My WebLink
|
Help
|
About
|
Sign Out
Home
2011-08-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2011
>
2011-08-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2011 8:55:13 AM
Creation date
8/19/2011 8:45:18 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/23/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Removal - Existing traffic management measures and /or measures installed under the Program <br />may be requested to be removed. The request for removal of a project will be processed <br />generally using the same procedures as outline in this program requiring written request and <br />appropriate neighborhood approval. <br />5.0 Procedural Details <br />Step 1 - Identify Candidate Streets /Neighborhoods <br />The street in question must be classified as a Local (residential) street in the City of <br />Roseville Transportation Plan (see Figure 4.10 from Roseville Transportation Plan in <br />Appendix D). <br />The requests must be related to speeding, excessive traffic volumes, crashes, cut - <br />through traffic, truck traffic, non - motorized transportation safety or other related impacts <br />on a residential street. <br />If it is determined that the request falls under the function of this plan, then Step 3 will be <br />initiated. If not, the request shall be followed up as appropriate by the City Engineer as part of <br />the Departments normal function, including coordination with Police, Fire, and Public Works <br />Departments as needed. <br />Step 3 - Data Collection and Traffic Study <br />If it is determined that the request falls under the guidelines of the management program, the <br />City Engineer will conduct an engineering study of the street(s) or neighborhood. The study will <br />include the following actions: <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.