My WebLink
|
Help
|
About
|
Sign Out
Home
2011-08-18_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Grass Lake WMO
>
Agendas and Packets
>
201x
>
2011
>
2011-08-18_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2011 9:08:02 AM
Creation date
8/19/2011 9:06:03 AM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Grass Lake WMO
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
8/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 12, 2011 <br />Members of the Board <br />Attached is the invoice from Ramsey County Public Works (RCPW) for the Lake <br />Wabasso Veg. surveys that were performed in June and late -July 2011. Note:. The <br />Wabasso invoice amount is exactly what the contract states (see attached). <br />The total invoice is for $2,095.70. Of this amount, $1,965.70 is for the two Wabasso <br />surveys and $130.00 is for Owasso project GI$ Prep -work. <br />It appears that RCD billed the RCPW for some " GIS prep - work" for the, at the time <br />proposed Lake Owasso study, before the GLWMO canceled the Owasso project. <br />I've asked Ann W. from the RCD to provide me with documentation that they invoiced <br />RCPW and were paid for the two hours for Owasso study prep -work and the other work <br />they contributed to the Wabasso studies (see attached). <br />I recommend the GL WMO reimburse the RCPW for the amount of $2,095:70, including <br />the $130.00 paid to the RCD by the RCPW for the Owasso work. <br />Sinee ly. <br />Tom Petersen <br />
The URL can be used to link to this page
Your browser does not support the video tag.