Acting Planning Commission Chair Lindner were present along with Mr. McNulty and his associates and
approximately 30 residents of Gem Lake.
Following Mayor Emeott's request for additions, deletions, or corrections, and on Motion by Watson and Second
by Bosak, the Agenda for the Public Hearing was unanimously approved.
For the record, Magnuson indicated that a notice of public hearing in the White Bear Press was published on 12 May
2004 and that all property owners with real property located within 350' of the Hillary Farm property, based upon a
certified list secured from Ramsey County Property Records and Revenue, were also notified by direct mail. Magnuson
further noted that, for the record, the Application for Plan B-2 is considered complete to the satisfaction of the City.
Mayor Emeott gave a brief overview of the process leading to this public hearing, indicating that several other plans
have been reviewed in similar hearings, that this plan has been reviewed in other public meetings, and that the purpose
of tonight's public hearing is to formally receive public comment on Plan B-2 in accordance with Gem Lake ordinances
and State of Minnesota statutes.
Mr. Lindner as Acting Chairman of the Planning Commission was recognized and presented the findings of the
Planning Commission who have worked on this development proposal for more than 7 months. Lindner indicated that
the Planning Commission has adopted a resolution recommending the City Council approve Plan B-2 as being in concert
with the various goals of the Comprehensive Municipal Plan and both Ordinance No. 43 (the "Zoning Ordinance") and
Ordinance No. 58 (the "Subdivision Ordinance"). Included in their recommendation to the City Council are a list of40
conditions that must be met to insure these goals and objectives are met.
Mr. Magnuson then reported on Ramsey County involvement in the project relative to rebuilding the road following
construction of the sewer for the project, providing a history of the Functional Roadway Consolidation Plan of 1993,
actions taken by the Council at that time, failure by Ramsey County to complete the program with Gem Lake, and
opportunities created by the program today. Effective this day, Ramsey County has agreed in principal to reimburse the
City of Gem Lake in an amount estimated at $170,000 for reconstruction of Scheuneman Road from Otter Lake Road
south to Highway 61. This will, in turn, allow a very cost effective construction of sanitary sewer to properties adjacent
the construction. The project will also be enhanced by today's low interest rates. Finally, Mr. Magnuson noted this was
also an opportunity to address the many concerns expressed by the residents along and adjacent to Scheuneman Road
regarding traffic and speed problems as Gem Lake residents will have substantially more input into a city street than we
do with County Roads.
Mr. McNulty then presented an overview of his company, it's history with the property and the Plan identified as
B-2, highlighting it's evolution to final form.
Mayor Emeott then requested comments from those present asking that those who have not been heard previously
be recognized first and that comments be limited to 3 minutes each.. Mr. Grundhoffer, Ms. Brown, Mr. Jantz, Mr. John,
Mrs. John, Mr. Scruggs, Mr. Terry and several others made comments and asked questions of Mr. McNulty, the Council
and Mr. Newcome. Generally, Mr. Jantz and Ms. Brown expressed concern over the variance from 3 acre minimum
zoning. Mr. Watson and Mr. Newcome indicated that 3 additional lots were necessary to insure economic feasability of
the project since the City was requiring a plan with sewer contrary to our ordinance. Mr. John asked if the community
was paying for sewer in the development and Mr. Bosak and Mr. Newcome indicated that the development is
underwriting and diluting the cost of the sewer. Mr. Johnson indicated this is the least expensive public improvement
of this magnitude he has seen. Other questions were asked and answered.
Mayor Emeott then thanked all those present for appearing this evening and indicated the matter would be
considered by the City Council later in the evening.
There being no further business, Motion to adjourn by Watson and Second by Birkebak was unanimously approved.
Mayor Emeott declared the proceedings adjourned 8:05 PM.
AUTHORED: 25 May 2004
APPROVED: 21 June 2004
ATTEST: Q ATTEST:
Frederic C. Ma-, Paul R. Emeott
City Clerk Mayor
efile: hearings/2004/HilFazmPlanB-2Minutes.wpd
r�
CITY OF GEM LAKE
MINUTES OF CITY COUNCIL MEETING
MAY, 2004
The May, 2004 meeting of the City Council of the City of Gem Lake was called to order by Mayor Emeott on
Monday, 24 May 2004, at 8:45 PM in the first floor meeting room of Tousley Ford. Mayor Emeott, Councilors Bosak,
Igo, Watson and Birkebak, Clerk Magnuson, City Attorney Newcome, Special Counsel Johnson, City Engineer Parotti,
and Acting Planning Commission Chair Lindner were present along with Mr. McNulty and his associates and
approximately 30 residents of Gem Lake.
Following Mayor Emeott's request for additions, deletions, or corrections, the following actions were taken: 1)
unanimous approval of the City Council Meeting Minutes for 19 April 2004 and 05 May 2004 (continuation) as
presented on Motion by Watson, Second by Birkebak; and, 2) unanimous approval of the City Council Meeting Agenda
as amended for 24 May 2004 on Motion by Bosak, Second by Watson.
Magnuson then presented General Announcements.
Magnuson reported satisfaction of the violation of City ordinances at Singh Enterprises, d/b/a/ HCO.
Review of the Sheriff s reports was tabled to June.
Magnuson then reported that Vadnais Heights has been billing Tousley Ford since 1995 when water was connected
to their facility from Vadnais Heights. Magnuson noted that no Joint Powers Agreement for this exists and the matter
is being reviewed. It is possible that Vadnais Heights could owe Tousley as much as $14,000 in over paid sewer charges.
Magnuson further noted that Vadnais Heights appears to be hesitant to continue to provide plowing/sanding and sewer
flushing services in the future and that Magnuson will institute a search for independent contractors.
Following reading aloud by Magnuson for the benefit of those present, Motion by Watson and Second by Birkebak
to adopt Resolution No. 2004-04 as presented approving with conditions the Application for Subdivision of lands
identified as Plan B-2 submitted by McNulty Construction for Hillary Farm, LLC was approved by a vote of 5 Aye, 0
Nay and 0 Abstain. Following approval, Mr. McNulty presented Mr. Newcome with a letter formally withdrawing all
previously submitted plans including those identified as `B", "D" and "G". Mayor Emeott and the Council then thanked
Mr. McNulty for his patience, foresight and willingness to work with the community to create what we believe will be
ane exceptional development.
Following reading aloud by Magnuson for the benefit of those present, Motion by Watson and Second by Bosak
to adopt Resolution No. 2004- 06 as amended and approving the turn back to the City of Gem Lake from Ramsey County
of Scheuneman Road from it's intersection with Otter Lake Road on the north to it's intersection with State Highway
61 on the south was approved by a vote of 5 Aye, 0 Nay and 0 Abstain. The matter will now be sent to the Ramsey
County Board for affirmation and Ramsey County Public Works for finalization of funding.
Following reading aloud by Magnuson for the benefit of those present, Motion by Birkebak and Second by Watson
to adopt Resolution No. 2004-05 as presented and approving ordering of Public Improvement Project No. 2004-01 was
approved by a vote of 5 Aye, 0 Nay and 0 Abstain.
Following reading aloud by Magnuson for the benefit of those present, Motion by Igo and Second by Bosak to adopt
Resolution No. 2004-07 as presented and approving official intent to reimburse expenditures for governmental purposes
from the proceeds of tax exempt bonds to be issued to fund Public Improvement Project No. 2004-01 was approved by
a vote of 5 Aye, 0 Nay and 0 Abstain.
Following reading aloud by Magnuson for the benefit of those present, Motion by Igo and Second by Watson to
adopt Resolution No. 2004-08 as presented and approving a retail tobacco license for Singh Enterprises, d/b/a Marathon
and HCO was approved by a vote of 5 Aye, 0 Nay and 0 Abstain.
Motion by Birkebak and Second by Igo to NOT WAIVE the monetary limits on municipal tort liability established
by Minnesota Statutes 466.04 was approved by a vote of 5 Aye, 0 Nay and 0 Abstain.
Motion by Igo and Second by Bosak to approve Accounts Payable for April/May as prepared by Magnuson and
totaling $36,656.45 was unanimously approved. Motion by Watson, second by Igo to accept the May Treasurer's Report
as prepared by Cobian and indicating a balance in the General Fund of $47,143.83 and in the Sewer Fund of $28,509.33
was unanimously approved.
Motion by Birkebak and Second by Watson to approve the Clerk's transfer of funds between the sewer fund during
the next sixty days to accommodate cash flow needs prior to receipt of 2004 taxes payable from Ramsey County was
approved by a vote of 5 Aye, 0 Nay and 0 Abstain.
The next meeting of the Gem Lake City Council is scheduled for 21 June 2004. Councilor Watson indicated a
scheduling conflict will keep him from attending.
There being no further business at 9:30 PM, Motion by Igo and Second by Watson to adjourn was unanimously
approved. Mayor Emeott declared the proceedings adjourned.
AUTHORED: 25 May 2004
APPROVED: 21 June 2004
ATTEST:
Frederic C. Magn n
City Clerk
ATTEST:
_ a X AMOA
Paul R. Emeott
Mayor efile: minutes/2004/167maym2004.wpd
11 County Road E East City of Gem LakeGem Lake, MN 55110-5231
Dale E. Swomley & Gretchen P. Artig Swomley
1430 Goose Lake Road
Gem Lake, MN 55110-4121
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Stanley Vomacka
3900 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Michael S. Strommer & Ann L. Strommer
3910 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Kenneth Defiel & Marcia Defiel
3884 Scheuneman Road
Gem Lake, MN 55110-4142
City of Gem Lake
Gem Lake, MN 55110-5231
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
1369 County Road E East
Michael J. Hurt & Lisa E. Hurt
Knut E.Skjerseth & Gladys Skjerseth
3880 Scheuneman Road
3836 Scheuneman Road
Gem Lake, MN 55110-4142
Gem Lake, MN 55110-4142
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
1369 County Road E East Gem Lake, MN 55110-5231
Gerturde A. Hannah
John M. Hurt & Linda J. Hurt
3825 Schenueman Road
3824 Scheuneman Road
Gem Lake, MN 551104143
Gem Lake, MN 55110-4142
City of Gem Lake
Gem Lake, MN 55110-5231
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
1369 County Road E East
Steven Shepherd & Penny Shepherd
David R. Hanson & Jennifer R. Hanson
j 3809 Scheuneman Road
3812 Scheuneman Road
Gem Lake, MN 55110-4143
Gem Lake, MN 55110-4142
City of Gem Lake
Gem Lake, MN 55110-5231
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
1369 County Road E East
Hansen Investments LLC
David K. Gardner & Leslie D. Gardner
1231 Little FoxRoad
1430 Tanque Verde Loop Road
Gem Lake, MN 55110-4117
Tucson, AZ 85749-9778
City of Gem Lake
Gem Lake, MN 55110-5231
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
1369 County Road E East
Thomas F. Rasmussen & Laura E. Rasmussen
Richard J. Arcand
1395 East County Road E
3671 Highway 61 North
+ Gem Lake, MN 55110-5231
Gem Lake, MN 44110-4104
City of Gem Lake
]''-4cCounty Road E East Gem Lake, MN 55110-5231
_ I
Elizabeth F. Murphy
385 North Point Road, #501
Osprey, FL 34229-8984
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Martin P. Meyer
3926 Scheuneman Road
Gem Lake, MN 551104145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Tolomeo L. Ong & Matilda S. Ong
3801 Scheneman Road
Gem Lake, MN 55110-4143
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
1 Alan M. Becicka & Leah R. Becicka
1393 East County Road E
Gem Lake, MN 55110-5231
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Derek D. Wippich & Sarah J. S. Wippich
3860 Scheuneman Road
Gem Lake, MN 55110-4142
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Michael M.Bialke & Nancy A. Bialke
3872 Scheuneman Road
Gem Lake, MN 55110-4142
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Kou K. Vang & Xue Vang
538 Arlington Avenue East
St. Paul, MN 55101-3236
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Marilyn A. Sievers & Anyrine D. Classen
3667 Highway 61 North
Gem Lake, MN 55110-4104
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Shirley M. Goff
3930 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Timothy E. Draine & Cynthia M. Draine
3815 Scheuneman Road
Gem Lake, MN 55110-4143
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
SROAGL, INC.
1369 East County Road E
Gem Lake, MN 55110-5231
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Jason M. Dolan & Susanne M. Dolan
3848 Scheuneman Road
Gem Lake, MN 55110-5336
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Janet L. Franz & Joseph I Franz
4020 Scheuneman Road
Gem Lake, MN 55110-4113
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Bryan M. Hansen
2710 South Shore Boulevard
White Bear Lake, MN 55110-3920
City of Gem Lake
13-)County Road E East Gem Lake, MN 55110-5231
Patrick Bulen
3955 Scheuneman Road
Gem Lake, MN 55110
t
Telephone: ( 651) 426 - 6443
Mobile: (612) 812 — 6139
444W� �* aw
CITY OF GEM LAKE
Office of the City Clerk
1369 County Road "E" East
Gem Lake, MN 55110-5231
PUBLIC NOTICE NO.2004-11
DATE: 06 May 2004
FROM: Fritz Magnuson, City Clerk
TO: Press Publications, Legal Publications @ le,,als@sherbtel.net
RE: Legal Notice To Be Published
To Whom It May Concern,
Facsimile: ( 651) 426 — 6444
Email: GemLakeCity@aol.com
%Q
The following Legal (Public) Notice is to be published in the Legal Notices Section of the 12 May 2004 edition
of the White Bear Press. Please confirm receipt and verify content is in acceptable form for use.
City of Gem Lake -
Public Notice No. 2004-11
NOTICE OF PUBLIC HEARING
The Gem Lake City Council will hold a Public Hearing in accordance
with the requirements of Ordinances No. 58 and 43 at 7:00 PM on Monday,
24 May 2004, in the first floor meeting room of Tousley ford located at 1493
East County Road E in the City of Gem lake. 'ncc purpose of the Public
Hearing will be to receive public comment on an application f'or subdivision
identified as Hillary Farm, Plan B-2 submitted by McNulty Construction
Company, d/b/a Hillary Farms LLC. The subdivision plan includes 29 total
lots and would require variances and zoning changes. The parcel to be
developed is approximately 86.65 acres more or less and is located at 3841
Schcuneman Road. Known as Hillary Farm, the property was previously
owned by Judson and Barbara Bemis, is located in the R-1 Residential
District, and is identified as Ramsey County Property ID Number 27-30-22-
24-0004. Anyone wishing to make comment regarding this proposed
subdivision will be heard.
Additionally, written comments may be forwarded to the City Clerk and
should be sent so as to be received on or before 21 May 2004.
Ssl/FredericC. Magnuson, City Clerk
J5c1x ,49;WZI ff.4eW
`1
a
Telephone: ( 651 ) 426 - 6443
�/, W11011-10& c,
FIELD(Name 1)
FIELD(Name2)
FIELD(Street)
FIELD(City), FIELD(ST) FIELD(Zip)
Dear Gem Lake Property Owner,
CITY OF GEM LAKE
Office of the City Clerk
1369 County Road "E" East
Gem Lake, MN 55110-5231
Email: gemlakeeity@aol.com
),,/Cm2off 9/ayai
Facsimile: (651) 426 - 6444
C3o/e6 Cob/a1Z Ciaatrvrni
12 May 2004
Supplemental to the original applications for subdivision received from McNulty Construction Company, d/b/a
Hillary Farm, LLC, the City of Gem Lake has received one (1) additional Application for Subdivision of Real Property
in Gem Lake known as Plan B-2 and the real property is located within 350' ofyour property. The real property proposed
for subdivision is the approximately 83.0 f acres known as Hillary Farm and formerly owned by Judson and Barbara
Bemis. The property is located along the west side of Scheuneman Road between 3841 Scheuneman Road (south
entrance) and 3955 Scheuneman Road (north entrance) and is identified by Ramsey County Property ID Number 27-30-
22-24-0004. Additionally, a parcel of approximately 3.0 acres previously owned by David K. and Leslie D. Gardner has
been acquired and may be combined with the Bemis property to create a parcel to be subdivided of 86.65f acres.
The purpose of this hearing is to receive additional public comment on Plan B-2, which has evolved as a result of
your previous input and through discussion among the members of the Planning Commission and the City Council. The
following is a copy of the Legal Notice that has been placed in the 12 May 2004 edition of the White Bear Press:
City of Gem Lake
Public Notice No. 2004-10
NOTICE OF PUBLIC HEARING
The Gem Lake City Council will hold a Public Hearing in accordance with
the requirements of Ordinances No. 58 and 43 at 7:00 PM on Monday, 24 May
2004, in the first floor meeting room of Tousley Ford located at 1493 East
County Road E in the City of Gem Lake. The purpose ofthe Public Hearing will
be to receive public comment on an application for subdivision identified as
Hillary Farm, Plan B-2 submitted by McNulty Construction Company, d/b/a
Hillary Farms LLC. The subdivision plan includes 29 total lots and would
require variances and zoning changes. The parcel to be developed is
approximately 86.65 acres more or less and is located at 3841 Scheuneman
Road. Known as Hillary Farm, the property was previously owned by Judson
and Barbara Bemis, is located in the R-1 Residential District, and is identified
as Ramsey County Property ID Number 27-30-22-24-0004. Anyone wishing to
make comment regarding this proposed subdivision will be heard.
Additionally, written comments may be forwarded to the City Clerk and
should be sent so as to be received on or before 21 May 2004.
Ss//FredericC. Magnuson, City Clerk
If you have any questions prior to the public hearing you may contact me at my office at the telephone number
above. You may also provide written comments as long as they are received at my office on or before 21 May 2004.
Regards,
CITY OF GEM LAKE
F. C. "Fritz" Magnuson
City Clerk & Zoning Co -Administrator
efile:PublicNotice2004-1 OMail.wpd
City of Gem Lake
114-9 County Road E East Gem Lake, MN 55110-5231
Current Owner / Resident
1330 Goose Lake Road
Gem Lake, MN 55110-4171
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Linda L. Hoeschler & Roger Katzenmauer Trustee
1630 Edgcumbe Road
St. Paul, MN 55116
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Billy A. John & Judith A. John
4015 Scheuneman Road
Gem Lake, MN 55110-4114
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Daniel P. Marier & Mary J. Marier
4000 Scheuneman Road
Gem Lake, MN 55110-4113
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Dean A. Jantz
3985 Scheuneman Road
Gem Lake, MN 5510-4146
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Charles A. Rudisel
3963 Scheuneman Road
Gem Lake, MN 55110-4146
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Mary M. & Gary P. Limborg Trustee
2979David Circle
Little Canada, MN 55117
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Michael P. Garrett & Tony Scornovacco
1385 East County Road E
Gem Lake, MN 55110-5231
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Kenneth J. Wilson
102 Dellwood Avenue
Saint Paul, MN 55110
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
William J. Flaspeter
4010 Scheuneman Road
Gem Lake, MN 55110-4113
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
James W. Bender & Sally A. Bender
3984 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
James G. Terry
3970 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Paul R. Emeott & Karen M. Emeott
3960 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Gerhardt V. Meyer & Loma R. Meyer
4285 Virginia Court
St. Paul, MN 55126-2382
Mr. Scruggs then asked if city water might also become available. Mr. Magnuson indicated this was a completely
separate topic for discussion and that is was far more complex than construction of the sewer. Mayor Emeott asked Mr.
Lindner to elaborate on efforts to date. Mr. Lindner supported by Mr. Magnuson indicated that the water project needs
to be done essentially for the entire City with estimated attendant cost of more than $2 million and supply problem
resolution. The matter is at least one or more years distant.
Additional comments from Mr. Limborg, Mr. Jantz, and Mr. John were received and addressed by various members
of the Council.
Mayor Emeott then thanked all those present for appearing this evening and indicated the matter would be
considered by the City Council later in the evening.
There being no further business, Motion to adjourn by Bosak and Second by Birkebak was unanimously approved.
Mayor Emeott declared the proceedings adjourned 8:45 PM.
AUTHORED: 25 May 2004
APPROVED: 21 June 2004
ATTEST: ATTEST:
Frederic C. 50niisor Paul R. Emeott
City Clerk � Mayor
efile: hear6ngs/2004/PIP2004-01SewerMinutes.wpd
r"qeo gooY
Telephone: ( 651 ) 426 - 6443
Mobile: (612 ) 812 — 6139
a* a�d
CITY OF GEM LAKE
Office of the City Clerk
1369 County Road "E" East
Gem Lake, MN 55110-5231
I&W9 eaiiil9aw
PUBLIC NOTICE NO.2004-12
DATE: 06 May 2004
FROM: Fritz Magnuson, City Clerk
TO: Press Publications, Legal Publications @ legals(cbslierbtel.net
RE: Legal Notice To Be Published
To Whom It May Concern,
Facsimile: ( 651) 426 — 6444
Email: GemLakeCity@aol.com
The following Legal (Public) Notice is to be published in the Legal Notices Section of the 12 May 2004 and
the 19 May 2004 editions of the White Bear Press. Please confirm receipt and verify content is in acceptable form
for use.
City of Gem Lake
Public Notice No. 2004-12
NOTICE OF PUBLIC HEARING
The Gem Lake City Council will hold a Public Hearing in accordance
with MN Statutes and the requirements of Gem Lake Ordinance No. 64 at
7:00 PM on Monday, 24 May 2004, in the first floor meeting room of Tousley
Ford located at 1493 East County Road E in the City of Gem Lake. The
purpose of the Public Hearing will be to discuss and receive public comment
on (Proposed) Public Improvement No_ 2004-01, Installation of Municipal
Sanitary Sewer pursuant to Minnesota Statutes, Chapter 429. The proposed
sanitary sewer would be constructed along Scheuneman Road commencing at
it's intersection with Kahl Circle and thence southerly approximately 2,100
feet to a point adjacent the south entrance to Hillary Famr, located at 3841
Scheuneman Road. The area proposed to be assessed is the property with
addresses from 3841 Scheuneman Road through 4031 Scheuneman Road and
4039 Scheuneman Road (Gem Lake Hills Golf Course). The estimated cost
of the improvement is $600,000. A reasonable estimate of the impact of the
assessment will be available at the hearing.
Anyone wishing to make comment regarding this (Proposed) Public
Improvement will be heard. Additionally, written comments may be
forwarded to the City Clerk and should be sent so as to be received on or
before 21 May 2004 to the following address:
Office of the City Clerk
1369 East County Road "E"
Gem Lake, MN 55110-5231
Ss//FredericC. Magnuson, City Clerk
J5fzr ✓ffaywaJoff
CITY OF GEM LAKE
Office of the City Clerk
1369 County Road "E" East
Gem Lake, MN 55110-5231
Telephone: ( 651 ) 426 - 6443 Email: gemlakecity@aol.com Facsimile: (651) 426 - 6444
Cih> Clad you/u`mea/f 9%yoi cfoiol Co6ia� `���;� �• r
Public Notice No. 2004-12
NOTICE OF PUBLIC HEARING
The Gem Lake City Council will hold a Public Hearing in accordance with MN Statutes and the
requirements of Gem Lake Ordinance No. 64 at 7:00 PM on Monday, 24 May 2004, in the first floor
meeting room of Tousley Ford located at 1493 East County Road E in the City of Gem Lake. The
purpose of the Public Hearing will be to discuss and receive public comment on (Proposed) Public
Improvement No. 2004-01, Installation of Municipal Sanitary Sewer pursuant to Minnesota Statutes,
Chapter 429. The proposed sanitary sewer would be constructed along Scheuneman Road
commencing at it's intersection with Kahl Circle and thence southerly approximately 2,100 feet to
a point adjacent the south entrance to Hillary Farm, located at 3841 Scheuneman Road. The area
proposed to be assessed is the property with addresses from 3841 Scheuneman Road through 4031
Scheuneman Road and 4039 Scheuneman Road (Gem Lake Hills Golf Course). The estimated cost
of the improvement is $600,000. A reasonable estimate of the impact of the assessment will be
available at the hearing.
Anyone wishing to make comment regarding this (Proposed) Public Improvement will be heard.
Additionally, written comments may be forwarded to the City Clerk and should be sent so as to be
received on or before 21 May 2004 to the following address:
Office of the City Clerk
1369 East County Road "E"
Gem Lake, MN 55110-5231
Should you have questions regarding this Public Hearing, please contact my office or Mayor
Emeott.
CITY OF GEM LAKE
3"
F. C. "Fritz" Magnuson
City Clerk
Page 1 of 1
City of Gem Lake
Lz"Vounty Road E East Gem Lake, MN 55110-5231
Dale E. Swomley & Gretchen P. Artig Swomley
1430 Goose Lake Road
Gem Lake, MN 55110-4121
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Stanley Vomacka
3900 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Michael J. Hurt & Lisa E. Hurt
3880 Scheuneman Road
Gem Lake, MN 55110-4142
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Gerturde A. Hannah
3825 Schenueman Road
Gem Lake, MN 55110-4143
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Steven Shepherd & Penny Shepherd
3809 Scheuneman Road
Gem Lake, MN 55110-4143
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Hansen Investments LLC
1231 Little FoxRoad
Gem Lake, MN 55110-4117
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Thomas F. Rasmussen & Laura E. Rasmussen
1395 East County Road E
Gem Lake, MN 55110-5231
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Michael S. Strommer & Ann L. Strommer
3910 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Kenneth Defiel & Marcia Defiel
3884 Scheuneman Road
Gem Lake, MN 55110-4142
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Knut E.Skjerseth & Gladys Skjerseth
3836 Scheuneman Road
Gem Lake, MN 55110-4142
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
John M. Hurt & Linda J. Hurt
3824 Scheuneman Road
Gem Lake, MN 55110-4142
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
David R. Hanson & Jennifer R. Hanson
3812 Scheuneman Road
Gem Lake, MN 55110-4142
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
David K. Gardner & Leslie A Gardner
1430 Tanque Verde Loop Road
Tucson, AZ 85749-9778
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Richard J. Arcand
3671 Highway 61 North
Gem Lake, MN 44110-4104
City of Gem Lake
County Road E East Gem Lake, MN 55110-5231
John L. Hannaford & Gregory A. Kvam Trustees
1330 Goose Lake Road
Gem Lake, MN 55110-4171
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Linda L. Hoeschler & Roger Katzenmauer Trustee
1630 Edgcumbe Road
St. Paul, MN 55116
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Billy A. John & Judith A. John
4015 Scheuneman Road
Gem Lake, MN 55110-4114
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Daniel P. Marier & Mary J. Marier
4000 Scheuneman Road
Gem Lake, MN 55110-4113
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Dean A. Jantz
3985 Scheuneman Road
Gem Lake, MN 5510-4146
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Charles A. Rudisel
3963 Scheuneman Road
Gem Lake, MN 55110-4146
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Mary M. Limborg & Gary P. Limborg Trustee
2979 David Circle
Little Canada, MN 55117
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Michael P. Garrett & Tony Scornovacco
1385 East County Road E
Gem Lake, MN 55110-5231
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Kenneth J. Wilson
102 Dellwood Avenue
Saint Paul, MN 55110
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
William J. Flaspeter
4010 Scheuneman Road
Gem Lake, MN 55110-4113
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
James W. Bender & Sally A. Bender
3984 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
James G. Terry
3970 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Paul R.Emeott & Karen M. Emeott
3960 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Gerhardt V. Meyer & Loma R. Meyer
4285 Virginia Court
St. Paul, MN 55126-2382
Road East
Elizabeth F. Murphy
385 North Point Road, #501
Osprey, FL 34229-8984
City of Gem Lake
Gem Lake, MN 55110-5231
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Martin P. Meyer
3926 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Tolomeo L. Ong & Matilda S. Ong
3801 Scheneman Road
Gem Lake, MN 55110-4143
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
_1 Alan M. Becicka & Leah R. Becicka
1393 East County Road E
Gem Lake, MN 55110-5231
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Derek D. Wippich & Sarah J. S. Wippich
3860 Scheuneman Road
Gem Lake, MN 55110-4142
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Michael M.Bialke & Nancy A. Bialke
3872 Scheuneman Road
Gem Lake, MN 55110-4142
1369 County Road E East Gem Lake, MN 55110-5231
Kou K. Vang & Xue Vang
538 Arlington Avenue East
St. Paul, MN 55101-3236
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Marilyn A. Sievers & Anyrine D. Classen
3667 Highway 61 North
Gem Lake, MN 55110-4104
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Shirley M. Goff
3930 Scheuneman Road
Gem Lake, MN 55110-4145
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Timothy E. Draine & Cynthia M. Draine
3815 Scheuneman Road
Gem Lake, MN 55110-4143
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
South Road Owners Association of Gem Lake, Inc.
1369 East County Road E
Gem Lake, MN 55110-5231
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Jason M. Dolan
3848 Scheuneman Road
Gem Lake, MN 55110-5336
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Janet L. Franz & Joseph J. Franz
4020 Scheuneman Road
Gem Lake, AIN 55110-4113
City of Gem Lake
1369 County Road E East Gem Lake, MN 55110-5231
Bryan M. Hansen & c/o Richard M. Hansen
2710 South Shore Boulevard
White Bear Lake, MN 55110-3920
City of Gem Lake
l' mntc Road E East Gem Lake, MN 55110-5231
Patrick Bulen
3955 Scheuneman Road
Gem Lake, MN 55110
j
Feasibility Report
Sewer Extension
Blue Spruce Estates to Hillary Farm
Prepared for the City of Gem Lake
MAY 249 2004
I hereby certify that this report was prepared by me or under my
direct supervision and that I am a duly Licensed Professional
Engineer der the a s o the State f M' esota.
i
David D. Mitchell, PE
Date: May 24, 2004 Reg. No.: 20028
i
SEH
Multidisciplined. Single Source.
Trusted solutions for more than 75 years.
Project History
Location
The project is located in east Gem Lake along Scheuneman Road, generally between
Kahl Circle (Blue Spruce Estates) and TH 61. The proposed development of Hillary
Farm lies on the west side of Scheuneman Road. There are also three existing homes and
Gem Lake Hills golf course on the west side, at the northerly end or the project area. The
east side of Scheuneman Road is residential in nature with existing homes.
Project Purpose
The project would provide sanitary sewer service to the Hillary Farm development. The
project would also provide sanitary sewer service to other homes and properties along
Scheuneman Road that are currently on septic systems. The City is aware of four
properties that are interested in sanitary sewer service from the project.
Existing Conditions
Streets
Scheuneman Road is an existing Ramsey County roadway with undefined ditches. The
surface is approximately 24 feet wide, paved, and generally moderate to poor condition.
Scheuneman Road is a potential turn back roadway from Ramsey County to Gem Lake.
Public Utilities
There are no existing public utilities in the project area in or along Scheuneman Road.
Sanitary sewer does exist at the intersection of Kahl Circle and Scheuneman Road,
approximately 500 feet north of the Hillary Farm development.
Private Utilities
Overhead power exists along the length of the project. Generally the power line is on the
west side of Scheuneman Road along the north half of the project and on the east side
along the south half of the project. Cable Television exists on the power poles with the
electric utility. Telephone and gas utilities are buried in the right of way of Scheuneman
Road.
Septic Systems
Septic systems in the area range in age from new to failing. The City is aware of several
systems that have failed in the project area. There are a several septic systems within the
project service area that have been constructed new or replaced within the last five years.
Proposed Improvements
Sanitary Sewer
Sanitary Sewer would be extended from the intersection of Kahl Circle and Scheuneman
Road. There have been three options identified to serve this area with sanitary sewer.
Option 1 — Extend sanitary sewer approximately 500 feet southerly from Kahl Circle to
the northeast corner of the Hillary Farm development. This would provide the
development access to sanitary sewer while minimizing cost to the City. The sanitary
sewer could be installed along the centerline of Scheuneman Road. Construction would
likely remove a majority of Scheuneman Road requiring the restoration of nearly 1500
square yards of bituminous roadway. The total project cost of this option is $100,800
Option 2 — Extend sanitary sewer approximately 1300 feet southerly from Kahl Circle to
the proposed north entrance to the Hillary Farm development. This would provide the
development access to sanitary sewer while providing sanitary sewer service to existing
homes wanting service from the City. The sanitary sewer would be installed along the
centerline of Scheuneman Road. The total project cost of this option is $240,900.
Option 3 — Extend sanitary sewer approximately 2100 feet southerly from Kahl Circle to
the proposed south entrance to the Hillary Farm development. This would provide the
development access to sanitary sewer while providing sanitary sewer service to the
existing homes along Scheuneman Road. The sanitary sewer would be installed along
the centerline of Scheuneman Road to the vicinity of the south entrance to the Hillary
Farm development. The total project cost of this option is $381,000 if the sewer is
constructed in the existing street.
All of these options assume roadway restoration costs that conform to Ramsey County
turnback program. The options anticipate minimal restoration costs for ditches, yards,
culvert crossings, and other miscellaneous features.
Maintenance Impact
The construction of any of the options outlined above will result in the addition of the
respective length of sanitary sewer utility that will require periodic inspections and
maintenance.
Right of Way and Easements
It is anticipated that all construction will take place within the existing right of way to
Scheuneman Road or easements dedicated by the developer. The exception to this would
be for the construction of service stubs to individual homes. It is anticipated that
necessary access to properties for this purpose could be obtained through informal rights
of entry rather than formal easements.
Permits
Permits would have to be obtained from the Minnesota Pollution Control Agency
(MPCA) and the Metropolitan Council Environmental Services (MCES) for the sanitary
sewer extension. A permit would have to be obtained from Ramsey County for work
within the County Right of Way (Scheuneman Road).
Estimated Costs
A detailed cost estimate can be found attached to this report. The estimate was developed
based on anticipated construction costs for the 2004 construction season. The estimates
include a 10 percent contingency for construction and a 30 percent administrative fee for
legal, engineering, administrative, and financing costs. The following is a summary of
the project cost:
Kahl Circle
N. Prop. Line
N. Entrance
To
Hillary Farms
Hillary Farms
N. Property
To
To
Line Hillary
N. Entrance
S. Entrance
Total — All
Farms
Hillary Farms
Hillary Farms
Segments
Sewer Construction
$48,000
$65,000
$65,000
$178,000
Street Construction
$22,400
$33,000
$33,000
$88,400
Subtotal Construction
$70,400
$98,000
$98,000
$266,400
10% Contingency
$7,100
$9,800
$9,800
$26,700
Total Construction
$77,500
$107,800
$107,800
$293,100
30% Administrative Costs
(Legal, Finance,
$23,300
$32,300
$32,300
$87,900
Engineering, etc.)
Total Project Cost
$100, 800
$140,100
$140,100
$3 81,000
Financing
The City has discussed a number of options to finance this project. Those options are
outlined below:
Option 1 — Assessing a portion or the entire project cost to the benefited properties. This
assessment could be levied on a "unit" basis or "front foot" basis for properties adjacent
to the improvement.
Option 2 — The City could enter into an agreement with the developer by which the
developer constructs the improvements at their expense and reimburses the developer as
properties connect to the new utility. The City would establish a sewer district with
appropriate connection charges as a means to reimburse the developer. An arrangement
of this nature typically has a sunset to the agreement. After the sunset date, any
connections charges would be retained by the City. In doing so, the developer would be
"at risk" for connections that would occur after the sunset date.
Option 3 — This option is similar to Option 2. The developer would construct the
improvements as a part of their development. The City would fund a portion of the
project with general funds, borrowed funds, or enterprise funds. The City would develop
a sewer service district for the area benefiting from this improvement. Properties in the
"district" would pay a levied charge in addition to the normal connection fees when the
connected to the sewer service. The additional funds would be retained by the City as
repayment for the improvements financed through the developer.
The City is negotiating terms of a turnback agreement with Ramsey County. Terms of
that agreement may provide a funding source for portions of the street restoration costs.
It is recommended that the connection fees for this district be based on the project costs
J
not funded by Ramsey County turnback funds divided equally across the units served.
This would be 50 residential units plus the golf course property.
A potential funding plan for the option to install all segments is as follows:
Total Project Cost $381,000
Ramsey County Funding $75,000 (prorated share of turnback funds)
Remaining Project Cost $306,000
There are 49 benefited residential units plus the golf course club house. A determination
will have to be done on the flows generated from the golf course. Those flows should be
stated in the form of Residential Equivalent Units (REU's). For the sake of illustration,
we can assume that the golf course generates 1 REU. Given this, the connection charge,
or assessment, would equate to $6,000 ($306,000 = 51 = $6,000).
Conclusions and Recommendations
This project is feasible from and engineering standpoint. The project is necessary to
address the needs of sanitary sewer for both the Hillary Farms development and failing
septic systems along Scheuneman Road. This project is a cost effective means to address
the needs of the community.
Based on finding of this report, discussions with Ramsey County, and the City of Gem
Lake, we recommend the following course of action for the City of Gem Lake:
• This report be accepted as the feasibility report for the herein described project.
• A Public Hearing be held to discuss the proposed improvements and assessments.
Furthermore, it is recommended that the City proceed with the project in accordance with
the following schedule:
• Order Feasibility Report
• Accept Feasibility Report and Order Public Hearing
• Public Hearing
• Order Improvements
• Approve Improvements and Authorize Ad for Bid
• Open Bids
• Assessment Hearing
• Award Construction Contract
• Begin Construction
• Substantially Complete Construction
• Complete Construction
J
April 19, 2004
May 24, 2004
May 24, 2004
May 24, 2004
July 19, 2004
August 12, 2004
August 16, 2004
September 20, 2004
October 1, 2004
November 30, 2004
June 30, 2005
EEqgSS�QHQ8QHQ8Q85S�Q8y8�gH5H�g8q8Q85S�5H�58�58�58�RS58�5S�
g'�
a
25
25 25
25 25
25
2mp5�
2f
25 25
25 25
$
25
S Q
�2�pp5 �b�pp
N HNNN
f2tpp52rpp5
N
NN
{2{pp5
N V
(2�pp5
N N�O/I
�2(pp4
VINNNNN
t2tpp5
f2/ppS
R
4 R
fSpp
i
■
8Q
C
g8g Q85�
25 25
Q8$8jj$j
25 Z5
Q8881Q1llQ$SQ
25 t$
7$ g
2S 2S
Q$8Q
25 2i
25 2$
Q8 Q8
25 2S
Q8 Q858j
2$ 25
Q858�8Q
2$ 2$
25 i$
Q8
25 ■
a
F
Wu7
C c W
■ ■ ¢
9> Al—N
N
¢ W 7
ONy�
yO���OppO
NO
VO��yO���Npp
ONv�
9�:M21,aOW
C2
gim7Efif72Zz
iii13�i31
m2
c
Ztl
Fa�zz'L
t:FttF�'1a1--52
E)337N
O
a�xx
WCD
WU'
�
74io3v~,
U'
33
►°•
00000
o
00
000000000
6
Za
W
Zq ZQF
W W(j�LM
�d
Za
aid
ww
ZIZgi$aa
I
Z�35j
�+Y
Z
zwwwww73wwg
8 Z W
W W
U
W WT
U
,T W, W
CJ
¢
5tuLuz
W O
6
W W
0 0
W W
W W
W W
0 N
W
LL
NNN
Q
LL
N NNNN
f0
f/1NS
NONNN
NfU/77
NVJ
N
G
Z�cW
U
¢
Cc
¢
S�
¢
Z
Z
•
U
Zgg
W
<
T
O
Y
N Q
C-CU
w¢
N
�gg
-
>.R
W�
Cc
V
9
i
s=o
�
3
cr
'
'�
U.
z
CcVWJ
ru
a�inc�=nt�acr5��oo3mY
�
gggg
gg
gga�yy
�^
N
N N
a00000000c�oo�0000000000
¢¢¢¢¢¢¢¢¢
¢¢
¢¢¢¢¢¢¢¢¢¢
Z Z
w W
Z Z
W
Z
Z
Z Z
W
Z Z
W
Z Z
W
Z Z
Z -
Z 2
W
2
Z
�_=
SV�SV
N
TU�TU zVVz
Ng N
zyyz =W=
Ng N
=�=
N
=W=
fn N§
=a=
N
_�= =W=
N N
=a=
N yg
_�=
N 3
=W=
N 5
N
�
�i���i
mmmmmmm
a
CITY OF GEM LAKE
Office of the City Clerk
i 1369 County Road "E" East
Gem Lake, MN 55110-5231
Telephone: ( 651) 426 - 6443
Mobile: (612 ) 812 — 6139
Gu itJay� 6* 6&d
AW96eo `.tla'PW
PUBLIC NOTICE NO.2004-10
DATE: 06 May 2004
FROM: Fritz Magnuson, City Clerk
TO: Press Publications, Legal Publications @ leuls@sherbtel.net
RE: Legal Notice To Be Published
To Whom It May Concern,
Facsimile: (651) 426 — 6444
Email: GemLakeCity@aol.com
The following Legal (Public) Notice is to be published in the Legal Notices Section of the 12 May 2004 edition
of the White Bear Press. Please confirm receipt and verify content is in acceptable form for use.
City of Gem Lake
Public Notice No. 2004-10
NOTICE OF CHANGE OF MEETING
The Gem Lake City Council meeting regularly scheduled for 17 May
2004 has been rescheduled to 7:00 PM on Monday, 24 May 2004, in the first
floor meeting room of Tousley Ford located at 1493 East County Road E in
the City of Gem Lake. This meeting will follow 2 public hearings scheduled
for the same time, date and location.
Ss//Frederic C. Magnuson, City Clerk
�J
CITY OF GEM LAKE
RESOLUTION NO.2004-04
24 May 2004
Whereas, McNulty Construction and Hillary Farms, LLC have submitted an application and payment related thereto for
subdivision of lands hereinafter refers-ed to as Hillary Farm in accordance with Plan B-2 last revised on 29 April 2004; and,
Whereas, said application has been deemed complete by the City Clerk in accordance with the requirementsof Ordinance No.
58 the "Subdivision Ordinance," and,
Whereas, said application and attendant submissions have been reviewed by the Gem Lake Planning Commission, City Council,
Zoning Administrator, City Engineer and City Attorney as well as the public at large.
Resolved, on Motion by Councilor Watson and Second by Councilor Birkebak to approve the Preliminary Plat entitled Hillary
Farm, Plan B-2 as prepared by Anderson Engineering of Minnesota, LLC certified 29 April 2004 (the "Plat") together with a
Rezoning of Lot 29 to R-3 Residential (36,000 s.f. minimum) with Final Plat approval and a Variance from the R-1 Residential
(3.0 acre minimum) lot size requirements as shown in Table A below, also effective with Final Plat approval, and construction
of a municipal sanitary sewer system for the entire project, all based upon the Findings of Fact contained herein and subject to
certain Conditions of Approval also contained herein, is approved by the following vote:
NAME
EMEOTT
WATSON
BIRKEBAK
IGO
BOSAK
I
VOTE
Aye
Aye
Aye
Aye
Aye
TABLE A
LOT #
LOT SIZE
VARIANCE
LOT #
LOT SIZE
VARIANCE
8
2.52 acres
0.48 acres
18
2.09 acres
0.91 acres
9
2.59 acres
0.41 acres
19
2.00 acres
1.00 acres
10
2.71 acres
0.29 acres
21
2.19 acres
0.81 acres
11
2.61 acres
0.39 acres
22
2.51 acres
0.49 acres
12
2.20 acres
0.80 acres
23
1.80 acres
1.20 acres
13
2.23 acres
0.77 acres
24
2.62 acres
0.38 acres
14
1.87 acres
1.13 acres
26
2.77 acres
0.23 acres
15
1.85 acres
1.15 acres
27
2.31 acres
0.69 acres
16
2.03 acres
0.97 acres
28
2.72 acres
0.28 acres
17
2.43 acres
0.57 acres
FINDINGS OF FACT
1. That the Variance from the 3.0 minimum lot requirement for lots shown in Table A continues to provide for an average
density of Lots 1 through 28 at or near the 3.0 acre minimum as an average given many lots are greater than the minimum and is
necessary to address special needs for providing City owned and operated sanitary sewer to the entire Hillary Farm development
based upon the formal recommendations of the Vadnais Lake Area Water Management Organization and the City Engineer and
a hardship would result if potential environmental damage to the body of water known as Gem Lake and its attendant waters
occurred as part of the intense development of Individual Sewage Treatment Systems (ISTSs).
2. The unique character of the property requires variances so that valuable natural resources such as Gem Lake and various
wetlands on the property are protected beyond the requirements of City Code;
3. The granting of the variances will allow the Developer to maintain the Bemis Estate house which is important to the character
of the community;
- 1 -
4. The granting of the variances will allow the developer to protect and preserve beyond the requirements of City Code natural
amenities such as trees and wetlands on the property;
5. City required amenities such as paths, view easement and open space require the granting of variances to allow the reasonable
development of the property;
6. The City desires that the project be served by sanitary sewer which is not otherwise a requirement of the R-1 zoning district.
Without variances it is not reasonable to develop the property with sewer.
7. That the Rezoning of Lot 29 is consistent with the zoning of immediately adjacent properties on the west side of Scheuneman
Road and the entire east side of Scheuneman Road.
8. That the creation of a private way within the development maintained solely by the benefitted residents is consistent with the
Comprehensive Plan, the Subdivision Ordinance and previous subdivisions approved within the City.
9. That the maintenance requirements of a private way serving a large number of properties necessitate the inclusion of use and
maintenance covenants in the declarations to be filed against the property by the Developer.
10. That the Plat is consistent with the City's Comprehensive Plan and addresses certain unique and historical issues relating to
past subdivisions within and adjacent to the Plat.
11. That the Developer in concert with the Gem Lake Planning Commission, City Council and members of the community have,
through their collective input and effort, created a subdivision consistent with the best interests of the City.
12. That the Developer's Agreement and Plan B-2 address, in essence, the historical density, large lot dimensions, cluster
consideration, and environmental preservation issues which further the City's Comprehensive Plan.
Further resolved, that the Gem Lake City Council approves McNulty Plan B-2 for Hillary Farm upon the following
understandings and agreements and subject to the following conditions:
1. The Plat shall be subject to a Declaration inform and substance satisfactory to and approved by the City Attorney which shall
-� be filed for record with the County Recorder of Ramsey County, Minnesota, immediately after recording of the Plat (the
"Declaration"). The applicable conditions described below shall be included in the Declaration.
2. All interior wetlands shall be protected by such buffers with permanent monuments delineating the boundary as required by
the Watershed District permit.
3. The scenic easement between Lots 6 and 7 shall be maintained by the affected lot owners and will not be released except with
written permission of the HOA. The owner of Lot 1 shall have the right to specifically enforce this easement.
4. The road crossing in front of Lots 6 and 7 between the estate house and Gem Lake shall be built as described in the plans or
otherwise depressed so that the road itself cannot be seen from across the lake. This restriction will not screen cars that may be
traveling on the road.
5. The City Code shall govern as to structures allowed on the island adjacent to Hillary Farm mainland.
6. No access to the lake shall be granted to any non -riparian lot in the Hillary Farm addition.
7. Concrete surmountable curbs as shown in the plans entitled B-2 Submittal prepared by Anderson Engineering of Minnesota,
dated April 29, 2004 sheets 1 through 6 shall be required along the road in the areas in which drainage from the road can be
expected to flow into interior wetlands so that such drainage is conducted first to settling ponds.
8. Aluminum or vinyl lap siding shall be prohibited in the HOA documents. Aluminum or vinyl maybe used for fascia or soffits.
No metal accessory buildings shall be allowed.
9. The location of all structures on the lots shall be subject to City site plan review and approval.
10. All utilities serving the Plat shall be buried.
— 2 —
1 1. The access easement serving Lot 2 shall be located so as to allow a buffer line of trees along its easterly side. Such a buffer
may be supplemented by trees from the tree bank created as described below.
12. An onsite tree bank will be created based upon the trees removed in the development in excess of the amount allowed by the
City tree ordinance and the location of the plantings from the tree bank shall be subject to approval by the City.
1 13.No phosphorous fertilizer as regulated by state law shall be allowed to be used within one -hundred (100') feet of the lake.
14. Requirements listed in City Engineer's report dated 24 May 2004 shall be complied with except as addressed and or modified
by this Resolution.
15. Requirements listed in Zoning Administrator's report shall be complied with except as addressed and or modified by this
Resolution.
16. Entry monuments at each entry shall be allowed as submitted with subtle lighting as approved by the Zoning Administrator.
17. The lots covered by note 5 on Sheet 6 shall be 2-7 rather than 9-13.
18. The internal road shall be twenty (20') feet wide with a shoulder as approved by the City Engineer.
19. Outlet structures at all detention ponds shall be substantially covered on their sides by ground so as not to be obvious.
20. Hours of work shall be lam to 7pm, Monday through Saturday, with exceptions to be allowed under special circumstances
as determined by the zoning administrator.
21. The barn maybe remodeled and used as a sales office and storage facility during the period of sales activity. Prior to issuance
of a demolition permit for the barn, the Developer shall cooperate with the City in preserving the building as a historical building
to be relocated to another site.
22. Building permits (but not certificates of occupancy) maybe granted to the developer in advance of completion of sewer and
road work. Any construction done by Developer prior to recording of the Final Plat shall be at the risk of the Developer.
�23. The Final Plat shall include a 20 foot wide sewer easement for possible extension to serve property to the northwest at a
location along a lot line between Lots 9 and 10.
24. Developer shall install a four (4') foot wide blacktopped trail adjacent to the main roadway at selected locations to be
determined by Developer.
25. On the Final Plat Developer shall dedicate to the City a sewer easement in form acceptable to the City. Developer shall
guarantee and cause any contractor who does work on the sanitary sewerto guarantee the workmanship and materials of the sewer
for a period of one (1) year. All warranties regarding the sewer shall be transferred to the City upon transfer of title to the sewer.
26. A Certificate of Survey for each lot with exact dimensions of the lot, the structures on the lot, the setbacks to the established
for each lot, the tree inventory, the slab elevation and first floor elevation of the proposed house must be provided prior to
receiving a building permit on each lot.
27. No lot in the Plat shall be further subdivided regardless of any minimum acreage requirements contained in present or future
City ordinances.
28. The City's fees, costs, disbursements and reasonable attorney's fees incurred in connection with project review shall have
been paid in full by the Developer within thirty (30) days of presentation to the Developer of an invoice for said costs,
disbursements and fees.
29. Developer shall complete any utility work in Scheuneman Road which is directly related to providing service to the project.
30. All sanitary sewer services shall be approved by the City Engineer.
J31. Occupancy permits shall not be issued until the installation of at least the first lift of bituminous on the permanent street, and
completion of, sewer, other utilities and curbs.
- 3 -
32. Developer's Engineer shall certify to the City that the construction of the sewer and other utilities and roads meet the
requirements ofthe approved plans and specifications upon completion and as a condition of acceptance by the City ofthe sanitary
sewer. Developer will provide both hard shell Mylar and electronic "as built" plans for the sewer system and shall televise the
sewer after completion, giving the pictures and tapes to the City Engineerto confirm that the sewer has been properly constructed.
33. Developer shall pay the cost of the City Engineer to observe the construction of the sanitary sewer within theHillary Farm
Development to the extent that the City Engineer deems appropriate. Developer shall furnish the City Engineer with a schedule
of proposed operations at least five (5) days before the commencement of construction on each major phase of the project.
34. Developer shall name the City as additional insured on contractor's commercial general liability insurance policies as the City
Attorney shall require.
35. The Developer must proceed with the development of the project within (1) year of approval of the Final Plat and the
Developer must submit the Final Plat for approval by the City within six (6) months after passage of this Resolution consistent
with the approved Preliminary Plat and Final Plat requirements or the subdivision approval shall become null and void Ifthe Final
Plat varies significantly from the Preliminary Plat, then Planning Commission review and comment and City Council approval
shall be required.
36. Within sixty (60) days after the final approval by the City Council, the applicant must record the Plat with the County
Recorder of Ramsey County, Minnesota, or the subdivision shall become null and void
37. Construction permits maybe issued for improvements on this subdivision site prior to final approval and recording ofthe Plat,
provided however the issuance of such permits and construction of such improvements shall beat the sole risk of the Developer
in the event final plat approval is not granted.
38. All utility easements as shown on the Preliminary Plat or as approved by the City Attorney shall be dedicated.
39. Final Plat approval is conditioned upon the installation and funding of sanitary sewer to serve the Hillary Farm development
and adjoining property to the City's satisfaction along Scheuneman Road.
40. Upon passage of this Resolution Developer shall withdraw all other plans submitted to the City for the development of the
property.
ATTEST
1. Frederic C. Magnuson, the duly qualified City Clerk of the City of Gem Lake, County of Ramsey, State of Minnesota, do
hereby certify that the foregoing Resolution is a true and accurate representation of action taken by the City Council of the City
_ r � _.v i ,.I,,. ,.« 4L. o Al +o F—IF 4t—
J l 'J em, L0.Ac on — — 1 a
,m- w,e c �r . �4�rL 24 Ay 2004
Frederic C. Magnuson, City Clerk
Certif ieb Coo
1Ja LC
e-file: resolution\2004\no2004-04
-- 4 -
May 24, 2004 RE: City of Gem Lake, MN
Hillary Farms Subdivision - Preliminary
Plat Review
SEH No. A-GEMLK0401.00
1-lonorable Mayor Paul Emeott and
City Council
City of Gem Lake
1300 Goose Lake Road
Gem Lake, MN 55110-5231
Dear Mr. Hoeschler:
We have reviewed the recent submittal for the Hillary Farms Subdivision known as Plan B-2 Preliminary
Plat submittal. The information received included a Preliminary Plat, Grading Drainage & Erosion
Control Plan, Utility Plan, Street Profile and Cross Sections, Preliminary Tree Preservation Plan, Storm
Water Management Calculations. We have assumed that the Wetland Delineation Report, Wetland
Mitigation Plan, and Wetland Permit Application that have been submitted with previous concepts will
also apply to this one. The following are our comments as they pertain to this submittal:
General Comments
1. Final design shall include the submittal of soil boring results and geotechnical report along with
design recommendations relative to the findings. As a minimum, this would include borings for
the streets and utilities, R value for pavement design, pavement subgrade recommendations,
pavement design, bearing pressures for homes and other structures, lateral earth pressures,
groundwater levels, recommendations for excavations and fills, and recommendations for
bedding/installation of buried utilities. Pavements must meet or exceed the requirements of a
Mn/DOT 7-ton pavement. The geotechnical report must be signed by a geotechnical engineer
licensed in Minnesota, and may need to address additional issues that the geotechnical engineer
deems necessary.
Preliminary Plat
1. Show lot widths at setback lines.
Grading Drainage and Erosion Control Plan
I. Refine the Grading Plan to include some type of conceptual proposed lot grading that relates to
the building minimum elevations to solidify proposed drainage boundaries.
2. The impact of the flow leaving the site between building pads 19 and 29should be considered in
detail. Consider building locations/impervious areas with regard to the flow/velocities in the
proposed swale. This flow could cause erosion or temporary ponding on the adjacent property
that currently doesn't exist.
3. The City should be advised that graded swales such as the one shown between building pads 19
and 20 are probable in other areas even though they are not shown on the Grading Plan. If
allowed, future custom grading should be carefully scrutinized.
Mayor Emeott and Council
May 24, 2004
Page 2
4. The calculations were reviewed and are reasonable with respect to the grading plan.
5. Discharge to between lots 19 & 29 needs further evaluation of impacts to the golf course
property. If this option is approved, the City Engineer and the developer's engineer should
discuss options such as energy dissipation measures for avoiding impacts to adjacent property.
6. Label emergency overflow elevations and HWLs for all ponds, basins and depressions. In
particular Basin E and the existing depression west of Lot 11 have the potential for causing
basement flooding on lots 25 and I respectively. Lowest openings must be 2-feet above
adjacent HWLs.
7. Overflow to be constructed on Lot 5 shall be located to fit the topography. At a field visit on
May 20, 2004 (present; Mayer Emeott, John Parotti - SEH, Roger Anderson — Anderson
Engineering, and Gary Johnson — Anderson Engineering) it was discovered that the existing
contours at this location might not be entirely accurate. The overflow shall be constructed in the
location as was identified at this meeting and shall be constructed to minimize tree loss. Any
change to location or impact shall require review and approval by the City prior to construction.
Street Profile and Cross Sections
1. Revise curb and gutter locations to provide adequate protection of existing wetlands.
2. Drain tile may be required. Geotechnical investigation and recommendations shall address the
possible need for drain tile.
3. Recent developments in the City have constructed wider pavement widths than being proposed in
this submittal. It is recommended that this development be required to construct a minimum 20-
foot pavement width with 2-foot shoulders. The following table provides a summary of the
proposed street width with those approved in the Hunter's Run and Blue Spruce developments.
Development Pavement Width Shoulder Width
Hunter's Run 20-feet 2-feet
Blue Spruce Estates 24-feet 0
Hillary Farm B-2 18-feet 1-foot
Utility Plan
I. The final plat shall include 30-foot (min.) sanitary sewer easement or within street and utility
easements that provide a minimum of 15-feet of easement either side of all sanitary sewer mains.
Wider easements may be required where sewer depth makes it necessary.
Wetland Permit Application
Review comments by Todd Udvig, SEH Sr. Wetland Scientist
SEH did not receive a wetland permit application with this packet. However, it appears (and will be
assumed) that the permit application received with the Concept B plan submittal would also be
applicable to the Concept B-2 plan and has been reviewed as such. The following comments were
generated for earlier reviews and SEH has not been copied on all correspondence with VLAWMO.
The following may be satisfied with supplying SEH with documentation relative to recent VLAWMO
action or approvals.
I. There is no second alternative design as required. The permit description is not adequate.
2. Applicant must provide additional information with respect to the hydrology of the new wetland.
Is there enough hydrology to sustain the new wetland? Will the new wetland hydrology be
groundwater or surface water supplied?
3. The sequencing discussion needs to address avoidance and minimization as required. What
methods, design, etc. were incorporated to avoid and minimize wetland impacts?
Mayor Emeott and Council
May 24, 2004
Page 3
4. The Wetland Conservation Act requires 5 years of monitoring, not 3 to 5 years. The Technical
Evaluation Panel has the option to review a site and approve it as successful prior to the 5-year
period.
SEH recommends that the above comments be addressed and written responses be received to facilitate
the completion of our review. Any questions with respect to this review can be directed to me or directly
to the reviewer as noted above_
Sincerely,
SHORT ELLIOTT HENDRICKSON INCJ
John D. Parotti, PE
City Engineer
c: Mayor Paul Emeott, City of Gem Lake
Fritz Magnuson, City Clerk, City of Gem Lake
Todd Udvig, SEH
Paul Hegre, PE, SEH
AJ Schwidder, PE, SEH
.:Ulgcw kUMOI(KAcmra4cvicvlu7L:,, I —,., i 52All.duc
0
W"
Commentt MLEfETHIS UNE W
THIS 1S A I -PAGE LETTER
McNulty request for Hillary Farm subdivision
City of Gem Lake, MN
Preliminary Plat for Option B-2
Zoning Administrator plan review of 5/1 to 5/3/04
The following were provided for this Option B2 plan review:
Hillary Farm Concept B-2 pictorial view of subdivision — Dated 4/29/04
Preliminary Plat, Sheet 1 of 6, Dated 1/9/04,. with revision 1,2,3 & 4
Grading, Drainage, Erosion Plan, Sheet 2 of 6, Dated 1/9/04,. with revision 1,2,3 & 4
Street Profile and Cross Sections, Sheet 3 of 6, Dated 1/9/04,. with revision 1,2,3 & 4
Preliminary Utility plan, Sheet 4 of 6, Dated 1/9/04,. with revision 1,2,3 & 4
Preliminary Tree Preservation Plan, Sheet 5 of 6, Dated 1/9/04, with revision 1,2,3 & 4
Preliminary Shoreland Impact Plan, Sheet 6 of 6, with revisions 1,2,3 & 4
Stormwater management calculations Plan B-2 , by Anderson Eng, Dated 4/29/04
General comments and questions
1) The North entrance road, from this proposed subdivision, comes at an angle and a
location that the headlights from the vehicles leaving this driveway will shine into the
windows of both the Goff home and the Meyer Home on the east side of Schuneman
Rd. (See photo attached for view from end of road to houses across the road) This
North entrance road must be re -aligned to line up with a driveway, across the
road, or to the empty lot between the Meyer home and the Strommer home. This
can be done by "kinking" the road to the south instead of the north near to its
terminus to Schuneman Rd.
2) Along the sides of the interior roads, concrete curbs have to be supplied, in some
areas, to insure that snowplow damage to road edges and shoulder areas immediately
adjacent to the wetlands and stormwater ponds does not cause storm water to proceed
directly into the wetlands. The supplying of some such curb is shown, on the
preliminary plat drawings. It is shown to be provided on the interior road from sta.
25+30 to 32+50. The area from 24+50 to 25+30 also needs to be protected
(Stormwater Pond 60P). Additional concrete curbs will also be needed on the west
side of the road from Sta. 15+00 to 17+50 (Stormwater pond 41P) and on both sides
of the road from sta. 1+00 to 5+00 (Stormwater pond 11P and 10 P and Basin D). The
primary purpose of these curbs is to prevent damage to the un-protected roadside by
snow plowing and other road maintenance activities that would direct storm water into
the wetlands and ponds in a manner not planned for in the design of the stormwater
handling facilities.
3) Please provide an updated copy of the "customary restrictive covenants, and
homeowners association rules" for review by the Zoning Administrator. I already
have a list of concerns from the preliminary copy of this document supplied with the
first plat submittal.
(McNultyplanb2review) Page 1 of 4 5/3/04
or the entry
4) Please provide information on the exact size of the easement needed f
monuments proposed at the North and South driveways. The preliminary plat shows
an area 20 feet wide and 40 feet deep on either side of the driveways and the "entry
signage and Landscaping" drawing provided shows an area 40 by 40 foot. Will the
homeowners association be responsible for the long term maintenance of these areas
(this needs to be included in the Homeowners Association rules).
5) Who is responsible for capping the well at the caretakers home site and for obtaining
the "changeover permit" for the septic system to public sewer for Lots 1 & 14 ?
6) It is not completely clear that there is a drainage path from Stormwater pond 60P thru
Basin G to the proposed outlet at Gem Lake (there seems to be a rise in land just
before the lake edge). Are the ground elevations suitable to have this drainage work ?
7) Do the calculations for Stormwater Pond 60P include the water from Stormwater
Pond 41P in its Inflow calculations ?
8) On Drawing 4 of 6 (Preliminary Utility plan) examine the locations of the proposed
sewer stubs to lots 9 & 10. ( See items 4 & 5 in next section for concerns).
Lot specific comments and questions
1) Some sort of a narrow no -cut restriction (or buffer strip re -planting guidelines) needs
1 to be placed along the easternly boundary of lot 2 & 3 to keep some vegitation in
place to act as a buffer to the Draine home immediately to the east of this driveway. If
the entire 33 foot driveway easement to lot 2 were cleared, any existing buffer would
disappear.
2) 2) Some sort of a no -cut guideline needs to be placed along the easternly boundaries
of lots 24 & 28 to keep the buffer along Schuneman Rd intact and to in -fact
encourage the lot 24 & 28 owners to increase the buffers along Schuneman Rd.
3) Is the two foot level elevation difference between the HWL of Basin D - pond 1 OP
and the basement elevation of the proposed house on Lot 20 of 946.0 ft adequate to
eliminate any problem with basement flooding? This house pad is shown only about
50 feet from the edge of the pond on the preliminary plat but is shown closer to the
road loop (and thus further away from the pond edge) on the pictorial view.
4) Is the two foot level elevation difference between the HWL of Basin G and the
basement elevation of the structure on Lot 4 of 954.0 ft adequate to eliminate any
problem with basement flooding of the proposed house on this lot ? This house pad is
shown only about 50 feet from the edge of the basin and overland outlet to the lake on
the preliminary plat.
(McNultyplanb2review) Page 2 of 4 5/3/04
5) The house placement and driveway connection for Lot 9, on the pictorial Concept B2
drawing, is much better than what is shown on the preliminary plat. (the pictorial
location provides more isolation from the neighbors to the West). Its final location
also does change the interior sanitary sewer layout. Which location is to be preferred
? Which view (pictorial or plat) will the prospective house buyers be shown to help
them decide where to place their house. Where will the sewer stub be placed
(which will define where this house will be placed) ?
6) The house placement and driveway connection for Lot l0,on the pictorial Concept
B2 drawing, is better than what is shown on the preliminary plat. Its final location
also does change the interior sanitary sewer layout. Which location is to be preferred
? Which view (pictorial or plat) will the prospective house buyers be shown to help
them decide where to place their house. Where will the sewer stub be placed
(which will define where this house will be placed) ?
7) What restriction will be provided on Lot 5 to keep the island from having a structure
constructed on it ?
8) A note should be added to the Lot 1 & 14 locations to advise who is to do the
existing septic system abandoments.
9) The notes on drawing 2 of 6, regarding the protected easement for the drainfield
location to the rear of the Rudisel home along Schuneman Rd, are inconsistent. One
note on this drawing says to protect this easement and the other note says that it will
be vacated. Homeowner of Rudisel home also needs easement to enable service on
his well, which at the rear side of his property. Has any arrangement been made to
resolve these issues ?
10) The note on Lot 11 saying "20 foot driveway easement:" is not needed.
Paul Emeott
Co -Zoning Administrator (plan reviews)
(McNultyplanb2review) Page 3 of 4 5/3/04
�:�-7'^ =.tom,+` ;.LWi
_ _�..� .!'�� � .Y�,��•jjg�.-,;,�-:!'.c...sc- "^'."'�a.''I
Questions for Gem Lake Planning commission
1) Is there a need for the subdivider to plant "boulevard trees" on lots that have no
existing trees? Block 1, lots 11 thru 21 have no trees. Subdivision ordinance requires
such trees.
2) Define restrictions for construction of any structure on the upland 49,526 sq ft (over 1
acre) of land (island) attached to proposed Lot 5 and located in the body of water
called Gem Lake. Should this be a conservation easement.
3) Lot 2 has no frontage on a road. How do we define this ? What should be the
described as the "front "yard of this structure ?
4) How faithful to our Comprehensive plan is this proposed subdivision ?
5) It is important that we consider the building height when homes are constructed in a
mixed zoning area (R1— 35 foot maximum building height & R2 with 25 foot
maximum building height). How are we going to handle this in this subdivision ?
What about a building height limitation for the house on the 36,000 sq ft lot on Lot 29
Paul Emeott
Co -Zoning Administrator (plan reviews)
(McNultyplanb2review) Page 4 of 4
5/3/04
McNULTY CONSTRUCTION COMPANY
400 SECOND AVENUE SOUTH
MINNEAPOLIS, MINNESOTA 55401
612-339-0674
FAX 612-349-2904
May 24, 2004
Mayor and Members of the City Council
City of Gem Lake
1369 County Road E
Gem Lake, MN 55110-5231
Re: Hillary Farm Development
Dear Mayor and Members of the City Council:
Please be advised that upon approval on May 24, 2004 by the City Council of the
preliminary plat for Plan B-2 as submitted that McNulty Construction Company and
Hillary Farm, LLC withdraw the applications for all prior plans for the development that
have previously been submitted including Plans B, D and G.
Sincerely,
z
MCNULTY CON RUCTION COMPANY
R. la s McN Ity,
Pr i, nt
J
CITY OF GEM LAKE
RESOLUTION NO.2004-05
24 May 2004
A RESOLUTION OF THE CITY OF GEM LAKE, MINNESOTA
ODERING CERTAIN PUBLIC IMPROVEMENTS.
WHEREAS, the City of Gem Lake, Minnesota (the "City") has received the request of McNulty Construction Company
(the "Developer") for the development of certain real property within the corporate limits of the City for the purposes of
constructing a development of approximately 29 single family homes (the "Development"); and
WHEREAS, the preliminary plan for the Development is known as the Hillary Farm Plan B-2 (the "Preliminary Plat"); and
WHEREAS, the majority of the homes in the City currently operate septic systems and are not connected to the metro sanitary
sewer system and certain existing homes in the City have septic systems that are failing or will fail in the near future; and
WHEREAS, as part of the City's review and approval process for the Development and the Preliminary Plat, the City is requiring
that the Developer connect the homes in the Development to the metro sanitary sewer system; and
WHEREAS, the main sanitary sewer line for the Developmentwill be constructed under Scheuneman Road and there are other
homes in the City abutting Scheuneman Road that will benefit form the construction of the sanitary sewer line under Scheuneman
Road and being connected to the metro sanitary sewer system; and
WHEREAS, the construction of the sanitary sewer system for the homes abutting Scheuneman Road leading up to the
Development and in the Development is hereinafter referred to as the "Improvements"; and
WHEREAS, Short Elliott Hendrickson Inc. ("SEH"), as City engineer and consultant to the City with respect to the
Improvements, has prepared a feasibility study for the Improvements and conducted other analysis related to the Improvements
(the "Feasibility Report"); and
WHEREAS, the City Council of the City of Gem Lake on this date held public hearings on the Preliminary Plat and the
/1 Improvements (the "Hearing"); and
WHEREAS, ten (10) days mailed notice and two (2) weeks published notice of the Hearing was given to affected homeowners
and the Developer and a reasonable estimate of the impact of the assessmenet for the Improvement was made available at the
Hearing; and
WHEREAS, the Feasibility Report was available for review at the Hearing; and
WHEREAS, all affected homeowners and persons who desired to be heard with respect to the proposed Improvements were given
an opportunity to be heard.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GEM LAKE AS FOLLOWS:
1, The Improvements are necessary, cost-effective and feasible as described in the Feasibility Report prepared by SEH.
2. The total estimated cost of the Improvements is $600,000.
3. The Improvements are hereby ordered.
4. SEH is hereby designated as the engineer for the Improvements. SEH shall prepare plans and specifications for make of the
Improvements. Kennedy & Graven, Chartered is hereby designated as special counsel to the City with respect to the
Improvements.
The foregoing Resolution was offered by Councilor Birkebak and was supported by Councilor Watson and was
declared adopted based upon the following vote:
NAME
EMEOTT
J WATSON
BIRKEBAK
[GO
BOSAK
VOTE
Aye
I Aye
Aye
Aye
Aye
ATTEST
I, Frederic C. Magnuson, the duly qualified City Clerk of the City of Gem Lake, County of Ramsey, State of Minnesota, do
hereby certify that the foregoing Resolution is a true and accurate representation of action taken by the City Council of the City
of Gem Lake on the date first written.
e ,i
Frederic C. Magnuson, City Clerk
t�
&rtif ieb CoN
Date
e-file: resolution\2004\no2004-05
CITY OF GEM LAKE
RESOLUTION NO.2004-06
24 May 2004
A RESOLUTION AMENDING RESOLUTION NO. 1993-07 REGARDING GEM
LAKE'S PARTICIPATION IN RAMSEY COUNTY FUNCTIONAL
CONSOLIDATION OF ROADWAYS BY ACCEPTING CERTAIN PORTIONS
OF THE PROPOSED ROADWAYS AND AMENDING THE CONDITIONS OF
SUCH AN ACCEPTANCE.
WHEREAS, The 1991 Minnesota Legislature established a Ramsey County Local Government Services Study Commission
to ,report on the advantages and disadvantages of sharing, cooperating, restructuring, or consolidating..." activities in areas
of public service including public works; and
WHEREAS, the Gem Lake City Council did by means of Resolution No. 1993-07 agree to accept ownership of certain
Ramsey County roadways in the City of Gem Lake subject to certain conditions: and
WHEREAS, The consolidation plan provides for reclassification of roadways and corresponding changes in jurisdiction
including the transfer of local and State Aid roadways between the County and municipalities; and
WHEREAS, Scheuneman Road (County Road 147) from Otter Lake Road to Trunk Highway 61, located in the City of
Gem Lake, is presently under the jurisdiction of Ramsey County as a County Road; and
WHEREAS, This roadway has been determined to serve a local function only; and
WHEREAS, Revocation of "County Road" status may be accomplished by resolution of the Ramsey County Board of
Commissioners pursuant to Minnesota Statutes § 163.11; and
WHEREAS, It appears to the City Council of the City of Gem Lake that the street hereinafter described upon tumback
from Ramsey County should be designated a City Street under the provisions of Minnesota Law; and
WHEREAS, The consolidation plan stipulates that Ramsey County shall improve the roadway to acceptable levels prior to
transferring jurisdiction over roadway segments from Ramsey County to municipalities, and the Ramsey County Capital
Improvement Program provides funding for these improvements; and
WHEREAS, The City of Gem Lake desires to reconstruct Scheuneman Road from Otter Lake Road to Trunk Highway 61
and fund the reconstruction project with Municipal State Aid Street sources, and $170,000* from Capital Improvement Funds
for Ramsey County Roadway Consolidation; Now, Therefore, Be It
RESOLVED, The City of Gem Lake does hereby concur with the Ramsey County Board of Commissioners revoking the
"County Road" status of Scheuneman Road (County Road 147) from Otter Lake Road to Trunk Highway 61, and transferring
jurisdiction over this roadway to the City of Gem Lake, effective after the Ramsey County Office of Budgeting and
Accounting has encumbered the funds necessary to fund this reconstruction project, and after the County is in receipt of an
adopted resolution from the City of Gem Lake concurring with the County revoking the "County Road" status of Scheuneman
Road from Otter Lake Road to Trunk Highway 61; and Be It Further
RESOLVED, That the County will pay to the City as just compensation for this jurisdiction transfer, $170,000* for the
reconstruction of this segment of Scheuneman Road; and Be It Further
RESOLVED, The Gem Lake City Clerk is authorized within the limits of this resolution to take actions necessary to have
the identified jurisdiction change executed; and Be It Further
RESOLVED, The City Of Gem Lake recognizes that additional consideration of other Ramsey County roads originally
included as part of Gem Lake's Resolution No. 1993-07 remain subject to terms and conditions as previously established and
as may be modified by the City Council in the future.
* This amount is a preliminary estimate
The foregoing Resolution was offered by Councilor Watson and was supported by Councilor Bosak and was
declared adopted based upon the following vote:
NAME
EMEOTT
WATSON
BIRKEBAK
IGO
BOSAK
VOTE
Aye
Aye
Aye
Aye
Aye
ATTEST
I, Frederic C. Magnuson, the duly qualified City Clerk of the City of Gem Lake, County of Ramsey, State of Minnesota,
do hereby certify that the foregoing Resolution is a true and accurate representation of action taken by the City Council of the
City of Gem Lake on the date first written.
4„ 24 ✓dlay zoos
Frederic C. Magnuson, City Clerk
(fertif ieb CoPB
Date
e-file: resolution\2004\no2004-06
CITY OF GEM LAKE
RESOLUTION NO.2004-07
24 May 2004
RESOLUTION DECLARING THE OFFICIAL INTENT OF THE CITY OF GEM
LAKE, MINNESOTA TO REIMBURSE CERTAIN ORIGINAL EXPENDITURES
FOR GOVERNMENTAL PURPOSES FROM THE PROCEEDS OF TAX-
EXEMPT BONDS TO BE ISSUED BY THE CITY OF GEM LAKE, MINNESOTA
AFTER THE PAYMENT OF SUCH ORIGINAL EXPENDITURES
WHEREAS, Treasury Regulations, Section 1.150-2 (the "Reimbursement Regulation"), promulgated pursuant to
Section 150 of the Internal Revenue Code of 1986, as amended (the "Code"), provides that the allocation of the proceeds of
tax-exempt bonds to expenditures for governmental purposes originally paid from a source other than such tax-exempt bonds
will be treated as expenditures of such tax-exempt bonds only if certain requirements of the Reimbursement Regulation are
satisfied by the issuer of such tax-exempt bonds; and
WHEREAS, the City of Gem Lake, Minnesota, a statutory city and a political subdivision of the State of Minnesota
(the "City"), expects to incur certain original expenditures for governmental purposes to be financed temporarily from sources
other than the proceeds of tax-exempt bonds and which are expected to be reimbursed from the proceeds of one or more
series of tax-exempt bonds;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GEM LAKE AS
FOLLOWS:
1. The City has a reasonable expectation (within the meaning of Treasury Regulations, Section 1.148-1(b))
that it will make expenditures for the projects generally described in EXHIBIT A attached to this resolution (the "Projects").
The City has a reasonable expectation that it will issue one or more series of tax-exempt bonds (the "Bonds") for each of the
Projects in the estimated maximum principal amounts set forth in EXHIBIT A and that it will make reimbursement allocations
with respect to such original expenditures from the proceeds of such Bonds.
2. The City Clerk is authorized to designate appropriate additions to EXHIBIT A in circumstances where time
is of the essence, and any such designation shall be reported to the Council at the earliest practicable date and shall be filed
with the official books and records of the City as provided in Section 3.
3. This resolution shall be maintained as part of the books and records of the City at the main administrative
office of the City, and shall be continuously available during normal business hours of the City on every business day of the
period beginning not more than thirty days after adoption of this resolution and ending on the last date of issue of any Bonds
issued to reimburse expenditures described in EXHIBIT A.
4. This resolution has been adopted not later than sixty (60) days after payment of any original expenditure to
be subject to a reimbursement allocation with respect to the proceeds of Bonds.
5. All reimbursement allocations with respect to the Bonds will be made not later than eighteen (18) months
after the later of: (i) the date the original expenditure is paid; or (ii) the date the Project is placed in service or abandoned, but
in no event more than three (3) years after the original expenditure.
6. All original expenditures to which reimbursement allocations are to be made constitute: (i) capital
expenditures; (ii) costs of issuance of the Bonds; (iii) expenditures for extraordinary, nonrecurring items that are not
customarily payable from current revenues, such as casualty losses or extraordinary legal judgments in amounts in excess of
reasonable insurance coverage, and for which no reserve is maintained; or (iv) a grant (as defined in Treasury Regulations,
Section 1.148-6(d)(4), as a transfer for a governmental purpose of money or property to a transferee that is not a related party
to or an agent of the transferor with respect to which no obligation or condition is imposed to directly or indirectly repay any
amount to the transferor).
-1-
7. The limitations set forth in paragraphs 4 and 5 of this resolution do not apply to: (i) the costs of issuance of
the Bonds; (ii) an amount not in excess of the lesser of $100,000 or five percent (5%) of the proceeds of the Bonds; or (iii)
preliminary expenditures up to an amount not in excess of twenty percent (20%) of the aggregate issue price of the Bonds that
finance or are reasonably expected by the City to finance the Projects for which the preliminary expenditures were incurred.
The term "preliminary expenditures" includes architectural, engineering, surveying, soil testing, reimbursement bond
issuance, and similar costs that are incurred prior to commencement of acquisition, construction, or rehabilitation of a Project,
other than land acquisition, site preparation, and similar costs incident to commencement of construction.
8. This resolution is an expression of the reasonable expectations of the City based on the facts and
circumstances known to the City as of the date hereof. The anticipated original expenditures for the Projects set forth at
EXHIBIT A and the principal amount of the Bonds set forth in EXHIBIT A are consistent with the City's budgetary and
financial circumstances. No sources other than proceeds of Bonds to be issued by the City are, or are reasonably expected to
be, reserved, allocated on a long-term basis, or otherwise set aside pursuant to the City's budget or financial policies to pay
such Project expenditures.
This resolution is intended to constitute a declaration of official intent for purposes of the Reimbursement
Regulation.
10. No reimbursement allocation of the proceeds of the Bonds to Project expenditures will employ an abusive
arbitrage device (within the meaning of Treasury Regulations, Section 1.148-10) to avoid the arbitrage restrictions or to avoid
the restrictions of Sections 142-7 of the Code.
The foregoing Resolution was offered by Councilor Igo and was supported by Councilor Bosak and was declared
adopted based upon the following vote:
NAME
EMEOTT
WATSON
BIRKEBAK
IGO
BOSAK
VOTE
Aye
Aye
Aye
Aye
Aye
ATTEST
I, Frederic C. Magnuson, the duly qualified City Clerk of the City of Gem Lake, County of Ramsey, State of Minnesota,
do hereby certify that the foregoing Resolution is a true and accurate representation of action taken by the City Council of the
City of Gem Lake on the date first written.
Frederic C. Magnuson, City Clerk
G E 190-02(B WJ)
248040vl
&rtif ieb Cobu
Date
e-file: resolution\2004\no2004-07
-2-
CITY OF GEM LAKE
RESOLUTION NO.2004-08
24 May 2004
A RESOLUTION AUTHORIZING PARTICIPATION IN THE COST
SHARING OF CONSULTANT SERVICES TO THE ONGOING I-35E
CORRIDOR MANAGEMENT STUDY.
WHEREAS, the City of Gem Lake has partially funded and participated in the multi jurisdictional study of the I-35E Corridor: and
WHEREAS, the City of Gem Lake has committed to continue participation as a member in the I-35E Corridor Management Team; and
WHEREAS, the Corridor Management Team will continue to coordinate the ongoing balance of land use and transportation within the
1-35E Corridor; and
WHEREAS, continued consultant services will be required to assist the Corridor Management Team; and
WHEREAS, SEH, Inc. has prepared a scope of services to provide such assistance at a cost to the members in 2004 not to exceed $4,500
for budgeted operations: and
WHEREAS, the Corridor Management Team has proposed cost sharing contributions from the participating local units of government
as follows: the city of Vadnais Heights @ 25.0%; the City of White Bear Lake@ 25.0%; White Bear Township at 25.0%; North Oaks @
18.0%; and Gem Lake @ 7.0%; and
WHEREAS, Minnesota Department of Transportation, Ramsey County and the Metropolitan Council have agreed to provide in -kind
planning and technical services and project coordination through the course of study.
NOW THEREFORE BE IT RESOLVED that the City Council of the City of Gem Lake agrees to contribute funding an amount not to
exceed $315.00 for consultant services from SEH, Inc. for the ongoing I-35E Corridor Management study.
ATTEST
The foregoing resolution was offered by Councilor Igo and was supported by Councilor Watson and was declared adopted on
a unanimous vote of the City Council.
I, Frederic C. Magnuson, the duly qualified City Clerk of the City of Gem Lake, County of Ramsey, State of Minnesota, do hereby
certify that the foregoing Resolution is a true and accurate representation of action taken by the City Council of the City of Gem Lake on
the date first written.
�,�� z11 . zoos
Frederic C. Magnuson, City Clerk
IN
Certli f ieb CoPB
Date
e-file: reso1utions\2004\No2004-08
CITY OF GEM LAKE
RESOLUTION NO. 2004-09
24 May 2004
WHEREAS, Singh Enterprises, d/b/a Hoffman Corner Oil (HCO), has applied for a Retail Tobacco Products Resellers License
for the period 06 April 2004 through 31 December 2004; and
WHEREAS, said applicant has been similarly licensed in prior years in the City of Gem Lake; and
WHEREAS, said applicant operated the establishment with no incidents during 2003; and
WHEREAS, the State OfMinnesota has enacted legislation, reference Chapter227 /H.F. 117, requiring local units ofgovernment
to establish or update local ordinances regulating retail tobacco sales and providing for compliance checks, the cost of which shall
be born by the licensee; and
WHEREAS, the City has a Tobacco Compliance Ordinance No. 68 which became effective 28 February 1998.
NOW THEREFORE BE IT RESOLVED that the City Council of the City of Gem Lake does hereby approve renewal of the
a RETAIL TOBACCO PRODUCTS RESELLERS LICENSE to Singh Enterprises, d/b/a Hoffman Corner Oil (HCO) for the
period 01 April 2004 through 31 December 2004; and
BE IT FURTHER RESOLVED that the City retains the right of revocation at any time in the event of violation of State laws
or City ordinances regarding the retail sale of tobacco products.
The foregoing Resolution was offered by Councilor Igo and was supported by Councilor Birkebak and was declared
adopted based upon the following vote:
NAME
EMEOTT
WATSON
BIRKEBAK
IGO
BOSAK
VOTE
Aye
Aye
Aye
Aye
Aye
ATTEST
I, Frederic C. Magnuson, the duly qualified City Clerk of the City of Gem Lake, County of Ramsey, State of Minnesota, do
hereby certify that the foregoing Resolution is a true and accurate representation of action taken by the City Council of the City
of C:em Take on the date first written.
Frederic C. Magnuson, City Clerk
&rtif ieb (fillobu
Date
e-file: resolution\20Mno2004-09
RAMSEY COUNTY SHERIFF'S DEPARTMENT
CONTRACT COMMUNITIES COMMITTEE
MONTHLY MEETING
MAY 20, 2004
CITY OF SHOREVIEW — COUNCIL CHAMBERS
************8.00 A.M.************
1. Call to Order
2. Approve Minutes of April 15, 2004
3. Approve Agenda
4. Insurance Update
5. 2005 Budget
6. Discussion Regarding Traffic Control
7. 1" Quarter Crime Statistics
8. 800 MHZ Update
9. Other Issues
10. Adj ournment
MINUTES OF A MEETING OF THE JURISDICTIONS
THAT CONTRACT WITH RAMSEY COUNTY SHERIFF'S DEPARTMENT
FOR POLICE SERVICES
MAY 20, 2004
The meeting was called to order at 8:07 a.m.
The following members were present:
➢ George Altendorfer, Ramsey County Sheriff's Department
➢ Roland Birkebak, City of Gem Lake
➢ Joel Hanson, City of Little Canada
➢ Jan Reagan, White Bear Township
➢ Mike Salter, Ramsey County Sheriff's Department
➢ Terry Schwerm, City of Shoreview
➢ Bill Short, White Bear Township
➢ Gerry Urban, City of Vadnais Heights
➢ Michelle Wolfe, City of Arden Hills
APPROVAL OF MINUTES
The amended Minutes of April 15, 2004, were approved as submitted.
APPROVAL OF AGENDA
The agenda was approved as submitted.
INSURANCE UPDATE
Altendorfer reported that the 2004 auto insurance, worker's compensation and
liability insurance rates were underestimated by $14,000.00, and that he will try
to compensate for this amount within the existing budget. He stated that he will
inquire why there was an increase, and report at the next meeting.
2005 BUDGET
Schwerm stated that he will keep this item on the agenda until the middle of the
summer when it will be given formal approval.
It was noted that Crime Prevention needs modification. Altendorfer stated that it
will be incorporated into the budget.
DISCUSSION REGARDING TRAFFIC CONTROL
There was general discussion with regard to the "Unweave the Weave Project",
`� and the additional traffic it is expected to bring to streets in the Contract Group
w
Minutes
Sheriff Contract Group Meeting
May 20, 2004
communities (i.e., Highways 61 & 96, Rice Street, Lexington, Hamline, Labore,
Edgerton, Centerville Road, County Road E).
It was noted that the "Unweave the Weave Project" and related 1-694
improvements could last for up to ten years.
There was concern stated with regard to any other streets within the Contract
Group's communities that are scheduled for construction and the impact this may
have during the freeway construction period.
Schwerm stated concern that local roads are not designed to handle the extra
traffic, i.e., they may not have the correct traffic controls at intersections. He
noted that people may take more chances and more accidents may occur.
Urban stated that he thought it may be best to hire an additional traffic person
during the 3 p.m. — 7 p.m. time period during the week, while the project is
underway, noting that he was not concerned about the weekends. He stated his
idea that the Contract Group is probably not far from adding more traffic deputy
time anyway (noon — 8 p.m.). He noted that there will probably be year-round
traffic delays, and that the Group needs to prepare for it in their budgets. He
stated that he felt that it may be more cost effective to hire retired deputies,
rather than paying overtime.
Schwerm inquired about the Union Contract restrictions, and pension regulations.
AltendorFer answered that he believed that the number is between $11,000 -
$12,000 before pensions are impacted. He stated that there has not been
previous conflict regarding the use of part-time specialized staff. Salter noted
that the Sheriff's Department has a long tradition of hiring part-time people.
It was noted that Kim Klawitter, a retired state patrol officer, who has experience
in freeway issues, may be available for traffic control, and that he has a different
pension, with no salary limits.
Hanson stated that he felt that this could be a way to "phase in" a second traffic
car. He reported that he is also concerned about weekends, noting that
residents will be home and will expect response. He stated that he believes it
would be a good time to discuss a part-time position and also to talk about full-
time.
Schwerm thought that it would be good to budget the money now, so there is not
a huge increase next year. He felt that the Group should discuss the interest
level and the appropriate cost share. Hanson noted that his city will probably
have to assume a higher burden as far as the "Unweave the Weave Project", but
that he expects a normal share after that.
2
Minutes
Sheriff Contract Group Meeting
May 20, 2004
There was discussion with regard to the cost to add another full-time dedicated
traffic person, which is estimated at approximately $100,000.00. Altendorfer
stated that they could start with a used vehicle, than buy a new car in a couple of
years.
Schwerm stated that he keep this matter on future agendas to look into the
options. Altendorfer will put together cost estimates, using a new vehicle and a
used vehicle, and he will also explore the part-time option.
FIRST QUARTER CRIME STATISTICS
Salter distributed the First Quarter Crime Statistics. There was nothing
significant to report. Altendorfer stated that have been no recent major incidents.
Hanson reported that his City Council wants to purchase a portable speed board
as soon as possible, and he asked if any other communities were interested in
purchasing them together for a volume discount. It was reported that there may
be a pole available, with electrical adapters, so the boards can be easily
attached by one person.
Salter reported that he will oversee a mock disaster drill that will take place next
Saturday in Shoreview, near County Road E and the freeway. He explained
that the emergency drill, which is organized through a railroad company, will
simulate major chemical concerns associated with the railroad. He reported that
terrorists and snipers have also been added to the drill. He stated that 30
different agencies will participate, and citizen civil defense volunteers will be
activated, and a simulated neighborhood evacuation will take place. He stated
that the adjacent neighbors have been advised of the event.
800 MHZ -UPDATE
Altendorfer stated that the decision with regard to the communication centers
should be know by next month.
OTHER ISSUES
Salter reported on the recent tobacco compliance checks, noting that three
businesses failed in Shoreview, and two failed in Little Canada.
Altendorfer reported on implementation of the new deputy beginning the first
week in June. He stated that the afternoon deputy will now work from 4:00 p.m.
— midnight, and the midnight deputy from 11:00 p.m. — 7:00 a.m. He stated that
there will be overlapping coverage for this shift change. He stated that the day
shift will begin at 7:00 a.m. and end at 3:00 p.m.
Minutes
Sheriff Contract Group Meeting
May 20, 2004
Schwerm reported that beginning in June, the Lake Johanna Fire Department will
respond to all personal injury accidents.
Urban distributed a copy of the Vadnais Heights Ordinance declaring clandestine
drug labs to be a public nuisance and providing for their removal and clean-up,
and assessing the costs against the property owner. He noted that last year
three meth labs were found in Vadnais Heights.
Wolfe inquired about the billing methods used by Gopher State One, noting that
her city has been charged for locates that are not close to their borders.
Hanson reported that Gopher State One has changed their policy on how they
charge communities, and that that it will take a coordinated effort to change it.
Urban stated that he did not think that a community should pay for locates that do
not occur within their boundary.
Hanson reported on a Retailers Protection Association presentation he attended
regarding a criminal diversion program for worthless checks. He explained that
if a city or law enforcement agency participates in the diversion program, a
merchant or resident who receives a worthless check, and contacts law
enforcement, will be directed to the Retailers Protection Agency, who will take
the check report and begin the process of collecting restitution for the face value
of the check and any bank fees. He reported that there is no charge to the city
or the county to participate, and $5.00 from every check restitution received is
donated to the city or law enforcement agency. Altendorfer stated that the
Sheriff's Department does not see or process many cases related to this matter.
He reported that he reviewed the program with the County Attorney a few years
ago and they were not interested in it because they have their own diversion
program.
ADJOURNMENT
The meeting adjourned at 9:28 a.m.
The next regular meeting will be held on JUNE 17, 2004, at 8:00
A.M. at the CITY OF SHOREVIEW COUNCIL CHAMBERS.
Respectfully submitted,
Jan Reagan
Recording Secretary
JAR/
4
Claims For Payment CITY OF GEM LAKE
Period Ending 05/24/2004
_I
Paul Emeott, Mayor
Chuck Watson, Council
Roland Birkebak, Council
Richard Bosak, Council
Patrick Igo, Council
Frederic Magnuson, Clerk
t
�ti1� : •
,,y,�t�i� (�
' ' ° u
M.i0
DATE
���i
DATE
FCLA1M# PAID PAID TO DESCRIPTION OF CLAIM
CLAIM47
SI' 2038 24-May Me liton Council Current User Charges: June 2004
SP 2039 24-May GEM LAKE GENERAL FUND TOTAL CLAIM _
S AMOUNT
GENERAL
FUND
SEWER
FUND
879.93
879'9'
7,651.65
t,500.00
2,654.00
71.40
SP 2039 24-May
SP 2039, 24-May_
_
SP 2039 24-May
SP 2039 24-May -
SP 2039 24-May
SP 2039 24-May
SP 2039 24-May
Gem Lake General Fund
Gem Lake General Fund
50% Treasurer's Salary _
En 'neeri osts-Scheuneman Road Sewer
g! --- _ -
GopherStateOne-Call:Jan,Feb,Mar,Apr.Mey
AsstClerkGSOne-CallTimeJan-Ma 1.40 hrs)
%�--- -
Administrator's Time: Jan. 2004 (5.25 hrs) -
Gem Lake General Fund
70.00
Gem Lake General Fund
393.75
Gem Lake General Fund
_
Gem Lake General Fund
Administrator's Time: Feb, 2004(1.25 hra)
Administrator's Time: Mar, 2004 (1.25 hrs) _
_
93.7_5
93.75
-
Lake General Fund
Gem
Lake General Fund
Administrator's Time: Apr. 2004 (3.00 hrs)
225.00
2,043.75
SP 2039 24-May
SP 2039 24-May
2039 24-May
Gem _
General Fund
Administrator's Time: May, 2004 (27.25 hrs)
m
Emeott Sewer Feasability/Scheuenan:6.75hrs
-
_
Gem Lake
Gem Lake General Fund
506.25
SP
GP 6411 24-May
GP 6412 24-May _A
GP 6412 24-May
GP 6412 24-May
GP 6413 24-May
GP 64141 24-May
GP 6414 24-May
VOID
VOID
0.00
ALLEN 0. ZEPPER
Allen 0. -
_
TOTAL CLAIM
Plan Check for #132004-08
CommeraiallnspoctionforSinghEnterprires:Deli A ra
Plan Check for #132004-09 _
_ 232.64
157.64
75.00
Allen O. Zepper
Cindy Shilts
783.29
783.29
51.55
20.00
MESLOW & OLSON, PLLC
TOTAL CLAIM
TdConfW/Ramaet dcCi erkReThury(S98X.A
49.00
Meslow & Olson. PLLC
2.55
20.00
GP 6414 24-May
GP 6415 24-May
Meslow & Olson, PLLC
CopieslnRetTo - _
Intergovemmenlal Mtg in February?004
Derek Wippicb
- - 1,101.41
_
GP 6416 24-May
GP 6416 24-May
GP 6416 24-May
GP 6417 24-May _
GP 6418 24-May
GP 6419 24-May
GP 6420 24-May
CITY OF WHITE BEAR LAKE
TOTAL CLAIM
Fire & Paramedic: May 2004 _
Fire Marshall & Inspections: May 2004 _
Curbside ROcyclirlg:Mty 2004
83
Cityof White Bear Lake
47.58
247.
Cityof White Bear Lake
281.30
281.30
E-Z Recycling, Inc.
59.80
59.80
Xcel Energy
Ramsey County
Jim Manteufel _
Street Li tin�April 2004
5,045.19
5,045.19
Law Enforcement: May 2004 -
Commerciall ionforSin terpnses:Deli Ara.
- -- - -
75.00
75.00
2,287.50
) __ _
6,436.00
�_
_
_ _ -
GP G421 24-May _!
GP 6421 24-May
GP 6421 24-May
GP 6421 24-May
GP 6422 24-Mny
GP 6422 24-May _I
GP 6422 24-May
GP 6422 24-May
GP 6422 24 May
GP 6422' 24-May
GP 6423 24-May
GP 6423 24-May
GP 6423 24-May
GP 6424 24-Mny
GP 6425 24-May
GP 6425 24-May
GP 6425 24-May
GP 6425 24-May
GP 6426' 24-May
GP 6426 24-May
GP 64_6 24-May
GP 6426 24-May
_
GI' 6426 24-May
11 ro rd M , U-Mav
LEONARD.OBRIEN,SpENCER.GAIX&.SA _ TOTAL CLAIM _ - -
J Leonard,OBrien,Spertcer, Gale & Sayre_ MunieMtrs TdContRe SpecialUses -
LeonaAOBrien Spencer. Gale & Sere XcelEnergyTransformerHaulRoute�M_pwdloinlPo
. Leonard,OBrien,Spenoer. Gale & Sayre Hi llaryFarmIkwelopm-
SEH, INC. TOTAL CLAIM -
City En neeri Servicea:MismllarteouSExtra Svc
SEH, Inc. y -'
SEH, Inc. Hillary Farms Subdivision _
North Scheuneman Road Sewer
SEH. Inc. -
SEH. Inc.NPDES Related Services
Big Fox/Little Fox Pavement Management
SEH, Inc. 8
PRESS PUBLCATIONS TOTAL CLAIM
37.50
250.00
2,000.00ent
488.00
2,501.00
_
2,6.00
61.00
61
732.00
535.50
Press Publications
Le Tmns#292062:2003 Unaudited FinStatement
8
Leg llrans#292598:NoliCeofPublicHesring
8 IarTicke ]A5/tick +voiceonly@$7-25/
Reg" - -
TOTAL CLAIM -
Propcd (per $100 Coverege) 4/1/2004�/1/2005_
Municipal Liability Cove 4/1/2004-4/1/2005
Auto Liability & Phyaiwl Damage 4/1/04-4/1/OS
TOTAL CLAIM - -_ -
TeL Mar/Apr 2004 _
0>�cesupplies,Copying&Postage: Mar/Apr-2004
Mikege:Apr/May-2004( ] 30 (u� $0.375 _ _
1ntCmetAccess- 50% :Mar/A r-2003
( )
LapTopCom tea50y6MonthlyPa eM
4.80
Press Publications
27.20
- 988,00
-
_8 254.24
_
_
_ _
35
35.70
27.20
� State One -Call
!.LEAGUE OF MN CITIES INSURANCE TRUST
I League of MN Cities Insurance Trust
League of MN Cities Insurance Trust
League of MN Cities Insurance Trust
80.00
_
836.00
72.00
124.52
MA_GNUSON & ASSOCIES AT. LLC
Magnuson & Associates. LLC
Magnuson &Associates. LLC
I_Magnuson & Associates. LLC
-_ J Magnuson &_ Associates. LLC
t Maenuson & Associates. LLC
152.77
48.95
11.95
_ _ -
50.00
Run Date & Time: 05/24/2004 at 04:43:24 PM
File: 04claim05.123
r . ¢..
• - a..
Claims For Payment CITY OF GEM LAKE Period Ending 05/24/2004
Paul Emeott, Mayor
Chuck Watson, Council
Roland Birkebak, Council
Richard Bosak, Council
Patrick Igo, Council
Frederic Magnuson, Clerk
Si natures A i iro%in • Claims for I'm anent
Date Of Approval
DATE
DATE
DATE
A '
DATE I
DATE
DATE
DATE GENERAL I SEWER
CLAIM# I PAID PAID TO DESCRIPTION OF CLAIM S AMOUNT I FUND FUND
GP 6426 24-M:
GP 6426 24-M;
GP 6426 24-Mi
GP 6426 24-MI
GP 6426 r 24-M,
GP 6426 24-Mi
GP 6426 24-Mi
GP 6426 24-Mi
GP 6426 24-M
GP 6427 24-M;
GP 64271 24-M'
GP 6427 24-M
GP 6427i 24-M
GP 6427: 24-M
GP 6428 24-M
GP 6429 24-M
ALL 0511'
- ALL 05/1'
s ALL 0511'
j
Maenuson &Associates. LLC
Nssistantaerk.Apr/May-2004: 17.00 hours
Lonino(!Tm, Apr/May-2004: 04.75 hours
_ZoningAdminBillable,ApL/ a 2004: 01.25 hours
GenemlAdmin, Apr/May-2004: 28.50 hours
_
850.001
y
y Magnuson & Associates. LLC
y Magnuson & Associates. LLC
y Magnuson & Associates. LLC
356.25
93.75
2,137.50
y Magnuson & Associates. LLC
GencralAdminBillable, Apr/May-2004: 16.50 hours
SewerAdminft! Qp 004: 29.00 hours
May-2
SewerAdminSC, Apr/May-2004: 06.00 hours
ChiefElectiooJudge:ApdMay-2004: 00.50 hours
1,237.50
y MaMnuson & Associates. LLC
2,175.00
y
'y
Magnuson & Associates. LLC
Magnuson & Associates. LLC
300.00
22.50
ry
Magnuson & Associates. LLC
CodcEnforcement_:A_pdMay-2004: 09.25 hours
TOTAL CLAIM
693.75
ry
PAUL R. EMEOTT
1,426.25
Paul R. Emeott
SewerFea"Wity/Schetlnemanitt 6.75 hours _
506.25
ry
Paul R. Emeott
HillaryForm: 10 hours
Hansen GBII: 2 hours
750.00
150.00
ty
Paul R. Emeott
iy Paul R. Emeott
ty George Jun mann
Intergovernmental Meeting
20.00
Spri 2t1$ 004: Street Sweeping
480.00
_ 40.00
$36,656.45
13.16%
1119,281,10
49.98%
($23,177.63
-8.32%
480.00
ty City Of White Bear Lake
2004 Ramsey County GIS Fees
TOTAL FOR MAY
% Annual Budget
TOTAL YEAR-TO-DATE
% Annual Budget
Annual Budget $Under/($Over)
Annual Budget %Under/ -%Over
40.00
$28,124.87
10.09%
1107,110,99
46.86%
($11,869.32
_ -5.19%
S8,531.:
3.06
132,120,
64.31
($11,30K
-22.64
'/2004 MAY SUMMARY
8.33% Of Budget Monthly
72004 YEAR-TO-DATE SUMMARY
41.67% Of Year Completed
1/2004 ` VERSUS ANNUAL BUDGET
1 41.67% Of Year Completed
Run Date & Time: 05/24/2004 at 04:43:24 PM File: 04claim05.123
GENERAL FUND CHECKING 2004 CITY OF GEM LAKE
TREASURER'S REPORT
Y OF GEM
County
Gem Lake, MN
LAKE
Road "E"
55110-5231
East
GENERAL
FUND
CHECKING
C
H
K
I
N
4
4
4
4
4
4
4
4
01-Jan-04
START
45943.83
79047.60
45712.78
47,143.83
BANK
BALANCE
39,%9.23
38,807.46
-79125.11
46021.34
-33103.77
DEBIT
6.99
(1.161.
(100.00
1,101.41
(34.00
(22.00
(240.00
(2,300.00
CREDIT
47045.24
BALANCE
41,070.64
39,908 87
TRAM
DATE
TRAN
#
CHECKS TO
DEPOSITS FROM
Deluxe Business Systems/Business Products
AEN O. ZEPPER
LL
Ramsey County League of Local
CITY OF WHITE BEAR LAKE
GOPHER STATE ONE -CALL
PRESS PUBLICATIONS
Avenel, LLC
Smith Schafer & Associates, Ltd.
PAYMENT FOR
General Fund Check Reorder
TOTAL CLAIM
2004 RCLLG Membershi Dues
TOTAL CLAIM
TOTAL CLAIM
TOTAL CLAIM
Twelve Months Hosting KebSite 4/1/04-3/31/01
FinStatemnisFoi2003/CompOthr FormsFOrFI
09-Apr.04
30•Apr-04
30-Apr-04
lecWith
P6392
P6393
['6394
GP6395
GP6396
39,W8.87
39,707.46
38,673.46
39.651.46
38,411.46
36,111.46
38,707.46
37 606.05
37,572 05
37,550.05
37,310.05
35 010.05
27-A r 04
27-Apr-04
28 Apo-04
27-A 04
P6397
22-A 04
P6398
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
(789.00
(200.00
1,200.00
(413.12
(47.60
(60.55
(291.30
(5,045.19
(2,074.00
(475.00
5,867.60
(1,480.98
35,322.46
35,122.46
35,122.46
33,922.46
33,461.74
33.401.19
33,119.89
29,074.70
26,000.70
25,525.70
18.177.12
34.221.05
34,021.05
34,021.05
34,021.05
93
33,560.33
33.499.78
33,218.48
28,173.29
26,099.29
25,624.29
19,756.69
15-Apr-04
GP6399
St. Marys of the Lake School
Friends of the Parks & Trails
Willow Lane BI School
INTERNAL REVENUE SERVICE
Press Publications
Xcel
F Z Recycling, Inc.
Ran-cy County
SEH, INC.
LEONARD,OBRIEN,SPENCER.GALE&S
MAGNUSON & ASSOCIATES, LLC
PAUL R. EMEOTT
WALLY HILKE
leTowing
Olson Construction
State of Minnesota
Sing Enterprhms, LLC
Paragon Pool
Pamela Docken
KENNETH KIRCHOFF
LARRY WEBER
Robert Cartier
Dale Swomley
White Bear Lions Club
MARK SWEET
General Investment Funds
Parks & Playgrounds Fund
Premier Bank
Charitable Gambling Donation - 2003
Charitable Gambling Donation - 2003
Charitable GamblingDonation - 2003
1ST QTR 2004 WITHHOLDING
Leh Trans#291391: PublicNotice #2004-07
Street Lightin March 2004
Curbside Recycling: April 2004
Law Enforcement: Apr'12004
TOTAL CLAIM
TOTAL CLAIM
TOTAL CLAIM
TOTALCLAIM
TOTAL PAYMENT
Application for Interim Use Permit
Buildin Permit #B2004-06
Traffic Fines: March 2004
2004 TobaCWReseHU4jdrnmSfToPrevi
Building Permit #132004-05
Building Permit #B2004-07
TOTAL PAYMENT
TOTAL PAYMENT
Document Sales: Ordinance No. 43
Document Sales: Zoning Ordinances
1st Qtr 2004 Charitable Gembft
TOTAL PAYMENT _
Reimburse Unbudgeted NPDES Dcvclo mant 0
ReimburwSidewalkPubm upn®Vadn!isHgts
Interest Paid This Period
20-A -04
GP6400
19-Apr 04
P6401
26-Apr-04
P6402
23-A -04
GP6403
26-A -04
23-A -04
28-A -04
P6404
P6405
P6406
23-A -04
7
26 -04
GP6408
21-A -04
21-Apr-04
02_Apr-04
P6409
GP6410
1
2,911.48
150.00
125.70
82.00
250.00
586.55
127.50
543.43
2,755.64
11.80
56.25
764.00
543.53
18,177.12
21.088.60
21,238.60
21.364.30
21,446.30
21696.30
22,282.85
22.410.35
22.953.78
25,709.42
25,721.22
25.777.47
26,541.47
27,095.00
71
18197.19
21,187.19
21,337.19
21,462.99
21 544.89
21,794.89
22,391.44
22.508.94
23,052.37
25.809.01
25,919.91
02-Apr-04
2
0¢Apr-04
09•Apr-04
1
2
09-Apr-04
3
Ib A 04
1
qpr pq
npr-04
30 -04
1
2
1
2
3
4
30-Apr-04
30.A -04
30-Apr704
25,876.06
26.640.06
27-183.59
30-Apr-04
20 -04
5
I
4
4
4
8,925.00
11,000.00
35.24
36,010.00
47,010.00
47,045.24
36,108.59
47.108.59
47,143.83
20-q -04
30 Aprv04
2
1
Run Date: 05/10/2004 at 10:33:07 AM E-File: PGFCheck04.123 Page 1 of 1
:z,I: Premier
■ 02 Bank Minnesota Owned. Minnesota Operated.
CITY OF GEM LAKE
GENERAL FUND
1369 COUNTY ROAD E E
GEM LAKE MN 55110-5231
Page: 1
Account Number: 6005590
Statement Date: 4/30/04
Checks/Items Enclosed: 26
IMAGE STATEMENTS HAVE ARRIVED
Premier Bank is pleased to present to you
our new statement format.
You will now find your information on both
the front and back of the page.
PREFERRED ELITE CITY OF GEM LAKE
GENERAL FUND
Beginning Balance 4/01/04
Deposits / Misc Credits 8
Withdrawals / Misc Debits 20
**:Ending Balance 4/30/04
Service Charge
Interest Paid Thru 4/30/04
Interest Paid Year To Date
Average Balance
Average Collected Balance
Mini mn= Balance
Average Rate / Cycle Days
Enclosures
Miscellaneous Credits
Date Deposits Withdrawals
4/02
3,061.48
4/09
457.70
4/16
586.55
4/20
8,925.00
4/20
11,000.00
4/23
670.93
4/30
4,131.22
4/30
35.24
40,230.92
28,868.12
21,955.21
47,143.83
.00
35.24
188.47
46,163
45,618
40,230
.94000 / 30
26
Activity Description
DEPOSIT
DEPOSIT
DEPOSIT
DEPOSIT
DEPOSIT
DEPOSIT
DEPOSIT
INTEREST EARNED
86
Act # 6005590
1 L=.l
MUM "Ousm
LENDER
MEMBER FDIC
CFF GF\/FRCP CIIIF PnR AnnfflnNAI 1NFnRMATInr'
Page: 2
CITY OF GEM LAIKE Account Number: 6005590
Statement Date: 4/30/04
Miscellaneous Debits
Date
Deposits
Withdrawals
Activity Description
4/08
76.99
DELUXE BUS SYS./BUS PRODS
FREDRIC MAGNUSON
Paid Checks
* indicates skip in check numbers
Date Check No.
Amount
Date
Check No. Amount
Date
Check No.
Amount
4/22
6381 0001
184.70
4/22
6398 2,300.00
4/23
4/28
6405
6406
281.30
5,045.19
4/30
6392*0001
1,161.77
4/15
4/20
6399 789.00
6400 200.00
4/23
6407
2,074.00
4/30
4/27
6393 0001
6394 0001
100.00
1,101.41
4/26
6402* 413.12
4/26
6408
475.00
"'27
6395 0001
34.00
4/23
6403 47.60
4/21
6409
5,867.60
28
6396 0001
22.00
4/26
6404 60.55
4/21
6410
1,480.98
4/27
6397 0001
240.00
Daily Balance Sunmwxy
Date
Balance
Date
Balance
Date
Balance
4/02
43,292.40
4/20
63,195.66
4/26
50,681.74
4/08
43,215.41
4/21
55,847.08
4/27
49,306.33
4/09
43,673.11
4/22
53,362.38
4/28
44,239.14
4/15
42,884.11
4/23
51,630.41
4/30
47,143.83
4/16
43,470.66
j
SEWER FUND CHECKING 2004 CITY OF GEM LAKE
TREASURER'S REPORT
Y OF GEM
SEWER
FUND
C
H
04 Jan
START
LAKE
i County
Road "E" East
CHECKING
K
28509-33
-23589.73
10224.90
33814.13
DEBTT
CREDTT
28509..33
8509K
BALANCE
Gem Lake,
MN 55110-5231
I
N
BANK
BALANCE
TRAN
TRAN
CHECKS TO
DATE
9
DEPOSITS FROM
PAYMENT FOR
Current User Charges: M 2004
4
4
-879.93
-20000.00
45474.74
25474.74
45474.74
25474.74
23-A -04
SP2036
Me lilan Council
20-p -04
Sp2037
Premier Bank
CD Investment 4/19/2004
4
30.00
25504.74
25504.74
09-Apr-04
1
Sandra Kuchenmeister
1st 2004 Sewer Fees/Residential
�
630.00
26134.74
26134.74
09.Apr-04
2
ALLEN DRUMMOND
TOTAL PAYMENT
4
4
30.00
26164.74
26164.74
09-A -04
3
Gertrude Hannah
4 Sewer F/Residential
1st Qtr 200Fees/Residential
60.00
26224.74
26224.74
09-Apr-04
4
Flanagan Prp LLC
ist 2004 Sewer Fees/Commercial
4
4
120.00
26344.74
26344.74
09-Apr-04
5
Rhino Linings
1 st Qtr 2004 Sewer Fees/Commercial
30.00
26374.74
26374.74
16-A r-04
1
John Hurt
1st 2004 Sewer Fees/Residential
4
4
30.00
26404.74
26404.74
16 Apr 04
2
Knut
1 st Qtr 2004 Sewer Fees/Residential
30.00
26434.74
26434.74
16-A 04
3
David Hanson
1st 2004SewerFees/ResideMial
4
30.00
26464.74
26464.74
I&Apr 04
4
Peter Oswald
1st 2004 Sewer Fees/Residential
4
30.00
26494.74
26494.74
16-A {µ
5
John Birkeland
1st 2004SewerFees/Residential
4
34.00
26528.74
26528.74
16-Apr-04
6
TIM DRAINS
TOTAL PAYMENT
1st 2004 Sewer Fees/Residential
4
4
30.00
150.00
26558.74
26708.74
26558.74
26708.74
16 A 04
7
Matt Flynn
16 -04
8
ARNCO INDUSTRIES. INC.
TOTAL PAYMENT
1st 2004 Sewer Fees/Commercial
4
4
4
180.00
120.00
26888.74
27008.74
26888.74
27008.74
16-Apr-04
9
Country Lounge. Inc.
16:Apr-04
l0
White Bear Floral
1st 2004 Sewer Fees/Commercial
144.00
27152.74
27152.74
16-Apr-04
11
POD'S TIRE & WHEEL
TOTAL PAYMENT
4
4
1080.00
28232.74
28232.74
16-Apr-04
12
Tousl Ford
lst Qtr 2004 Sewer Fees/Commercial
30.00
28262.74
28262.74
23-A
1
Ruth Luh
l st Qtr 2004 Sewer Fees/Residential
4
30.00
28292.74
28292.74
2}A -04
2
Kou Vang
1st Qtr 2004 Sewer Fees/Residential
1st 2004 Sewer Fees/Commercial
4
4
4
180.00
30.00
28472.74
28502.74
28472.74
28502.74
23-Apr 04
3
Cafe Cravin
1
Uoyd Lahore
1st Qtr 2004 Sewer Fees/Residential
6.59
28509.33
28509.33
30•A r-04
1
Premier Bank
Interest Paid This Period
4
Run Date: 05/10/2004 at 10:50:18 AM
E-File: PSFCheck04.123 Page 1
LrNO
LENDER
MEMBER FDIC
NMIX
Premier
Bank Minnesota Owned. Minnesota Operated.
CITY OF GEM LAKE
SEWER FUND
1369 COUNTY ROAD E E
GEM LAKE MN 55110-5231
Page: 1
Account Number: 6005582
Statement Date: 4/30/04
Checks/Items Enclosed: 6
86
IMAGE STATEMENTS HAVE ARRIVED
Premier Bank is pleased to present to you
our new statement format.
You will now find your information on both
the front and back of the page.
PREMIER PLUS CITY OF GEM LAKE
SEWER FUND
Beginning Balance 4/01/04
Deposits / Misc Credits 5
Withdrawals / Misc"Debits 2
** Ending Balance 4/30/04
Service Charge
Interest Paid Thru 4/30/04
Interest Paid Year To Date
Average Balance
Average Collected Balance
Minimum Balance
Average Rate / Cycle Days
Enclosures
miscellaneous Credits
Act # 6005582
46,354.67
3,034.59
20,879.93
28,509.33 **
.00
6.59
28.90
40,434
40,096
28,472
.20000 / 30
6
Date
Deposits
Withdrawals Activity Description
4/09
870.00
DEPOSIT
4/16
1,888.00
DEPOSIT
4/23
240.00
DEPOSIT
4/30
30.00
DEPOSIT
4/30
6.59
INTEREST EARNED
Paid Checks -
* indicates skip in check numbers
Date Check No. Amount Date Check No. Amount Date Check No.
4/23 2036 0001 879.93 4/20 2037 20,000.00
Amount
CFF RF\/FRCP ginp r:np annITI()KIA1 IAIFf PKAATIr1KI
Page: 2
ciTY OF GEM LAKE
Account Number:
6005582